Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
861 Karnataka Issue of NH permission for laying of 16” OD Natural Gas Pipeline and OFC Conduit (40mm OD) along Bengaluru-Hosur Section of NH-44 (Old NH-7) from Km.31.345 to Km. 31.895 on LHS for a total length of 550m by HDD Method in the State of Karnataka by M/s IOCL, Bengaluru (2.22 Mb application-pdf)
08-04-2025
862 Maharashtra Proposal for requesting permission for laying drinking water supply pipeline at Km. 147/870 to Km. 143/650 RHS at Village-Ghulewadi, Tal.-Sangamner along NH-60 (2.36 Mb application-pdf)
08-04-2025
863 Andhra Pradesh Permission for NOC for laying pipeline Crossing at Km. 727+800 at Sanivada Village, Kurmanpalem Mandal, Visakhapatnam District in the section of Anandpuram-Visakhapatnam-Ankapali (city limits) on NH-16 in the State of Andhra Pradesh (1.24 Mb application-pdf)
08-04-2025
864 Andhra Pradesh Permission for NOC for laying pipeline Crossing at Km. 727+800 at Sanivada Village, Kurmanpalem Mandal, Visakhapatnam District in the section of Anandpuram-Visakhapatnam-Ankapali (city limits) on NH-16 in the State of Andhra Pradesh (5.99 Mb application-pdf)
08-04-2025
865 Uttar Pradesh Proposal for the permission of laying U/G optical fiber cable (OFC) by HDD method along/across NH-30, Lucknow- Reabareli Road from Ch.15.100 to Ch. 15.747, RHS (Total length-647 m) at Village-Sabhakhera, Block-Lucknow Sadar, District-Lucknow in the State of Uttar Pradesh (470.58 Kb application-pdf)
08-04-2025
866 West Bengal Proposal of PHE Dte, Govt of West Bengal regarding ROW permission for laying water pipeline along NH-35(New NH-112) from km 8.693 to km 9.860 (LHS) for Nevadui-Duttapukur Zone-II Water Supply Scheme under Barasat Division PHE dte, Govt. of West Bengal (108.07 Kb application-pdf)
08-04-2025
867 Gujarat Proposal for approval of underground crossing of 33 KV underground cable transmission line from existing 66 KV Kagvadar S/s to proposed to 33 KV Kagvadar Transmission Line with 800 sq. mm (3+1) and (3+1) underground cable crossing at Ch. 142+170 Km NH-51 in the State of Gujarat (between Km stone 142-143 Una-Mahuva Road) at Village-Kagvadar, Taluka-Jafrabad, District-Amreli (115.36 Kb application-pdf)
07-04-2025
868 Uttar Pradesh Proposal for the permission of laying U/G & O/H 33Kv, 3x300Sqmm XLPE cable through HDD & Overhead method along NH-731, Sultanpur - Lucknow Road from CH.213.988 to CH.214.788 LHS (Length= 800.00M, U/G Method) and CH.214.788 to CH.215.214 RHS (Length=426.00M, O/H method) total length=1226.00M at Village-Khurdahi Bazar, Block-Lucknow Sadar, District-Lucknow, in the State of Uttar Pradesh (327.68 Kb application-pdf)
07-04-2025
869 Gujarat Submission of proposal for approval of overhead crossing of 66 KV S/C Visavada- Miyani line on Panther tower with ACSR Panther Conductor crossing near Chainage 430+810 to NH-51 Dwarka-Porbandar NH near Village Miyani, Taluka & District-Porbandar (355.43 Kb application-pdf)
07-04-2025
870 Gujarat Submission of proposal to issue NOC for crossing of proposed internat underground cable of wind farm project on 66 KV DC tower structure from wind farm to khakharda PSS on NH-151A Dwarka (Kuranga)-Khambhaliya, Devariya between Ch 13 to 14 at Village-Bhatiya, Taluka-Jamkalyanpur, District-Devbhumi Dwarka (364.63 Kb application-pdf)
07-04-2025

Pages