Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
11 Madhya Pradesh 56290-02.01.2026-Invitation of Public Comments उत्तर प्रदेश राज्य में तहसील-खेरागढ़, जिला-आगरा के सैंया गांव के पास आगरा-ग्वालियर एनएच-44 के (चेनेज 129 किमी से 130 किमी तक) पर 765 केवी डी/सी दौसा-घिरोर टी/एल पार्ट-III (पीजीसीआईएल) की ओवरहेड क्रॉसिंग किए (5.63 Mb application-pdf)
02-01-2026
12 Madhya Pradesh INVITATION OF PUBLIC COMMENTS-4-laning of Khalghat-MP/Maharashtra Border Section of NH-3 from km 84.700 to km 167.500 in the state of Madhya Pradesh under NHDP Phase III on DBFOT basis – Permission for laying of raw water pipeline at Ch. 91.000 to km 99.9 (6.48 Mb application-pdf)
02-01-2026
13 Maharashtra 4 laning of Kondhali-Talegaon section of NH -53 from km 50.000 to km 100.000 in the State of Maharashtra on BOT Basis -Proposal for crossing of 11 KV underground electric line at km 71.760 -Reg (517.67 Kb application-pdf)
01-01-2026
14 Maharashtra Four lanning Nagpur - Katol from 13.000 o km 62.900 section of NH-353J in the state of Maharashtra on EPC Mode-Proposal for laying of 3C-300 sqmm electric cable through aerial poi/HDD along from 19.700 to km 20.295 on RHS total length of 1.250kms -Reg (543.57 Kb application-pdf)
01-01-2026
15 Odisha Invitation of Public Comments- Permission for laying of water pipeline along from km 61/380 to 61/950 & crossing at km 61 /950 on NH-316 (Balighat Chhaka to Bhudan Chhaka of Puri Konark link)) for water supply to Puri Municipality under WATCO Division, Puri - reg. (2.14 Mb application-pdf)
01-01-2026
16 GUIDELINES FOR IMPLEMENTATION OF BATTERY PACK AADHAAR SYSTEM (1.54 Mb application-pdf)
31-12-2025
17 Chandigarh Construction of four lane Greenfield project of Delhi-Amritsar-Katra Expressway (Phase-I Pkg-V) form junction with Ambala-Kaithal-Hisar road (NH-152) near Kharak Pandwa village to junction with Patiala-Smana-Patoran road (SH-10) near Ghagga village (Km 120.250 to Km 157.920) under Bharatmala Pariyojana in the state of Haryana on Hybrid Annuity Mode- NOC case of access Permission for Crossing of Transmission line package TL03 for (b) Siwani-patran (Indi Grid) 400 kv D/C line (Quad) associated with “Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part 3: 6 GW) (Bikaner Complex): Part A” through Tariff Base d Competitive Bidding (TBCB) route -Regarding NOC for NE-5 at Km 149.500 to 149.600 near village Paind-Dutttal, Tehsil Patran, District Patiala (447.04 Kb application-pdf)
31-12-2025
18 Jharkhand Proposal for permission for laying of 08"dia natural gas pipeline along with 40 mm dia OFC (02 Nos). along NH-333A from km 0.000 to km 9.220 (RHS) and 08" dia Natural gas pipeline along with 125 mm dia MDPE pipeline in same trench from km 9.220 to km 12.400 (RHS) (along the road) & MDPE pipeline across NH-333A at km (460.83 Kb application-pdf)
31-12-2025
19 Rajasthan Invitation of Public Comments for Four laning of Reengus-Sikar section Km. 298.075 NHAI PIU-Jaipur letter no.4231 dated 30.12.2025 (144.93 Kb application-pdf)
30-12-2025
20 Uttar Pradesh Request for grant of Right of way permission to lay MDPE pipeline at NH-19 -reg (501.38 Kb application-pdf)
30-12-2025

Pages