Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4921 Haryana Proposed layout plan for granting the permission to lay 200 mm Diamter natural gas pipeline (CS Pipe) of Haryana City Gas Distribution Ltd along NH-8 (New NH-48) from Km. 33.370 (RHS) to Km, 42,100 (RHS) [Length - 8730M] in District - Gurgaon and State - Haryana (1.01 Mb application-pdf)
21-12-2020
4922 Haryana Regarding grant of necessary permission (806.54 Kb application-pdf)
21-12-2020
4923 Maharashtra Proposal for grant of permission for laying 400 mm dia DI K-9 Class Raw Water Rising main from T-Point to Paithan area Boundry and Highway crossing at T-Point ( Aurangabad-Paithan NH-752 E from DPR Design Ch. 45+550 to Ch. 46+000) (1.33 Mb application-pdf)
19-12-2020
4924 Madhya Pradesh Proposal for NOC for access permission to the proposed fuel station on NH-347 in km. 65, (Ch. 64.426, LHS) Village-Pathrashivlal, Tehsil-Mohkhed & District-Chhindwara in the State of Madhya Pradesh (13.80 Mb application-pdf)
18-12-2020
4925 Maharashtra Proposal for Permission for laying of Underground Optical Fiber Cable (OFC) Bhandara - Khat - Ghotitok road NH 247 from Km, 176/600 (Satona T point) to Km, 168/600 ( Ram Ashwat Chowk) in Bhandara Muncipal Limit in the state of Maharashtra (735.76 Kb application-pdf)
18-12-2020
4926 Maharashtra Proposal for Permission to carry out Horizontal Direct Drilling (HDD) and open trenching work for laying of OFC Telecom Ducts/Cable (02Nos) along Jurisdiction on Pune Solapur Road NH 65 from 15 Number Canal Hadapsar to Gramsevak Prashikshan Kendra (RHS) Ch 9/90 to 12/200 1 crossing at Ch 12/170 to 0/03 Total Length 2.30 Km (781.38 Kb application-pdf)
18-12-2020
4927 Maharashtra Proposal for construction of part of 220 kv D/C Monopole Transmission Line from 35+900 (Wadkhal) to 53+500 (Nagothane) RHS along NHAI utility corridor (958.57 Kb application-pdf)
18-12-2020
4928 Maharashtra NHAI-PIU-NSK- Widening of existing 2 lane carriage way to 4/6 lane carriageway configuration for Dhule - Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra - M/s. Telesonic Network Ltd.’s (Airtel) proposal for laying OFC in stretches from Km. 303.800 to Km. 310.400 (Length 6.6 Km) on NH-3 (1.09 Mb application-pdf)
17-12-2020
4929 Maharashtra NHAI-PIU-NSK- Widening of existing 2 lane carriageway to 4 lane carriageway configuration for Vadape - Gonde (Km 440.00 to Km 539.500) & Pimpalgaon-NashikGonde (Km. 380.000 to Km. 440.000} sections of NH-3 in the State of Maharashtra - Maharashtra Information Technology Corporation Ltd. (DIT Mantralaya) proposal for laying Telecom OFC in stretches from Km.435.800 to Km. 458.500 (Length 25.30 Km) on NH-3 (1.13 Mb application-pdf)
17-12-2020
4930 Uttar Pradesh Proposal for NOC for overhead crossing of 400 KV D/C (Twin) Rosa - Badaun transmission line on NH-730C between Km. 49.000 to Km. 49.100 near village - Mirjapur, District - Sadar Shahjahanpur in the State of Uttar Pradesh (4.08 Mb application-pdf)
17-12-2020

Pages