Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal for grant permission for laying Steel Gas Pipeline along on Pune - Nashik Road NH-60 Km,202/350 to Km, 204/500, Km, left side going and 204/500 to 205/000 RHS side and Crossing at Km, 202/350, 204/500 Total length 7.120 Km, in the state of Maharashtra. Applicant: M/s GA, Maharashtra Natural Gas Ltd, A-Block, Plot No.27, Narveer Tanajiwadi, PMPML Commercial Building Shivajinagar Pune-411005.

    ... Language English Document Date:  Wednesday, December 22, 2021 ...

    morthadmin - 12/23/2021 - 10:10 - 0 comments

  2. Proposal for grant permission for laying Steel Gas Pipeline along on Pune - Nashik Road NH-60 Km,190/200 to Km, 198/200, Km, 177/000 to 185/500 Right side going towards Nashik and Crossing at Km, 197/500 Total length 16.5 Km, in the state of Maharashtra. Applicant: M/s GA, Maharashtra Natural Gas Ltd, A-Block, Plot No.27, Narveer Tanajiwadi, PMPML Commercial Building Shivajinagar Pune-411005.

    ... Language English Document Date:  Wednesday, December 22, 2021 ...

    morthadmin - 12/23/2021 - 10:06 - 0 comments

  3. NHAI-RO Kerala- Six Laning of Thaliparambha- Muzhapilangad section from Km 137.900 to Km. 170.600 of NH-17 (New NH-66) (project length 29.948 km) in the State of Kerala on Hybrid annuity Mode under BharatmalaPariyojana-Laying of OFC cable of M/s Kerala State IT Infrastructure Ltd for KFON Project along Valapattanam Bridge for 450 m on existing NH-66 in Kannur District , etc.

    ... 1689-2021(1).pdf Language English Document Date:  Tuesday, December 21, 2021 ...

    morthadmin - 12/22/2021 - 17:05 - 0 comments

  4. NHAI - RO Hyderabad - PIU Nirmal- Proposal for laying of Optical Fiber Cable for a total length of 7.540 Km from Km.447+700 to Km.448+680 (RHS),from Km.449+210 to Km.450+475 (RHS), from Km.452+225 to Km.453+500 (LHS), and from Km.457+240 to Km.461+140 (RHS) along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.453+500, & Km.458+200 on Nagpur to Hyderabad section of NH-44 in the State of Telangana

    ... 2493 dated 21.12.2021(1).pdf Language English Document Date:  Tuesday, December 21, 2021 ...

    morthadmin - 12/22/2021 - 17:04 - 0 comments

  5. Laying of OFC (Aerial) on valley side from Km 85.500 (Chakori) to Km 66.000 (Raiagar) along NH-309A for Total length of ROW is 19.500 Kms in Pithoragarh District in the State of Uttrakhand

    ... Dated 22.12.2021_0001(1).pdf Language English Document Date:  Wednesday, December 22, 2021 ...

    morthadmin - 12/22/2021 - 11:10 - 0 comments

  6. Permission for laying of 200 mm diameter sewerage pipe from km 53.440 to km 55.000 (LHS) and km 53.700 to km 54.500 (RHS) along NH-503 A in Amritsar Tanda section at Tehsil Batala , District-Gurdaspur in the State of Punjab by open cut method.

    ... 425-5411 dt 21.12.2021.pdf Language English Document Date:  Tuesday, December 21, 2021 ...

    morthadmin - 12/22/2021 - 11:09 - 0 comments

  7. NH access permission to the proposal Fuel station (retail outlet) located on a plot of land abutting on the Left hand side boundary of NH-31(old)/27 (New) towards increasing chainage in Km. 1026.0228 at location village/ town : Rajakhat in the Taluka / Mouza of Bhawanipur Revenue circle : Sarupeta, PO: Bhawanipur, PS: Barpeta, District: Barpeta, Assam Pin-781352.

    ... 22586(1).pdf Language English Document Date:  Monday, December 20, 2021 ...

    morthadmin - 12/22/2021 - 09:47 - 0 comments

  8. RoW permission for installation of Smart Elements (CCTV Cameras, Traffic Signals, SVDS, etc) on cantilever pole and Gantry at Puri Road- Daya River Bridge· Lingipur Chowk JKm.11+450) on NH·316 and Palasuni Chhak (Km.3+275) on NH·16 under smart solutions project Of Bhubaneswar Smart City Limited

    ... 3432-3433.pdf Language English Document Date:  Tuesday, December 21, 2021 ...

    morthadmin - 12/22/2021 - 09:46 - 0 comments

  9. Six Laning from existing Km. 494+410 to existing Km. 509+550 of NH-8 in the state of Gujarat on EPC Mode under NHDP Phase-V (Package- VII): Reg. Proposal for ROW permission for laying 8” Dia Steel Gas Pipeline across NH-48 at Km 555+250 on Mota Chiloda to Nana Chiloda section of NH-48 in the state of Gujarat.

    ... File:  94.pdf Language English Document Date:  Monday, December 20, 2021 ...

    morthadmin - 12/21/2021 - 14:46 - 0 comments

  10. Proposal for ROW permission for laying 66 KV 1Cx630 sqmm Power Cable along NH-48 from Km 81+780 to Km 82+365 (LHS) and Across NH-48 between Km 82+365 and Km 82+425, near Village-Mogar, Taluka & District-Anand on Ahmedabad-Vadodara section of NH-48 in the state of Gujarat.

    ... Km 82+425_PD-Abad-105596(1).pdf Language English Document Date:  Monday, December 20, 2021 ...

    morthadmin - 12/21/2021 - 14:45 - 0 comments

Pages