Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal seeking permission for laying of water supply along NH-69 (Old NH-206) between Km 345.500 to 370.600 through open trench method and 12 nos. crossing at Km 346.010, Km 349.270, Km 350.700, Km 352.780, Km 354.850, Km 355.730, Km 359.250, Km 363.100, Km 363.920, Km 366.820, Km 368.450 & Km 369.500 through HDD method, by KUWS & DB Division, Karwar, in the State of Karnataka

    Upload Document File:  Public comments Km 345.500 to km 370.600.pdf ...

    morthadmin - 01/05/2023 - 11:25 - 0 comments

  2. Permission for laying 500 mm dia DI pipeline from km 8.267 to km 8.507, 350 mm dia from 8.507 to km 12.240 along NH-112 (old NH-35), two trenchless from km 9.250 to km 9.770 with 350 mm dia DI pipleine(HDD) & 900 mm dia MS pipe pushing along NH-112 (old NH-35) at km 12.240 (Joypul More criossing by HDD method (Length - 3.984 km) in connection with Habra-Gaighata surface water supply scheme under Barasat Division, PHE Dte. in the State of West Bengal

    Upload Document File:  Initiation of Public comments_km 8.267 to 12.pdf ...

    morthadmin - 12/30/2022 - 14:44 - 0 comments

  3. Proposal for permission of underground crossing of 2 nos.,11 KV, 3x70 Sq.mm XLPE insulated cable by HDD method at Km. 30+310 on NH-27 Lucknow-Kanpur section of at Sohramau & District Unnao in the State of Uttar Pradesh

    Upload Document File:  letter no 1795 dated 29 12 2022.pdf ...

    morthadmin - 12/30/2022 - 10:04 - 0 comments

  4. Four laning of Hisar to Dabwali Section of NH-10 from Km. 170.000 to 227.000 with paved shoulder in the State of Haryana on EPC Mode (Package-I) - NOC permisison for laying for underground crossing for 11KV at Km. 175.200 on NH-9 (old NH-10) at District Hisar in the State of Haryana by HDD Method

    Upload Document File:  02-4308 dated 28.12.2022.pdf ...

    morthadmin - 12/29/2022 - 10:34 - 0 comments

  5. Proposal for grant of permission for laying 8”/4” NB MS Gas Pipeline along/across NH-27 from Km. 895.800 to 897.00 (RHS) (Udaipur-Kota road), total 1.200 Km. length to develop City Gas Distribution Network in Chittorgarh City and its surrounding area under Udaipur & Chittorgarh GA by M/s. Adani Gas Ltd. (AGL)

    Upload Document File:  2813 dt 28.12.2022.pdf ...

    morthadmin - 12/29/2022 - 10:13 - 0 comments

  6. Proposal for grant of permission for design and execution of Dholpur Lift Irrigation cum Drinking Water project with intake point in Chambal River Dholpur District- Rajasthan on EPC basis (Single Responsibility Turn-Key Project) and its O&M of 8 years - Permission required for HDPE Pipeline 7 nos. crossing between Km. 0.650 to 12.120 under Uncha-Nagla-Dholpur section of NH-123 by EE Water Resources Division-II, Dholpur using HDD method

    Upload Document File:  2821 dt 28.12.2022.pdf ...

    morthadmin - 12/29/2022 - 10:07 - 0 comments

  7. Permission for laying of 90, 110 & 140mm dia HDPE water pipeline from Jat Mohalla to Janpad Karyalay (Km 59.550 to Km 60.372) and crossing by HDD method at Jat Muhalla Km 59.550 and Jal Sthambh chouraha 59.850 Km along NH-347BG (Indore-Deshgaon Highway) at Barwah for Water Supply Scheme under UIDSSMT

    Upload Document File:  48282-12272022181207public.pdf ...

    morthadmin - 12/28/2022 - 17:53 - 0 comments

  8. Proposal for grant of permission for laying underground PHED Pipeline dia 350mm DI K-7 along NH from Mahabar Fanta to towards PWD NH Barmer (Chouhatan Choraha) on NH-68 (Barmer-Gandhav Bridge) from Km. 155+500 to 155+873 (0.373 km length) & crossing at Km. 155+873 (All Open Trench) under service road in the State of Rajasthan by PHED

    Upload Document File:  2800 dt 26.12.2022-invi.pdf ...

    morthadmin - 12/27/2022 - 16:51 - 0 comments

  9. Permission for upgradation of existing 132 KV D/c Tower line into 220 KV M/c overhead tower line to be constructed by the M/s Torrent Power parallel to NH-147 between km 35/900 to km 40/900

    Upload Document File:  Uploading for Invitation of public comments Permission for upgradation of exisitng 132 KV DC tower line_0001.pdf ...

    morthadmin - 12/27/2022 - 11:46 - 0 comments

  10. Proposal seeking Permision for laying of 12" diameter steel Gas pipeline along/across NH-50, from Km 91.600 to Km 100.900 by open trench method & 2 No's crossing at Km. 91.600 and Km 100.00 by HDD method for a total length of 9.300 Km of NH-50 (Jalasangavi-Humnabad via IB circle ) in the State of Karnataka by AGP City gas private limited

    Upload Document File:  Km 91.6 to 100 (final).pdf ...

    morthadmin - 09/26/2022 - 12:49 - 0 comments

Pages