Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4081 Haryana Permission for laying of 33KV Electrical Line crossing at Chaiange 21+400 on NH-248BB (Dwarka Expressway) in the State of Haryana (1.16 Mb application-pdf)
11-03-2022
4082 Maharashtra Four laning of Amravati - Chikhali section from 166.000 to km 360.000 section of NH-6 in the State of Maharashtra to be executed on DBFOT Pattern under NHDP Phase-IV -Proposal for laying Overhand Optical Fiber Cable from km 277.100 (Shegaon T Point) to km 290.750 (Khamgaon Bypass) & crossing Chainage (i) km 277.100 (ii) km 284.950 (iii) km 288.000 & Khamgaon City (i) Ch. 001.300 Total length = 13.65 km by M/s Maharashtra Information Technology Corporation Ltd (1.46 Mb application-pdf)
11-03-2022
4083 Maharashtra Upgradation of four laning Khamgaon of Old NH-6 from km 296.000 to 304.000 (Design length 7.300km) on EPC Mode in the State of Maharashtra - Permission of installation of OFC cable on existing MSEDCL Pole and or erecting new poles along NH-53 of total length = 8.00 km. by M/s Maharashtra Information Technology Corporation Ltd (1) Temburna Fata (293.000- to Balapur Phata (296.000) for 3 kms (2) Khamgaon City Road from km 0.100 to km 5.200 and 3 nos of crossings at (i) km 0.800 (ii) km 1.200 (iii) 1.630 (1.52 Mb application-pdf)
11-03-2022
4084 Maharashtra Proposal for installation of Overhead Optical Fiber Cable on existing MSEDCL Pole and / or erecting new poles along NH-753C from km 31.800 to 62.900 total length of ROW for 31.1km (1.32 Mb application-pdf)
11-03-2022
4085 Odisha Rehabilitation & Up gradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the State of Odisha under NHDP-IIl on EPC Mode Package-II- ROW permission of 1.5m wide corridor for laying of iron ore slurry pipeline and return water pipe line along with 02 nos. of OFC in NH- 55 utility corridor from Km.85.800 to Km.89.600 (TSL ROB to Angul bypass) to facilitate the iron ore slurry pipeline project to TSL (6.24 Mb application-pdf)
10-03-2022
4086 Karnataka Proposal seeking permission for laying of OFC cable along NH-169 from Maluru Km 43+400 to Theerthahalli Km 58+400 on LHS for a total length of 15.00 Kms through HDD method by Ms. Telesonic Networks Ltd. (8.97 Mb application-pdf)
10-03-2022
4087 Karnataka Proposal seeking permission for laying of OFC cable along NH 548B from Honwad Km 30.000 to Telsang Cross Km 34.000 on LHS for a total length of 4.00 Kms and 2 nos. crossings through HDD method by M/s. Jio Digital Fibre Pvt. Ltd. (3.34 Mb application-pdf)
10-03-2022
4088 Uttar Pradesh Permission for laying of optical fibre cable on NH-19 (towards Kanpur Ch. 394.260 to Ch.396.760 & Ch.398.560 to Ch.403.320) Total section length ROW applied for 7.26 km. and one crossing at ch.398.560 in the State of Uttar Pradesh (5.20 Mb application-pdf)
10-03-2022
4089 Uttar Pradesh Permission for laying of optical fibre cable on NH-19 from Ch.423+400 to Ch.425+200 Kanpur (Section 1.820 Km.) & Ch.428+760 to Ch.437+800 towards Etawah side (Section 9.120 Km.) total and 02 nos. of crossing at Ch.423.760 Km. and Ch.432.240 Km. across NH-19 total 2 section length ROW applied for 10.940 Km. the State of Uttar Pradesh (5.12 Mb application-pdf)
10-03-2022
4090 Maharashtra NHAI-PIU-Kolhapur - Proposed Four laning of Ratnagiri - Kolhapur section of NH - 166 from Km 0/000 to Km 137/285 in Ratnagiri and Kolhapur Districts - Proposal for grant of permission for laying of OFC cable along NH-166 from Kerli Phata to Rajputwadi Phata area for the total length of 1.300 Km in the state of Maharashtra (882.33 Kb application-pdf)
10-03-2022

Pages