Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal for NOC permission for laying and crossing of CNG carbon steel pipeline of 150mm by trenchless HDD method in Km.01 .776 to Km.02.531 (near Verma filling station) in RHS of NH-24A in the State of Uttar Pradesh

    Upload Document File:  1-Inv-cmt-Letter no.1617 sated 22.11.2024.pdf ...

    morthadmin - 11/26/2024 - 14:39 - 0 comments

  2. Permission for laying of underground optical fiber cable (40mm dia HDPE duct pipe) by “Bharti Airtel Limited” from route Km. 301550 to Km. 30+950 (RHS) on National Highway No. 8 (New NH-48) of Delhi-Jaipur Road, Gurugram, Haryana

    Upload Document File:  3-Inv-letter no. 3116 dated 10.09.2024.pdf ...

    morthadmin - 09/10/2024 - 14:39 - 0 comments

  3. Permission for laying of 4” Dia underground Carbon Steel Gas Pipeline by HDD method along NH-334B from Km. 13+181 to Km. 14+268 (RHS) for providing Natural Gas connectivity to M/s Sanjay Kumar near Rathdhana District-Sonepat(HR)

    Upload Document File:  1-Inv-02-2565 dated 09.09.2024.pdf ...

    morthadmin - 09/09/2024 - 12:22 - 0 comments

  4. Providing NOC for the permission of laying U/G water pipeline (DI/MS pipe) by HDD method along NH-35 Prayagraj-Banda road, from Ch. 201.555 to Ch.193.956, LHS (Length-7599.0m) and from Ch.190.174 to Ch.175.399, LHS (length-14775.0m) and five Nos. Crossings at Ch.175.399, Ch.181.795, Ch. 185.980, Ch.195.646 & Ch. 201.516 (Length 20m+24m+44m+20m+20m=128.0m), total length-22502.0m at Gram Panchayat-Janawa, Lakhanpur, Kapari, Bara khas and Pandar, District-Prayagraj in the State of Uttar Pradesh

    Upload Document File:  2-Inv-Letter no.1012 dated 03.09.2024.pdf ...

    morthadmin - 09/06/2024 - 10:07 - 0 comments

  5. Proposal for underground laying of 63 mm dia. MDPE pipeline by HDD method along NH-44 from km. 51+190 to 51+560 (LHS) for providing natural gas connectivity to Nelkhanth Star, Dhaba, Hasanpur, Sonepat (HR)

    Upload Document File:  10-Inv-02-2483 dated 05.09.2024.pdf ...

    morthadmin - 09/05/2024 - 16:51 - 0 comments

  6. Proposal for grant of Right of Way Permission for laying Optical Fiber Cable along NH-44 (from Ronda to Masaura Chowk)-Chainage km. 91.320 to 99.000 (LHS)-Total length 7.680 km) by HDD Methodology under District-Lalitpur in the State of Uttar Pradesh

    Upload Document File:  2-Inv-cmt-pub-1644 dt. 21.11.2024.pdf ...

    morthadmin - 11/22/2024 - 10:25 - 0 comments

  7. Proposal for permission of underground road crossing of 33KV line by trenchless (HDD) method at Ch 153.452 of Sindoor-Bareli section of NH-45 in Village-Bhopatpur, Tehsil-Deori, District-Raisen in the State of Madhya Pradesh

    Upload Document File:  3-Inv-03092024-sep-pub-letter dated 03.09.2024.pdf ...

    morthadmin - 09/03/2024 - 14:24 - 0 comments

  8. Permission to lay the underground water pipeline along the NH by Open Trench Method and across NH sections of NH-209 by HDD method in Dindigul District

    Upload Document File:  3-Inv-E-246794 merged.pdf ...

    morthadmin - 08/30/2024 - 10:29 - 0 comments

  9. Permission of underground water supply pipe line crossing by HDD/ pushing method at Km 37+000 on NH-31(Raebareli-Unnao section) at Unnao in the State of Uttar Pradesh

    Upload Document File:  6-Inv-letter no 2967 dated 30 08 2024-Distt Unnao.pdf ...

    morthadmin - 09/02/2024 - 10:51 - 0 comments

  10. Proposal for laying of Natural Gas Pipeline of 125mm dia by M/s. Bhagyanagar Gas Limited for a length of 3795m from Km. 468+055 to Km. 471+850 (RHS) in Utility Corridor on Nagpur-Hyderabad section of NH-44 in the State of Telangana

    Upload Document File:  1-Inv-Lr No.960 NIC 25011-3-39 BGL.pdf ...

    morthadmin - 09/02/2024 - 10:25 - 0 comments

Pages