Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
581 West Bengal Laying of 250 mm (OD) dis DI (K9) Raising Main Pipeline along the NH-12 from Ch. Km. 79.100 to Ch. 79.780 under integrated Surface Water Based PWSS for Ranaghat-I & Ranaghat-II Block under Nadia Arsenic Division-I, P.H.E. Directorate, District-Nadia in the State of West Bengal (483.11 Kb application-pdf)
19-06-2025
582 Rajasthan Permission for Laying of pipeline underground crossing on Jaisalmer-Phalodi section of NH-11 (750mmOD) at Km 262+220 village Ekka, Tehsil Phalodi, District-Phalodi in the State of Rajasthan (749.58 Kb application-pdf)
19-06-2025
583 West Bengal ROW Permission for laying 8" Dia(203.2mm) CS Pipeline and 125 mm dia MDPE pipeline along NH-17(Old NH-31) from km 717.925(Birpara Chowpathi) km 742.500(Falakata Mill More) with aprrox. Length of 24.200 km (excluding the length of ROB, 3 nos. river crossings 375 mts), in the District of Alipurduar, West Bengal (108.39 Kb application-pdf)
18-06-2025
584 Uttar Pradesh Request for grant of permission to lay 12" steel pipeline on NH-34 from milestone Km 120.250 to milestone Km 127.600 and Crossing ay Km 127.600 (Crossing Length 36.60 mtrs) on NH-34 in District-Mahoba, through HDD/ open cut method. Total length is 7.3866 km. in District-Mahoba, Uttar Pradesh (2.68 Mb application-pdf)
18-06-2025
585 Uttar Pradesh Request for grant of right of way permission to lay carbon steel pipeline along NH-19 from Km. 552.000 to Km. 559.400 (LHS) (dia. 200 mm) length 7.40 Km & crossing of carbon steel pipeline at Km. 550.980 (dia.100 mm), Length 60 m in District-Fatehpur, Uttar Pradesh (3.89 Mb application-pdf)
18-06-2025
586 Uttar Pradesh Request for 8rant of permission for laying/ crossing of 12" steel pipeline on NH-34 from Km 58.250 to Km 62.250 (RHS) in District-Kanpur & from Km 67.100 to Km 91.250 (RHS) in District-Hamirpur & Crossing at Km 58,250 (Crossing length-40.50m) through HDD/Open- cut Method. Total length 28.1905 Km in District-Kanpur & Hamirpur, Uttar Pradesh (9.41 Mb application-pdf)
18-06-2025
587 Maharashtra Submisson of proposal for permission of crossing 33KV electrical cable line on Betui-Nagpur Road NH-47, Chainage 56.200 LHS Kamath, Multai, Betul (M.P) (790.91 Kb application-pdf)
18-06-2025
588 Telangana Proposal for crossing of 765KV from Bidar PS–Maheswaram D.C Transmission Line on NH-44 at Km.65+145 near Kethireddypally village, Rangareddyguda Mandal in Mahabubnagar District. from Solar Energy zone at Bidar by PBTL under Transmission Scheme for Solar Energy Zone in Bidar (2500MW) by M/s Powergrid Bidar Transmission Ltd. (156.54 Kb application-pdf)
18-06-2025
589 Jharkhand Proposal for permission for laying water supply pipe line along & across NH-333 and NH-114A for ugmentation and strengthening of Deoghar Urban water supply scheme under Deoghar Municipal Corporation in the State of Jharkhand (422.51 Kb application-pdf)
17-06-2025
590 Madhya Pradesh Regarding approval for laying of Water Pipeline KKG9/ 150DD line along NH-47 Betul-Harda-Indore Highway, Chainage No. 81.200 to 83.060 RHS-1860 meter 84.550 to 86.850 RHS-2300 meter, Total Length 4160 M. under Amrit 2.0 scheme of Nagar Parishad Chicholi (12.25 Mb application-pdf)
17-06-2025

Pages