Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2851 Maharashtra Request for granting permission of lay off 18" dia Natural Gas Pipeline along with 40mm OFC across National Highways 547E at km 11+555.6 near village Dhapewada(B), Tal. Kalmeshwar, District - Nagpur in the State of Maharashtra (242.05 Kb application-pdf)
25-08-2022
2852 Tamil Nadu Permission for laying of water Pipe line under PIU, Thanjavur - laying Water pipe line by EE, TWAD Board, RWS Division Thanjavur Laying of DI pipe along from Km 121+00 to Km 121+610 (LHS), 113+570 to 114+280 (LHS), from Km 114+280 to 114+600 (RHS) from Km 119+800 to Km 120+057 (RHS) and across at Km 113+570, 114+280 & 120+057 (Cholopuram - Thanjavur section) NH-45C in the State of Tamilnadu (144.67 Kb application-pdf)
25-08-2022
2853 Bihar Proposal for National Highways-122 (Muzaffarpur-Begusarai) crossing between Zero Mile to Teghra for 220 KV D/C GSS Begusarai to IOCL Barauni Refinery Transmission Line (327.14 Kb application-pdf)
25-08-2022
2854 Tamil Nadu Permission for laying of water Pipe line under PIU, Thanjavur - laying Water pipe line by EE, TWAD Board, RWS Division Thanjavur Laying of pipe along from Km 113+100 to Km 112+250-LHS, 117+600 to Km 116+438-LHS, from Km 116+438 to Km 115+250-LHS & from Km 115+260 to Km 114+500 and across at Km 117.600, 117+550&115+228 (Sethiyathope -Cholapuram - Thanjavur section) NH-45C Total Length 3960m in the State of Tamilnadu (141.53 Kb application-pdf)
25-08-2022
2855 Gujarat Permission for the install/laying of 66KV S/C Underground Electricity line of Gujarat Energy Transmission Coroporation Limited (M/s GETCO) along NH-47 between km 45/097 to km 46/214, for the Total Project Length as 1.270 km, in the State of Gujarat (485.98 Kb application-pdf)
24-08-2022
2856 Telangana Proposal for laying of Natural Gas Pipeline of 8 inch dia Steel pipeline along with 125mm dia MDPE Pipeline for a total length of 1.86Km from Km.454+400 (Design Chainage 449+400) to Km. 456+200 (Design Chainage 451+200) (RHS) by Open trench Methodology, and Highway crossings by HDD methodology at Km.456+100 on Nagpur to Hyderabad section of NH-44 in the State of Telangana (4.62 Mb application-pdf)
23-08-2022
2857 Haryana Proposal for grant of permission for laying of Sewerage pipeline in 400mm diameter from Km. 264.900 to Km. 265.480 (RHS), 250mm diameter from Km. 265.895 to Km. 265.930 (RHS), 400mm diameter from Km. 265.860 to Km. 265.930 (LHS) and 800mm diameter Road crossing at Km. 265.930 through HDD on old NH-1 (new NH-44) in the State of Punjab (421.90 Kb application-pdf)
23-08-2022
2858 Odisha Rehabilitation and up-gradation of existing 2 lane to 4-lane standards to Koida(Km.206.200) to Rajamunda (km 259.453) section of NH-215 (New-520), i.e. Package-II in the State of Odisha under NHDP Phase III on EPC Mode-Laying of Clear Water Rising Main Pipeline along & across the NH-520 at Lahunipada Block by M/s RWS&S, Rourkela (1.08 Mb application-pdf)
22-08-2022
2859 Odisha Rehabilitation and up-gradation to 4 laning from km 287.200 i.e. Rajamunda to km.387.185 i.e. Barkote Section of NH-23 (New NH-143)on EPC Mode- Laying of Clear Water Rising Main Pipeline along & across NH-143 at Lahunipada & Gurundia Block by RWS&S, Rourkela (1.60 Mb application-pdf)
22-08-2022
2860 Kerala NHAI-RO Kerala-Accomodation of Public and Industrial Utility Service along National Highways-Laying/Crossing of 110mm UG Cable through HDD by KSEB from Ramanattukara Town to Vaidyarangadi(Km.15+656-Km.17+443)(LHS) of NH-966 (487.88 Kb application-pdf)
22-08-2022

Pages