Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2061 Madhya Pradesh Complete water life mission of pipeline and road crossing under Helon Rural Group Water Supply Scheme in Mandla District-Regarding permission for Pipeline lying & Crossing along National Highway-30 (11.51 Mb application-pdf)
04-08-2023
2062 Tamil Nadu Request for permission to lay underground Electrical Cable of 33 KV 1C x 630 sq.mm (03 Nos) along the road from km. 21+712 to km.22+346 (RHS) and 4C X 240 Sgmm EB Cable across the road @ km.22+972 & km.22+973 by Trenchless method (HDD) in Maduravoyal to Sriperumbudur Section of NH-4 in the State of Tamil Nadu for a total length of 694 meters by M/s CMRL, Chennai (345.83 Kb application-pdf)
04-08-2023
2063 Rajasthan Proposal for grant of permission for laying water supply pipeline along NH-52 on Deoli-Kota section from Km. 173.500 to 206.00 of total 32.50 Km. length and 7 nos. crossings by PHED in the State of Rajasthan (1.05 Mb application-pdf)
03-08-2023
2064 Gujarat Proposal seeking ROW Permission for laying 300mm Dia Drainage Pipeline along NH-48 from Km 9+000 to Km 9+120 (Total Length 120m) on Ahmedabad–Vadodara section of NH-48 in the State of Gujarat (662.36 Kb application-pdf)
03-08-2023
2065 Tamil Nadu Permission for laying of 12.75’’ (324mm)/125mm MDPE carbon steel pipeline with OFC cable in HDPE duct (40mm) along the road from km.123/900 to km.124/470 (LHS), km.124/470 to km.124/840 (RHS) and across at km.124/470 by M/s. IOCL CGD (5.10 Mb application-pdf)
03-08-2023
2066 Andhra Pradesh Permission for laying of water supply pipeline from existing Ch.626/800 to existing Ch.634/920 (from existing Ch.626/800 to Ch.630/960–4.16 Km under PIU Kadapa and from existing Ch.630/960 to existing Ch.634/920–3.76 Km under PIU-Nellore) (RHS) and Road Crossing at design Ch.628/925 (falling in the proposed Badvel Bypass) of proposed Mydukur–Badvel Section for a length of 8.12 Km by M/s. APIIC in the State of Andhra Pradesh (1.31 Mb application-pdf)
02-08-2023
2067 Maharashtra Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape–Gonde (Km 539.5–Km 440) section of NH-3 in the State of Maharashtra–MSRDC’s Proposal for Laying 33 KV HT Electrical Line by Aerial (RSJ Poles) & underground from Km. 457+447 to Km. 460+500 (LHS) (Total Length-3.053 Km) on NH-3 (91.40 Kb application-pdf)
01-08-2023
2068 Punjab Permission for laying proposed 125mm Dia MDPE Gas Pipe line along/across NH-703A (Jalandhar-Kapurthala-Sultanpur Lodhi) to connect villages & commercial customers in route and to extend City Gas Distribution (CGD) Network in Kapurthala city & its Surrounding area (length 350 m) 14 nos. of crossing (2.62 Mb application-pdf)
01-08-2023
2069 Rajasthan Request for grant of Right of Way Permission for Water Supply Pipe Line Along the route at NH-62 at Bikaner, Rajasthan (276.44 Kb application-pdf)
01-08-2023
2070 Gujarat Proposal of seeking ROW permission for crossing of National Highway by 66KV S/C Bhiladi-Ramvas Line with ACSR Panther Conductor under “KISAN SURYODAYA YOJNA” between Km 541+000 and Km 542+000 in the State of Gujarat (676.31 Kb application-pdf)
01-08-2023

Pages