Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1821 Rajasthan Proposal for grant of permission for underground crossing of 33 KV 3Cx300 Sqmm Cable (Double Circuit) at Ch. 26.450 and 27.150 on NH-52 (Jaipur-Tonk section) at Chaksu Bypass, Chaksi, District-Jaipur in the State of Rajasthan by JVVNL (2.06 Mb application-pdf)
09-11-2023
1822 Odisha Permission for laying of 132 KV underground power cable crossing the NH-16 at CRPF square as part of UG cabling work from proposed 132/33 KV GIS Sub-Station, Nayapalli to 132/33 KV GIS Sub-Station, Unit-VIIl (1.43 Mb application-pdf)
09-11-2023
1823 Uttar Pradesh Proposal for overhead crossing for 220KV SC Dahi Chowki Unnao (400)-Ajgain TSS Transmission line on NH-27 at Ch 47.250 to 47.300 near Village Malaon, Unnao in the State of Uttar Pradesh (1.39 Mb application-pdf)
08-11-2023
1824 Gujarat Proposal seeking ROW permission for crossing Water Pipeline at Km 65+860 and at Km 79+770 of NH-47 of Kapadvanj-Lasundra Aug. Water Supply Scheme under NRDWP in the State of Gujarat (1.21 Mb application-pdf)
08-11-2023
1825 Uttar Pradesh Proposal for permission of laying underground crossing of 400 KV XLPE insulated Cable between Km. 575–576(Ch. 575.245) across NH-19 (Old NH-2) Fatehpur to Prayagraj Section Village–Ahiran Mahicha, District–Fatehpur in the State of Uttar Pradesh (3.43 Mb application-pdf)
08-11-2023
1826 Uttar Pradesh Permission for laying of proposed 18” Dia Gas Pipeline with OFC along/across NH-709AD along from design ch. 73.680 km to design Ch. 75.850 km (LHS) & across at design Ch. 73.680 km to develop CGD network in Bijnor District in the State of Uttar Pradesh (3.79 Mb application-pdf)
08-11-2023
1827 Gujarat Proposal for permission for laying of 03 Nos. underground 132 KV EHV cable of M/s Torrent Power Ltd for GMRCL’s at RSS at Indroda park across /along NH-147 at km 13/300 to km 13/400 (crossing) 6.080 (crossing) and km 6.080 to km 6.800 (along) in the State of Gujarat (829.94 Kb application-pdf)
07-11-2023
1828 Uttar Pradesh Request for the permission for the laying of underground GAS Pipe Line of M/s Bagpat Green Energy Private Limited for 150 mm Steel Pipeline & 125 mm dia of MDPE Pipe from Ch. 26+458 to Ch. 27+004 LHS is length= 546M, 150MM Steel Pipeline & 125MM Dia of MDPE Pipe from Ch. 27+004 to Ch. 31+600 RHS is length=4.596KM on along & crossing at Ch. 27+004 is length=30m with the Akshardham Eastern Peripheral Expy road, National Highway, New NH-709B (Old SH-57), in the District-Baghpat State of Uttar Pradesh (6.30 Mb application-pdf)
07-11-2023
1829 Maharashtra Proposal From MSEDCL for crossing of 11 KV underground cable line across NH-60 at Km. 163/500, Km. 164/600, Km. 166/600, Km.172/500 & Km. 180/800 Total 5 Crossings on NH-60 (612.90 Kb application-pdf)
07-11-2023
1830 Gujarat Proposal for requesting permission for laying water pipeline across at km. 152/800 at Village-Nimgaon Bhojapur, Tal. Sangamner, District-Ahmednagar on NH-60 (488.87 Kb application-pdf)
07-11-2023

Pages