Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1011 Haryana Request for granting permission for laying 8 Dia Steel Natural Gas Pipeline to set up a gas Distribution in Jalandahr City and surrounding area in Jalandhar District Pipeline laying across to U/s Jalandhar Bypass Ring Road along the pipeline Route in Jalandhar District (402.76 Kb application-pdf)
03-03-2025
1012 Madhya Pradesh Proposal for permission for laying and crossing water pipeline of Bansujara water supply scheme from Ch. 109+547 km to Ch. 127+800 km and Ch. 4+57 to 9+720 (Total length 29.153km and 12 crossings by HDD method) on Damoh-Shahgarh-Tikamgarh section of NH-539 by MP Jal Nigam Maryadit in the State of Madhya Pradesh (19.73 Mb application-pdf)
03-03-2025
1013 Kerala Widening/ Development of existing NH-85 from Km.0+000 to Km.124+636 section of NH-85 to 2L/2L+PS section on EPC Mode-Laying of 200mm DI Pipe from Km.64+490 to Km.65+785 (LHS) by Kerala Water Authority on NH-85 (458.14 Kb application-pdf)
03-03-2025
1014 Kerala Laying of 11 KV UG cable 3x240 Sqm with 102 mm HDPE pipe casing from Km.253+370 to Km.253+560(LHS) by M/s The Deshabhimani Printing & Publishing House Ltd., Kozhikode on NH-66 (560.58 Kb application-pdf)
03-03-2025
1015 Kerala Laying of 110mm PVC Pipe from Km. 372+930 to Km. 373+280 (LHS) including crossing at Km.373+660 through 350mm Dia HDPE pipe by Kerala Water Authority on NH-66 (544.46 Kb application-pdf)
03-03-2025
1016 Rajasthan Submission of proposal for overhead crossing clearance of NH-11 from Singhana to Narunaul Milestone no. /km. 120 & 121 near Village-Dumoli Khurd, Bhuhana Chirawa(District-Jhunjhunu) for construction work of 765 KV D/C Bikaner-lll Neemrana-ll transmisson line (282.79 Kb application-pdf)
03-03-2025
1017 Kerala Laying of 500mm DI pumping main from Kolathumukku to Thachayilmukku (Karunagapally Municipality) (Km. 471+000 to Km. 476+400(RHS), Km. 476+400 to Km. 476+420(LHS) and crossing at Km. 476+400) under AMRUT 2.0 scheme by Kerala Water Authority (545.00 Kb application-pdf)
01-03-2025
1018 Kerala Laying of 3*300 Sqmm 11 KV UG XLPE Power cable by KSEB from Km.318+549- Km.320+050(LHS), Km.320+150-Km.321+150(LHS) and crossing at Km.321+150 of NH-544 (581.22 Kb application-pdf)
01-03-2025
1019 Kerala Laying of 200mm DI Pipe from Km.6+000 to Km.6+736 (LHS) including crossing at Km.6+736 by Kerala Water Authority on NH-85 (446.11 Kb application-pdf)
01-03-2025
1020 Kerala Six Laning of Ramanattukara Junction to start of Valanchery Bypass section of NH-66 (Old-17) from Design Ch. 258+818 (ex Km. 27.840 of Kozhikode Bypass to Design Ch. 298+500 (ex km. 304.2450) in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana (579.04 Kb application-pdf)
01-03-2025

Pages