Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
961 Rajasthan Permission for laying of 125 mm MDPE Natural gas pipeline from Ch. 7.00 to (Janana Hospital T-Point) to 8.750 (LHS) and Ch. 8.750 to 9.270 (RHS) Vatika Society along NH-89 (New NH-58) (old Ajmer-Puskar bypass left out road) & crossing at Ch. km 8.750 in the State of Rajasthan (305.50 Kb application-pdf)
04-09-2024
962 Rajasthan Permission for laying of 125 mm MDPE Natural gas pipeline from Ch. Km. 3.620 to km. 5.500 (LHS) and km. 5.500 to km 6.020 (RHS) New Medical Collage to Ch. 6.020 (RHS) DWPS Choraha along NH-89 (New NH-58) Ajmer-Puskar bypass and crossing at Ch. km 5.500 in the State of Rajasthan (311.68 Kb application-pdf)
04-09-2024
963 Madhya Pradesh Proposal for permission of underground road crossing of 33KV line by trenchless (HDD) method at Ch 153.452 of Sindoor-Bareli section of NH-45 in Village-Bhopatpur, Tehsil-Deori, District-Raisen in the State of Madhya Pradesh (64.93 Kb application-pdf)
03-09-2024
964 Madhya Pradesh Proposal for seeking water pipeline crossing permission at Ch. 600+160 and laying from Km. 600+160 to Km. 600+378 LHS on NH-3, Bypass A.B.Road, under right of way for laying water pipeline at Village-Khajrana, Indore in the State of Madhya Pradesh (1.41 Mb application-pdf)
03-09-2024
965 Uttar Pradesh Providing NOC for the permission of laying U/G water pipeline (DI/MS pipe) by HDD method along NH-35 Prayagraj-Banda road, from Ch. 201.555 to Ch.193.956, LHS (Length-7599.0m) and from Ch.190.174 to Ch.175.399, LHS (length-14775.0m) and five Nos. Crossings at Ch.175.399, Ch.181.795, Ch. 185.980, Ch.195.646 & Ch. 201.516 (Length 20m+24m+44m+20m+20m=128.0m), total length-22502.0m at Gram Panchayat-Janawa, Lakhanpur, Kapari, Bara khas and Pandar, District-Prayagraj in the State of Uttar Pradesh (558.53 Kb application-pdf)
03-09-2024
966 Rajasthan Permission for laying Electric Cable on NH-89 across the road at Ms-107.150 (Bhutati-Bikaner Road) total length is 0.030 Km, ROW applied in the State of Rajasthan (284.87 Kb application-pdf)
03-09-2024
967 Jharkhand NOC regarding laying of water pipeline in the area of Saraiyahat and Ramgarh under Bahugramin Jalpurti Yojna (1.19 Mb application-pdf)
02-09-2024
968 Tamil Nadu Request for permission to lay underground Optical Fiber Cable (OFC) on NH 544H Thoppur Bhavani Section) Along the road from Km 12+400 to Km 12+900 (LHS), Km 25+950 to Km 26+200 (RHS) and crossing at Km 12+400, Km 12+900, Km. 25+950 and Km. 26+200 in the State of Tamil Nadu (510.78 Kb application-pdf)
02-09-2024
969 Uttar Pradesh Providing NOC for laying 100 mm MDPE gas pipeline on NH-29E (New NH-24) from km. 89.000 to km. 94.800 at District-Gorakhpur in the State of Uttar Pradesh (908.38 Kb application-pdf)
02-09-2024
970 Uttar Pradesh Providing NOC for laying 100 mm (4") Dia Cs pipeline on NH-29E at km. 90.871 to km. 91.441 in District-Gorakhpur in the State of Uttar Pradesh (946.91 Kb application-pdf)
02-09-2024

Pages