Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3121 Maharashtra Proposal for laying underground Telecom Cable at NH-6 RHS Jalgaon Road Chainage km 518/300 to LHS km 520/200 total length 1.9 km (544.65 Kb application-pdf)
20-05-2022
3122 Telangana NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 5.65 Km from Km.?05+563 ta Km,.?1?+02? (RHS) along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.206+463, Km. 209+913, and Km, 212+022 on Warangal to Khammam section of NH-563 in the State of Telangana (3.91 Mb application-pdf)
20-05-2022
3123 Telangana NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 10.53 Km from Km.146+050 to Km.146+800 (RHS), Km. 167+400 to Km.175+000 (RHS), and Km. 175+000 to Km. 177+000 (LHS), along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.167+400, Km. 167+650, Km. 174+450, Km. 171+460, Km. 174+850, and Km. 175+000 on Warangal to Khammam section of NH-563 in the State of Telangana (8.29 Mb application-pdf)
20-05-2022
3124 Rajasthan ROW permission for laying optical fiber cable at location Gulab Baag to ACB office Karauli (277.09 Kb application-pdf)
18-05-2022
3125 Uttar Pradesh Permission for overhead crossing of 132 kV Bhadrekhi Orai (400 M/s BSUL Kalpi Solar project line @ 400 kV Sub-Station Bhadrekhi Orai between Ch.1524+360 on NH-27 near villagr-Aata, Distt- Jalaun (8.31 Mb application-pdf)
18-05-2022
3126 Andhra Pradesh Operation and Maintenance of 4 lane divided Carriageway facility of Tada - Nellore (Km.52.8 to Km.163.6) section of NH-5 constructed on BOT basis in Andhra Pradesh - Permission for laying of Optical Fibre Cable (OFC) of M/s. APSFL across NH-16 at 29 No of locations (8.67 Mb application-pdf)
18-05-2022
3127 Andhra Pradesh Six-laning of Chilakaluripet - Nellore section of NH-16 from Km.1182.802 to Km1366.547 (length 183.620) in the state of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern - Permission of laying of OFC across NH-16 at 35 nos of locations (14.25 Mb application-pdf)
18-05-2022
3128 Maharashtra NHAI-PIU-NSK- Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 from Km 380.000 to 440.000 in the State of Maharashtra - Maharashtra Natural Gas Limited’s (MNGL) Proposal for laying Gas Pipeline from Km. 411.382 to Km. 409.200 (LHS) and Km. 409.200 to Km. 406.100 (RHS), Total length- 5.282 Km & 2 Crossing at Km. 409.200 & Km. 406.100 on NH-3 (549.16 Kb application-pdf)
18-05-2022
3129 Uttar Pradesh Proposal for NOC permission for underground water supply pipeline pipeline laying & crossing by Trenchless HDD method in Km.290.00 to km.302.500 in both side of National Highway of NH-75E (New NH-39) (Renukoot to Jharkhand Border section) in District -Sonebhadra in the state of Uttar Pradesh (3.24 Mb application-pdf)
18-05-2022
3130 Maharashtra Construction of four laning of Nagpur-Katol section of NH-353J from km. 13.000 to km. 62.900 (Design Chainage) in the State of Maharashtra under NH(O) on EPC Mode-Permission of laying of 18" dia Natural Gas Pipeline alongwith 40mm OFC cross National Highways 353J at km 19+139.60, village Pipla Taluka Kalmeshwar, Dist. Nagpur (515.25 Kb application-pdf)
17-05-2022

Pages