Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
6421 Andhra Pradesh Proposal of M/s. IOCL for laying 16” Paradip-Hyderabad Petroleum product pipeline (PHPL) along with 89mm dia duct for laying OFC across NH 26 at Km.531/780 in Visakhapatnam District in the State of Andhra Pradesh (412.04 Kb application-pdf)
29-01-2020
6422 Odisha Proposal for access permission for approach roads at km 163/406 to 163/441 (RHS) on NH-26 to the proposed Retail Outlet of Miss Nirupama Naik. (Applicant of BPCL) at Mouza- phatkamal, Tahasil- Kesinga, Dist- Kalahandi in the state of Odisha (354.48 Kb application-pdf)
29-01-2020
6423 Odisha Proposal for access permission for approach roads at km 240/285 to 240/320 (RHS) on NH-26 to the proposed Retail Outlet of Smt. Sharada Agrawal (Applicant of HPCL) at Mouza- Bangomunda , Tahasil- Koksara, Dist- Kalahandi in the state of Odisha (394.89 Kb application-pdf)
29-01-2020
6424 Andhra Pradesh proposals involving deviations from the prescribed guidelines/norms for grant of permission to lay 4 inch Natural Gas Pipeline (1.43 Mb application-pdf)
28-01-2020
6425 Karnataka Permission for laying of Optical Fiber cable (OFC) by M/s. Reliance Jio Infocomm Ltd. From Km 133.00 to 152.00 from Shirur to Bhagalkot of NH-367 Bhanapura-Gaddankeri Section for a total length of 19 Kms and 2 Nos crossings at Km 133.00 & Km 152.00 by open trench method (2.82 Mb application-pdf)
28-01-2020
6426 Rajasthan Permission for National Highway crossing for water pipe lines between 79.4 to 144.5(7 different locations 14 nos. pipelines crossing) underJaisalmer Barmer section of National Highway 68 in the state of Rajasthan (686.95 Kb application-pdf)
27-01-2020
6427 Rajasthan Satellite Fields Pipeline Project - Request for permission to cross pipe line at Ch.27.882 km. of NH-25(112) (Barmer to Baytu) in the state of Rajasthan (683.28 Kb application-pdf)
27-01-2020
6428 Rajasthan Regarding Permission laying the 1RX3 core x 300 sqmm.33 Kv HT cable along the NH-8 for, 33/11 KV sub-station at Shiv Vihar Yojna, for electrification of Prithviraj Nagar Area zone-19, JDA, Jaipur in the state of Rajasthan (682.16 Kb application-pdf)
27-01-2020
6429 Rajasthan Permission for laying underground Optical Fiber Cable on Jodhpur Barmer =Section of NH-112 (Bagundi to Barmer Package-II) from Ch.MS.0.000 to Ch.MS. 1.630=1.630 Kms & Ch.MS.6.800 to 19.000 = 13.200 Kms, Total section of ROW applied 14.830 Kms. in the state of Rajasthan (721.29 Kb application-pdf)
27-01-2020
6430 Maharashtra Proposal for grant of NOC for laying I crossing of 33 KV overhead line across NH- 361 at Km.14.815 from Tuljapur City in Internal Lane from Lohara PSS of Mls. Siemens Gamesa Renewable Private Limited Cehnnai Line from wind farm (1.32 Mb application-pdf)
27-01-2020

Pages