Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Report of the Sundar Committee on amendment of Motor Vehicles Act 1988

    ... Act 1988 Date:  Saturday, January 1, 2011 Issue by:  Motor Vehicle Acts Sequence no:  ...

    morthadmin - 04/30/2024 - 11:29 - 0 comments

  2. Two Laning with Paved shoulder of Chhapra-Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to Km 74+359 (Design Chainage), (Total Design length 73.079 Km) in the state of Bihar under NHDP- IV on EPC mode : - (A) Permission of laying steel and MDPE gas pipeline along with OFC for city Gas Distribution project along and across NH-102. (1) Along/across NH-102 from Nehru chowk, Chhapra (proposed chainage 01+300km) to Near Sarika Fuels-indian Oil pump Garkha, Saran (Proposed chainage 15+735 km) (B) Installation of isolation value chamber along road.

    ... PIU Chhapra letter no 1294 dated 02 03 2022(1).pdf Language English Document Date:  ...

    morthadmin - 03/03/2022 - 11:31 - 0 comments

  3. Proposal for crossing of 11KV Transmission through UG cable (01 No) at Khojna-Khirak between chainage km 13.940 to13.990 for providing the drinking water facilities to Golara, Bachali and Tilaitha group of Village under Jal Jivan Mission (Drinking water scheme)

    Upload Document File:  public-of-10350.pdf ...

    morthadmin - 12/06/2022 - 14:14 - 0 comments

  4. Proposal seeking ROW permission for laying Underground & Overhead 66KV S/C Tumbada-Kantela Line 630Sqmm (6+1) UGA Cable parallel from Km 409+820 to Km 412+250 & crossing at Km 405+360 of NH-8E in the section of Dwarka-Porbandar, near Village-Kuchadi, Taluka & District-Porbandar in the State of Gujarat

    Upload Document File:  9-Inv-029. IPC_D-1242 dt.16.04.204_GETCO-Jamnagar_Km 409+820_PD-RAj-243659.pdf ...

    morthadmin - 04/16/2024 - 17:07 - 0 comments

  5. Permission for overhead crossing of Jhansi–Kanpur highway on NH-27 between Km. 1565+800 to Km. 1565+900 of 132 KV D/C Gujare (Solar Plant)–Pukhrayan Transimission Line in the State of Uttar Pradesh by U.P. Power Transmission Corporation Ltd.

    Upload Document File:  2360 (1).pdf Language English Document Date:  ...

    morthadmin - 12/26/2023 - 11:31 - 0 comments

  6. ROW permission for laying 33KV cable (2run) for Balasore -1 feeder along the NH-16 from km. 188+200 to km. 193+300 Januganj to Kuruda bridge and crossing at km. 188+200 for providing uninterrupted power supply from Balasore grid to city PSS

    Upload Document File:  3343-3344-inv.pdf ...

    morthadmin - 10/15/2022 - 22:08 - 0 comments

  7. Proposal for issue NOC for laying of 1 Nos of 11KV 3C x 185 Sq mm XLPE cable underground line near split flyover of NH-27 near Porbandar to Rajkot section for catering 250 KV A new HT power supply to M/S Kathiyawad Industries, Purpose: Coal/Coke, Bauxite, Lime stone, Calcinated alumina situated at LHS 2+300 to 2+450 (LS No.134,138 & 176) near PBR-RJT Highway, NH-27 Porbandar under Udhyognagar sub division

    Upload Document File:  IPC_D-3108 date 06.10.2022_PGVCL_efile no. 171236.pdf ...

    morthadmin - 10/07/2022 - 10:13 - 0 comments

  8. Proposal for issue NOC for 1 Nos of 11KV 3C x 185 Sq mm XLPE cable underground line near split flyover of NH-51 near Porbandar-Dwarka section for catering 250 KV A new HT power supply to M/S Kathiyawad Industries, Purpose: Coal/Coke, Bauxite, Lime stone, Calcinated alumina situated at LHS 369+200 to 369+360 (LS No.134, 138 & 176) near Porbandar Dwarka Highway, NH-51 Porbandar under Udhyognagar sub division

    Upload Document File:  IPC_D-3107 date 06.10.2022_PGVCL_efile no. 171241.pdf ...

    morthadmin - 10/07/2022 - 10:11 - 0 comments

  9. Proposal for laying of water pipe line in Madurai-Ramanathapuram Section of NH-85 & 87 (old NH-49) along the road from Km 81+064 to Km 83+100 (LHS & RHS), Km 84+200 to Km 84+300 (LHS), Km 84+200 to Km 85+900 (RHS), Km 88+500 to Km 89+100 (RHS), Km 91+800 to Km 93+400 (RHS), Km 94+600 to Km 97+600 (RHS), Km 100+500 to Km 101+100 (RHS), Km 107+700 to Km 109+700 (RHS), Km 116+800 to Km 117+200 (RHS) & Km 118+600 to Km 120+484 (RHS) and crossing @ Km 84+285, Km 96+820 & Km 108+800 for a total length of 16.057 Kms (along the road length=15,956m open trench method & across length=101m HDD method)

    Upload Document File:  1-Inv-cmt-pub-237700.pdf Language English Document Date:  Monday, April 1, 2024 Invitation state:  Tamil Nadu whats news:  ... 98 Archival Date:  Saturday, June 1, 2024 ...

    morthadmin - 04/01/2024 - 11:53 - 0 comments

  10. Permission proposal for laying underground 16" dia Multi Product pipeline along the road at km 4/000 to 10/200(LHS) of NH-381A (Vellakovil-Muthur) in from BPCL Irgur Terminal Coimbatore to Devangonthi Terminal, Bangalore in Tiruppur District in the State of Tamil Nadu

    ... English Document Date:  Monday, January 1, 2024 Invitation state:  Tamil Nadu whats news:  ...

    morthadmin - 04/08/2024 - 12:07 - 0 comments

Pages