Sorry, you need to enable JavaScript to visit this website.

You are here

  • Permission for the install/crossing of underground crude oil supply M/s IOCL across NH 68 at km 396/980 NH 168 at km 25/560 NH 168 A 25/233 for the total project length as 108.96m, in the State of Gujarat
  • Proposal of permission for road crossing through underground cabling in the State of Madhya Pradesh
  • Request for approval for Proposed Construction of New Fuel Station (Retail Outlet), on a plot of land abutting on the Right hand side boundary of NH-31 towards increasing chainage in Km 1039.500 at Dag No. 936, Patta No. 210(N), Village-Barsahan, Mouza-Dakshin Bajali Sariha, Dist. Bajali in the State of Assam
  • Permission for laying of water Pipe line - laying Water pipe line by EE, TWAD Board, Project Division Thanjavur Laying of pipe along from Km 135/040 to Km 135/850 RHS (existing chainage) and across at Km 135/850 (Existing Chainage) and across at Km 139/477 (proposed chainage) (Cholapuram – Thanjavur section) NH-45C for a Total Length of 810m in the State of Tamilnadu
  • Permission for laying of water Pipe line by EE, TWAD Board, RWS Division, Karur Laying of Along the road from Km 312+000 to Km 314+000, Km 315+200 to Km 317+300, Km 329+200 to Km 331+600, Km 332+400 to Km 333+500, Km 333+800 to Km 334+600 & Km 337+400 to Km 339+800 and across the road at Km 309+400, Km 312+000, Km 315+200, Km 319+000, Km 327+000, Km 329+200, Km 332+400, Km 334+400 & Km 337+400 of Karur to Dindigul section of NH-7 in Aravakurichi & K. Paramathi Unions of Karur District Total Length 10800m in the State of Tamilnadu
  • Permission for laying of water Pipe line - laying Water pipe line by EE, TWAD Board, Project Division Thanjavur Laying of DI pipe along from Km 31/600 to Km 31/950 RHS and across at Km 31/600(Existing Road) & VUP at Km 33/305 (Nagapattinam – Thanjavur section) NH-67 Total Length 350m in the State of Tamilnadu
  • Permission for crossing of proposed 36 inch diameter (Carbon steel) Crude oil pipeline along with communication OFC cable from Mundra (Gujarat) to Panipat(Haryana) across National Expressway-5 (Delhi-Amritsar-Katra expressway) at Km. 53.750 near village Nuran Khera, Tehsil Gohana, District Sonepat by HDD method
  • Proposal for NOC permission of M/s of Torrent Gas Private Ltd. for laying of 8” Carbon steel natural gas pipeline along with NH-727H from km.0.00 to km.11.550 by HDD method in District –Barabanki in the State of Uttar Pradesh
  • Submission of proposal for permission to lay underground cable across km 22+800 of Saoner - Dhapewada road near Kalmeshwar underpass and also for overhead transmission line along the National Highway from km 22+240 to 22+800 i.e.0.56 km length of RHS of Saoner Dhapewada section of NH-547E
  • Proposal seeking permission for laying of HT UG cable of 2X400sqmm XLPE armed from Channagiri Town limit along NH-369(13) from Km. 483.910 to Km 484.920 on LHS for a length of 1.01 Kms & Road crossing with HDPE pipe 90mm & 200mm (with casing 400mm) dia at Km 483.910 of Chitradurga-Shivamogga section in the state of Karnataka by EE, Karnataka Housing Board, Co-ordinating unit,Shivamogga
  • Proposal for overhead crossing of 132KV S/C line with minimum vertical clearance of 13.083m above FRL on D/C tower of HVPNL (both towers outside the ROW) at Km. 147.620 on NH-1 (new NH-44) in the District of Karnal, Haryana
  • Proposal seeking ROW permission for 90 mm dia MDPE pipelines to set up a Piped Natural Gas distribution network in Jalalpore Taluka & Surrounding Area of Navsari District - Pipeline Laying parallel to National Highway - 48 (old Nh-8) (Bharuch Mumbai) from (1) NH Ch. 275.588 Km to 277.650 Km for length of 62 Mtr (LHS) & (2) NH Ch. 276.740 Km to 277.230 Km for Length of 490 Mtr (RHS) near Village Vesma in Taluka Jalalpore, District; Navsari in the State of Gujarat
  • Proposal seeking permission for laying proposed MS, water pipe line along & across NH-53 for providing basic utility service from Km 48+760 to Km 48+460 on left hand side and crossing are at NH-53 (1) Km 49+460 at Village-Kanav to Baleshwar District Surat in the State of Gujarat
  • Proposal seeking Permission for NH crossing through HDD method for underground R-LNG gas pipeline of dia 16" along with 3" conduit pipe at Km 17.638 of NH-648 (old NH-207) near Thindlu village between Sarjapur-dabasapete section in the State of Karnataka by M/s Indian Oil Corporation Ltd.
