Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. NHAI, PlU-Chengalpattu-Tambaram to Tindivanam section of NH-45 from Km.28/000 to Km.121/000 in the State of Tamil Nadu-TANTRANSCO - Laying 230KV UG cable from OH&UG common point at Loc.16 CTT tower to proposed 230 KV Maraimalai Nagar SS-Permission to Lay 230KV EHV and OPGW cable in the NHAI Road crossing by trenchless HDD method at Km.45+070-Approval Requested

    ... 620 PIU CPT-invitation-cmt.pdf Language English Document Date:  Thursday, March 30, 2023 ...

    morthadmin - 04/03/2023 - 10:15 - 0 comments

  2. Proposal for laying of a Public Utility–Proposal seeking permission for laying of underground Water Supply Pipe Line along the road in RHS at Km.1/300 to Km.1/330, Km.3/900 to Km.4/400, Km.6/140 to Km.6/170, Km.10/400 to 10/920, Km.16/600 to Km.16/615, Km.19/350 to 21/855, Km.38/305 to 38/580, LHS at Km.1/300 to Km.1/330, Km.3/900 to Km.4/400, Km.6/140 to Km.6/170, Km.10/400 to 10/950, Km.16/600 to Km.16/620, Km.37/180 to Km.37/780, Km.38/580 to 38/610 and across the road at Km.0/600, Km.1/300, Km.4/400, Km.6/140, Km.10/920, Km.16/600, Km.37/480 and Km.38/580 of NH-227 (Trichy to Kallagam Section) by M/s. TWAD Board, Trichy-Approval requested

    ... Lr No 552-comment.pdf Language English Document Date:  Friday, March 31, 2023 ...

    morthadmin - 04/03/2023 - 10:06 - 0 comments

  3. G.S.R. 233(E) regarding extension of date for mandatory testing of vehicles through ATS

    Language English Upload Document File:  GSR 233(E) dated ...

    morthadmin - 03/31/2023 - 21:01

  4. Changes in Standard RFP for HAM and BOT (Toll) Projects

    Language English Upload Document File:  Changes in standard RFP for ...

    morthadmin - 03/31/2023 - 15:44

  5. Proposal seeking ROW Permission for laying Proposed 125mm Dia PE Gas Pipeline along NH-48 (Vadodara-Surat) (Ahmedabad-Mumbai) from Tap-Off Point (On Ex.GGL Gas Pipeline) to Vihar Lake Greenery, Neelkantheshwar Temple, Manan Ashram, 3 Schools & laying Proposed 63mm Dia PE Gas Pipeline along NH-48 from Km 192+402 to Km 192+930 (LHS), (ii) Km 190+974 to Km 188+170 (RHS), (3) Km 190+681 to Km 188+981 (LHS) and across NH-48 at 190+681 from GNFC COCO CNG upto Atithi Resort in Bharuch Taluka of Dist. Bharuch of Bharuch GA

    ... 192+930_PD-Bharuch-196832.pdf Language English Document Date:  Friday, March 31, 2023 ...

    morthadmin - 03/31/2023 - 15:14 - 0 comments

  6. Proposal seeking ROW Permission for crossing of 600mm dia H.S. Pipeline encased in 1000mm Dia RCC NP4 Pipe across at Km 125+365 by Hydraulic Jacking Method on Vadodara-Bharuch section of NH-48 in the State of Gujarat

    ... 125+365_PD-Bharuch-193068.pdf Language English Document Date:  Friday, March 31, 2023 ...

    morthadmin - 03/31/2023 - 15:10 - 0 comments

  7. Proposal of Access Permission for laying of DW&SD Water Supply Pipe Line along & across the NH-33 for "Ghoranegi and adjoining villages Rural water Supply Scheme, Saraikela"

    ... 533-public cmt.pdf Language English Document Date:  Wednesday, March 29, 2023 ...

    morthadmin - 03/31/2023 - 15:06 - 0 comments

  8. 4-laning of Rohtak-Panipat section NH-71A from km. 0.00 (km.63.300 of NH-10) to km. 80.858 (km.83.500 of NH-1) in the state of Haryana on DBFOT Basis under NHDP Phase-III –NOC proposal for Laying of 600mm diameter Sewerage pipeline along the Panipat-Rohtak Section of old NH-71A (New NH-709) from km 13.658 to km 15.008 in the State of Haryana by open trench method

    ... 02-5855 dated 29.03.2023.pdf Language English Document Date:  Wednesday, March 29, 2023 ...

    morthadmin - 03/31/2023 - 13:05 - 0 comments

  9. Rehabilitation and Upgradation of Four laning of Binjhabahal-Telebani Section, Km.414.000 to Km.491.710 (Design Chainage Km.414.982 to Km.493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP-IV on Hybrid Annuity Mode

    ... Language English Document Date:  Wednesday, March 29, 2023 ...

    morthadmin - 03/31/2023 - 11:06 - 0 comments

  10. Permission for laying proposed 6" & 8" Dia Gas Pipeline with OFC Along NH-30 Pilibhit Road) From Design Ch. 0.000 Km to Design Ch. 0.380 Km LHS, From Existing Ch. 328.900 Km to Existing Ch. 324.700 Km LHS, From Design Ch. 4.7 Km to Design Ch. 6.600 Km LHS, From Design Ch. 6.600 Km to Design Ch. 11.060 Km RHS, From Existing Ch. 318.340 Km to Existing Ch. 306.480 Km RHS, From Design Ch. 23.400 to Design Ch. 28.160 Km RHS, From Existing Ch. 301.720 Km to Existing Ch. 292.720 Km RHS & across At Existing Ch. 325.810 Km, At Design Ch. 6.600 Km, At Existing Ch 318.340 Km, At Existing Ch. 309.440 Km& At Existing Ch. 299.100 Km to develop CGD Network in Pilibhit District of Uttar Pradesh State

    ... 17760 final-public-comment.pdf Language English Document Date:  Wednesday, March 29, 2023 ...

    morthadmin - 03/31/2023 - 10:57 - 0 comments

Pages