Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal for grant of permission for laying underground PHED Pipeline dia 350mm DI K-7 along NH from Mahabar Fanta to towards PWD NH Barmer (Chouhatan Choraha) on NH-68 (Barmer-Gandhav Bridge) from Km. 155+500 to 155+873 (0.373 km length) & crossing at Km. 155+873 (All Open Trench) under service road in the State of Rajasthan by PHED

    ... 2800 dt 26.12.2022-invi.pdf Language English Document Date:  Monday, December 26, 2022 ...

    morthadmin - 12/27/2022 - 16:51 - 0 comments

  2. Six laning of Existing Kozhikode Bypass (i.e. Vengalam Jn. to Ramanattukara Jn.) from km 230.400 to km 258.800 (Design Chainage) of NH-66 in the State of Kerala under NHDP Phase-III on Hybrid Annuity Mode -Crossing of new M/s IOAGPL gas pipeline at Km.245+605 in Kozhikode Bypass

    ... 2110-2022-inviitaion.pdf Language English Document Date:  Monday, December 26, 2022 ...

    morthadmin - 12/27/2022 - 16:41 - 0 comments

  3. Permission for upgradation of existing 132 KV D/c Tower line into 220 KV M/c overhead tower line to be constructed by the M/s Torrent Power parallel to NH-147 between km 35/900 to km 40/900

    ... 132 KV DC tower line_0001.pdf Language English Document Date:  Monday, December 26, 2022 ...

    morthadmin - 12/27/2022 - 11:46 - 0 comments

  4. Four Laning of Kazhakuttam to Mukkola section (Km.0+000 to Km.26+500) of NH-66 in the State of Kerala under NHDP Phase-III on EPC mode- Crossing of new M/s AG&P City Gas Pvt.Ltd. gas pipeline at Km.02+272, Km.10+300 and Km.12+105 in Thiruvananthapuram Bypass

    ... 2108-2022-invitation.pdf Language English Document Date:  Monday, December 26, 2022 ...

    morthadmin - 12/26/2022 - 17:10 - 0 comments

  5. Proposal of permission for water pipeline along both sides and across NH-33 for Ramgarh, Chittarpur & Dulmi Water supply Scheme (Part-B)

    ... 3396-public.pdf Language English Document Date:  Friday, December 23, 2022 ...

    morthadmin - 12/26/2022 - 10:04 - 0 comments

  6. Proposal for permission for crossing of 2 nos Transmission Electrical line 132KV overhead of National Highways, Narmada Valley Development Authority Division No.08, Sanawad at proposed 4 laning of Raghavgarh to Nanasa section of NH-47, design Ch. 36+602, Ch. 35+545 at Village-Bhamori, Tehsil- Bagli, District-Dewas in the State of Madhya Pradesh

    ... 48255-12232022121751.pdf Language English Document Date:  Thursday, December 22, 2022 ...

    morthadmin - 12/23/2022 - 16:15 - 0 comments

  7. Approval of installation of a new Fuel Station (Retail Outlet) on a plot of land abutting on Left hand side boundary of NH-37(old)/27(new) towards increasing chainage in Km. 226.905 at village-Kholapather, Mouza-Uttar Khula, dag No. 348, District-Marigaon, State-Assam

    ... 24291-comment.pdf Language English Document Date:  Wednesday, December 21, 2022 ...

    morthadmin - 12/23/2022 - 10:06 - 0 comments

  8. Construction of proposed Fuel Station (Retail Outlet), on a plot of land abutting on the right hand side boundary of NH-37 towards increasing chainage in Km. 1022.420 at village; Banglipara, Mouza – Bhabanipur, District-Barpeta, Assam

    ... 24290-publi-comment.pdf Language English Document Date:  Thursday, December 22, 2022 ...

    morthadmin - 12/23/2022 - 10:02 - 0 comments

  9. Proposal of NOC for laying of Electrical cable (132 KV U/G XLPE cables 630 Sq.mm (4 Nos.) of M/s Amba Shakti Steels Limited from Km.109.857 (RHS) to Km.111.401 (RHS) (Total length- 1544m) on NH-58 (New NH-334) (Delhi to Haridwar Road) at District-Muzaffarnagar in the State of Uttar Pradesh

    ... at District Muzaffarnagar..pdf Language English Document Date:  Thursday, December 22, 2022 ...

    morthadmin - 12/23/2022 - 09:54 - 0 comments

  10. Proposal seeking permission to laying of water pipeline for drinking water scheme along NH 275 from Kabaka Km 10.200 to 10.850 on LHS (650 m), from Km 10.850 to Km 11.100 on LHS (250 m), from Km 11.100 to Km 11.400 on LHS (300 m), from 11.400 to Km. 12.000 (600 m) on LHS, Km 12.000 to Km 12.400 (400 m) on LHS, from Km 12.400 to Km 13.600 (1200 m) on LHS, Km 13.600 to Km 14.150 on LHS (550 m), from Km 14.150 to Km 16.200 on LHS (2050 m), and from Km 16.200 to 16.450 on RHS (250 m), from Km 16.450 to Km 16.850 on RHS (400 m), from Km 16.850 to Km 18.100 on RHS (1250 m) for a total length of 7.90 m through open trench method and three road crossing at Km 11.400, Km 14.100 & Km 16.850 through HDD method in the State of Karnataka by Municipal Commissioner, Puttur City Municipal Council

    ... Km. 10.200 to Km. 18.100.pdf Language English Document Date:  Tuesday, December 20, 2022 ...

    morthadmin - 12/22/2022 - 18:06 - 0 comments

Pages