  • Permission for laying of underground slurry Pipeline, Water Pipeline and Optical Fiber Cable crossing NH-63 at 05 specified locations such as- at Km.154. 750 (Bagmundi Paneda), at Km.158. 920 (Bagmundi Paneda), at Km 168. 700 (Kilepal), at km 206.925 (Telimarenga) and at km 227.150 (Burundwada Semra) in Bastar District in the State of Chhattisgarh
  • Permission of accommodation of underground 132KV cable along NH-147 from km 32/900 to 34/00 (LHS) and from km 34/600 to km 34/800 (Kargil Petrol pump to sola bridge) in the State of Gujarat
  • Six laning of Kodungallur to Edappally section of NH-66 (Old NH-17) from De. Ch. 397+750(Ex. Km. 411.850) to De. Ch. 423+780 (Ex. Km. 343.330) in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana - Laying of Water supply pipelines along the NH-66 at Km. 419+850 for a length of 17.2m by Kerala Water Authority
  • Permission to lay OFC Cables of 2x40=80mm from T.Narasipura Karohatti Cross at Km 245+000 to Kunthur Km 263+00 on RHS & road crossing at Km 263+000 for a total length of 18.00Km along Kerala Border to Kollegala Section of NH-766 in the State of Karnataka
  • Permission to lay various diameter and HDPE drinking water supply pipeline along and across National Highway -275 on Bengaluru to Mysuru section and proposed Bidadi Bypass near Bidadi Town for providing water supply scheme to Bidadi Town & 9 enroute villages with Manchanabele Reservoir as source in Six laning of Bengaluru Nidaghatta Section of NH-275 from Km.18.000 to km.74.200 in the State of Karnataka
  • Permission to lay underground 66KV, 1000 Sq.mm UG cable from Kumbalagodu Gollahalli Road to Government school Road on LHS side from Km.21.600 to Km.21.485 for a length of 115m in Six laning of Bengaluru Nidaghatta Section of NH-275 from Km.18.000 to km.74.200 in the State of Karnataka
  • Permission/NOC for installation of mobile network site at Project Implementation Unit, PIU-Dwarka, location at Rao Tularam Marg, Near Arjun Path Bus Stand, Near 24SEVEN Mini Outlet, Shankar Vihar, New Delhi Lat Long 28.574908 77.146234 Chainage LHS (14.050) (Approx)
  • Proposal for NOC permission for crossing of underground electric cable by trenchless HDD method at 11 locations in Km.89.700 to Km.157.450 of NH-35 (Atarra to Chhiblaha road) in the State of Uttar Pradesh
  • Permission for the install/crossing of underground electricity supply cable of M/s Ultratech Cement Ltd across NH-41 between km 254.830 to 258/525 for the total Project Length as 60.00m, in the State of Gujarat
  • Conversion of Delhi-Gurgaon Section of NH-8 Access Controlled Eight/Six lane Highway from Rao Tula Ram Marg junction (Km. 14.300) to Km. 42.000 Gurgaon in Haryana on BOT basis: Reg. – NOC case for laying of Electrical Cable for Combined Independent Feeder (33KV U/G XLPE Cable Outer of HDPE Pipe 160mm) of M/s Brahma Center Development Pvt. Ltd., M/s Vatika One On One Pvt. Ltd. & M/s Essel Housing Projects Pvt. Ltd. From Km. 29.713 (LHS) to Km. 30.283 (LHS) (Length 570m), Km. 29.713 (RHS) to Km. 30.283 (RHS) (Length 570m) & One Crossing at Km. 30.283 (Length 76.11m) (Total Length 1216.11m) on NH- 8 (New NH- 48) (Delhi to Jaipur Road), in the State of Haryana
  • Proposal for NOC permission for crossing of 160 mm underground electric cable by trenchless HDD method at Km.135.400 & Km.135.450 of NH-731A (Karvi to Rajapur) in the State of Uttar Pradesh
  • The proposal regarding grant of permission to lay Narsinghpur sewerage project package 04KFW pipeline
  • Proposal for grant of permission for laying of Gas pipeline of M/s Indian Oil-Adani Gas Pvt. Ltd. (IOAGPL) from Km 98.680 to Km 99.680 (RHS) and 02 nos crossing (by HDD Method) at Km 98.680 and Km 99.680 of NH-01 (New NH-44) in villages Ganjbar, Tehsil & District Panipat in the state of Haryana
  • Proposal for permission for laying of 11 KV underground electric cable by Dakshinan Vidyut Vitran Nigam Limited(DVVNL), Odhpura, Hathras by crossing the NH-509 at Ch.178.520, Ch.184.279, Ch.188.361, Ch.180.930, Ch.209.674, with 11kv XLPE in District Hathras in the State of Uttar Pradesh
  • Permission for laying of 150mm diameter Natural Gas Pipeline (CS Pipe) along NH-71 (New NH-352) from km.393.265 (LHS) to km. 397.165 (LHS) with one crossing at km. 397.165 in District-Jhajjar in the State of Haryana by HDD method
