Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
41 Gujarat Permission for parallel laying of GGL 125 mm dia. PE gas pipeline CPRS from Chainage 183+300 to 184+000 Km, RHS & Chainage 184+000 to 188+950 Km, LHS & crossing at Ch. 184+000 & Ch. 184+210 Km & Ch. 186+232 Km on NH- 27, Bamanbore-Garamore Road near Gokul Snacks Village-Bhalgam, Taluka-Morbi, Distrct-Morbi (124.21 Kb application-pdf)
04-11-2025
42 Andhra Pradesh Permission for laying of 33KV & 11KV underground Electrical Cable along the highway from Km.674+400 to Km.694+600 (RHS), and from Km.694+600 to Km.700+920(LHS) for a total length of 26520 meters & crossing in 27 locations for a length of 1620 meters in section of six laning of Ranasthalam – Anandapuram, Six laning of Anandapuram-Pendurthi-Anakapalli & Anandapuram–Visakhapatnam–Anakapalli (city limits) section of NH-16 in the State of Andhra Pradesh (368.04 Kb application-pdf)
04-11-2025
43 Andhra Pradesh Permission for laying of 33KV & 11KV underground Electrical Cable along the highway from Km.700+920 to Km.713+920 (RHS) for a total length of 13000 meters & crossing in 13 locations for a length of 780 meters for a total length of 13780 meters in Anandapuram–Visakhapatnam–Anakapalli (city limits) section of NH-16 in the State of Andhra Pradesh (355.40 Kb application-pdf)
04-11-2025
44 Andhra Pradesh Permission for laying of 33KV & 11KV underground Electrical Cable along the highway from Km.713+920 to Km.729+420 (RHS) for a total length of 15500 meters & crossing in 20 locations for a length of 1200 meters for a total length of 16700 meters in Anandapuram–Visakhapatnam–Anakapalli (city limits) section of NH-16 in the State of Andhra Pradesh (383.66 Kb application-pdf)
04-11-2025
45 Andhra Pradesh Proposal for for crossing of 765 KV D/C transmission line at Km.108+442 between Km.108+000 to Km.109+000 of NH-544G near North Palagiri Village, V.N. Mandal, YSR District, in the State of Andhra Pradesh (180.68 Kb application-pdf)
04-11-2025
46 Tamil Nadu Proposal for laying UG sewer pipeline in Thirumangalam-Kollam section of NH-744 along the road from Km 118/200 to Km 118/550(LHS) and Km 118/550 to Km 119/400(RHS) and crossing @ Km 118/550 (4.03 Mb application-pdf)
03-11-2025
47 Kerala Laying of 100m Power cable through 110mm HDPE duct by M/s EVM Automobiles Pvt. Ltd. through HDD from Km.350+400 to Km.350+500(LHS) (532.28 Kb application-pdf)
03-11-2025
48 Kerala Laying underground cable through HDD method from Karicode Junction (Ch.6+100) to the pole marked as KK 105 near Supreme shopping center, Karicode (Ch.6+450) as part of RDSS scheme part-2 (532.33 Kb application-pdf)
03-11-2025
49 Haryana Creation of 220kV D/C line from 400kV S/Stn. PGCIL Naggal Panchkula to proposed 220kV S/StnSadhaura with 0.5 Sq” Moose Conductor against P.O. HDP-48/PD&C/Xen Projects (TL) dt. 25.01.2023 – Overhead crossing of 220 KV HVPNL transmission lines at km.158+713 & km. 158+868 (TL No. 1-2 and TL No. 3-4) (836.58 Kb application-pdf)
03-11-2025
50 Punjab Regarding NOC for overhead crossing of 400kV PGCIL transmission line on NH-52 at km. 223 to 224 near Village Duttal, Tehsil Patran District Patiala (848.86 Kb application-pdf)
03-11-2025

Pages