Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Laying of water pipeline in NH-544H road along the road from Km 67/4 to Km 68/4, Km 74/0 to Km 74/2 by open trench and crossing at Km 68/6 and Km 74/2 by HDD method

    Upload Document File:  5-Inv-423 dt. 02.04.2025 - Invitation of Public Comments.pdf ...

    morthadmin - 04/02/2025 - 16:10 - 0 comments

  2. Permission regarding “A crossing at Chainage at 404+900 of NH-12 (Old NH-34) 1.50m beneath the E.G.L by Jack pushing /HDD method at Chapduar pied water supply scheme (under Jal Jeevan Mission) at Raiganj Block under Raiganj Division, PHE Dte Uttar Dinajpur

    Upload Document File:  4-Inv-cmt-425 dt 02.04.2025.pdf ...

    morthadmin - 04/03/2025 - 13:18 - 0 comments

  3. Permission of laying of 110 mm dia to 250 mm dia water carrying pipe from Chainage 3314400 to 334+650 along both the sides of NH-12 by Trenching and refilling method and a crossing at chainage point at 334+500, 334+100. 333+800, 333+580, 331+600 332+700 (Jack pushing) above the crust of an existing culvert under Kaluari Piped water supply scheme at OLD MALDA Block under Malda Division, PHE

    Upload Document File:  3-Inv-426 dt 02.04.2025.pdf ...

    morthadmin - 04/03/2025 - 13:13 - 0 comments

  4. Proposal for erection of 33KV electrical lines with 2 Nos of M+ Type Poles across the road @ Km 25/080 by using Overhead method by M/s Renfra Energy India Pvt. Ltd. in Tuticorin–Tirunelveli Section of NH-138 in the State of Tamil Nadu

    Upload Document File:  11-Inv-comment-E-277211 merged.pdf ...

    morthadmin - 04/01/2025 - 16:02 - 0 comments

  5. Proposal for the permission of laying U/G Optical fiber cable by HDD method along/across NH-30, Lucknow Raebareli Road, from Ch.22.495 to Ch.24.851 (LHS) Total length-2356 mtr at Mohanlalganj, District-Lucknow in the State of Uttar Pradesh

    Upload Document File:  7-Inv-pub-cmt-3066.pdf ...

    morthadmin - 02/13/2025 - 12:53 - 0 comments

  6. Proposal for permission of underground road crossing of 33KVA Electric line by trenchless (HDD) method at Ch 35+915 of Jirapur-Susner section of NH-752B in Village-Palda by Beepow Energy Pvt. Ltd. in the State of Madhya Pradesh

    Upload Document File:  8-Inv-cmt-1002-2025_merged.pdf ...

    morthadmin - 02/11/2025 - 11:16 - 0 comments

  7. Proposal for NOC for Overhead crossing of NH-34 by 400 KV D/C Farrukhabad-Maheba Transmission Line (Pkg-09) Ch. 307+450, Between Tower No. AP26-AP27, Near-Barauli & Barua Sabalpur Village, District-Kannauj in the State of Uttar Pradesh

    Upload Document File:  2-Inv-cmt-letter no-25851 dt-12.02.2025 public- comment piu- kanpur.pdf ...

    morthadmin - 02/13/2025 - 10:03 - 0 comments

  8. Proposal for NOC for overhead crossing of NH-19 by 400 KV D/C Farrukhabad Maheba Transmission Line (Pkg-09) Ch.399+226, Between Tower No. AP140-AP141, Near-Sikandra, District-Kanpur Dehat in the State of Uttar Pradesh

    Upload Document File:  letter no-25850 dt-12.02.2025 public- comment piu-kanpur.pdf ...

    morthadmin - 02/12/2025 - 18:05 - 0 comments

  9. Proposal for permission of laying U/G optical fiber Cable (OFC) by HDD method along/across NH-27, Faizabad–Lucknow Road from Ch.16.325 to Ch. 15.030 (RHS) total length-1295 mtr at Gram Panchayat-Narendi, Block–Chinhat, District-Lucknow in State of Uttar Pradesh

    Upload Document File:  5-Inv-public-2992 (1).pdf ...

    morthadmin - 02/11/2025 - 10:35 - 0 comments

  10. Laying of 3C*300 Sqm 11 KV UG XLPE Power cable by KSEB from Km.45+500 to Km.46+450(RHS) & Km.46+450 to Km.46+820(LHS) & crossing at Km. 45+500 & Km. 46+450 of NH-966

    Upload Document File:  1-Inv-cmt-282-2025-Signed.pdf ...

    morthadmin - 02/11/2025 - 10:15 - 0 comments

Pages