  • Proposal for grant of permission for UG crossing of Electric Cable on NH-48 (old NH-27) at Km. 278+804 (from LHS to RHS) for proposed industries properties in Khasra No. 3219, 3221 & 3222 of Village-Navania, Tehsil-Vallabhnagar, District-Udaipur on Chittorgarh-Udaipur road section in the State of Rajasthan by AVVNL
  • Proposal for grant of permission for laying Overhead crossing of electric cable along Kota Bypass section of NH-27 from Km. 1063.700 to 1064.800 (LHS) (Overhead with 20 Nos. Polls size 1.2m x 1.2m) in a length of 1.10 Km. by UIT Kota in the State of Rajasthan
  • Proposal for grant of permission/NOC for NH underground cable crossing of Khajuwala-Poogal-Bap road section of NH-911 at Ch. 26/29.2 of Village-Nokh, District-Jaisalmer in the State of Rajasthan by M/s Rising Sun Energy Pvt. Ltd., New Delhi
  • Proposal for grant of permission for laying 12” NB MS Steel Gas Pipeline along NH-76 (New NH-27) from Km. 118+00 to 113+830.800 (LHS) (Debari to Pratapnagar), total 4.17 Km. length to develop City Gas Distribution Network in Udaipur and its surrounding area under Udaipur GA by M/s. Adani Total Gas Ltd. (ATGL)
  • Permission for laying of 10" dia. steel oil pipeline across NH-48 at Km. 21+700 near Village Bareja. Tal-Daskroi, District-Ahmedabad on Ahmedabad-Vadodara section of NH-48 in the State of Gujarat
  • Permission seeking ROW permission for laying Drinking Water Pipeline across NE-1 at Km 76+300 (with casing pipe of 250mm dia) and Km 77+880 (with casing pipe of 400mm dia) at Taluka-Savli, District-Vadodara on Ahmedabad-Vadodara section of NE-1 in the State of Gujarat
  • Four laning of Chakur-Loha section of NH-361 from km 114.600 to km 187.800 (Design length 73.345) under Bharatmala Pariyojana in the State of Maharashtra- Proposal for permission of carry out 11KV electrical line work Electrical Works for laying of Electrical 11 KV line along NH jurisdiction of NH-361 from km 158.500 to km 162.100 for section of total length 3.600 kms in NHAI Nanded
  • Permission for accommodation of 90 mm PE Gas Pipeline across on NH-64 Dandoli Kherwassa section at km 336/206 near Saniya Kande Village in the State of Gujarat
  • Permission for Erection of 230 KV SC Overhead Transmission line Crossing at Km. 229+700 Proposal submitted by M/s. JSW Future Energy Ltd., Mumbai
  • Permission for Erection of 22 KV Overhead Transmission line from Km 13/970 to Km 17/900 RHS along the road of Dindigul – Theni section of NH-45E
  • Proposal for grant of permission for laying Electric Cable within NH ROW from Ch. 57+600 to 104+724 on NH-48 for implementation of Delhi-Gurugram-SNB Regional Rapid Transit System (RRTS) Corridor by M/s NCRTC in the State of Haryana
  • Proposal for seeking ROW permission for laying proposed 8” Steel Gas Pipeline & across/along NH-51 (Porbandar-Veraval) to develop City Gas distribution in network in Porbandar and its surrounding area. (Across NH-51 at Km 390+963, Along NH-51 Flyover Bridge from Km 390+610 to Km 390+963 (LHS) Steel, Along NH-51 Flyover Bridge from Km 390+963 to Km 390+620 (RHS) Steel)
  • Four laning with Paved Shoulder Porbandar-Dwarka section of NH8E (Extn.) from Km 356+766 (Design chainage Km 379+100) to Km 473+000 (Design chainage Km 496+848) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) Mode.Proposal seeking ROW permission crossing 900 mm dia. pipeline on NH-51 Km 356+766(367+680) in old Porbandar bypass in State of Gujarat
  • Proposal for the permission for laying of over head 11KV line at NH-146 between KM stone no. 79-80 (CH. 79.145, RHS) for M/s Hotel Bhesla Resorts at village Dabar, District Vidisha in the State of Madhya Pradesh
  • Proposal for requesting permission for laying drinking water supply M.S. pipe line of dia. 1400 mm along NH-548 D at Km. 7.700 to Km. 9.580 RHS i.e. Induri Phata to Bhandara Dongar at Village- Induri, Tal.- Maval, District Pune and crossing at Km. 7.700 RHS
  • Rehabilitation & Up-gradation to four laning of Singara to Binjabahal section from Ch.Km.311.000 to Km.414.000 (Design Ch.Km.310.806 to Km.414.982) of NH-6 in the State of Odisha under NHDP-IV on Hybrid Annuity Mode