Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
121 Maharashtra Proposal for permission of crossing of 33Kv underground cable at km 484.600, in the State of Maharashtra (1.13 Mb application-pdf)
11-10-2025
122 Odisha Proposal of OPTCL for permission for crossing of 400kv DC Transmission line at km. 60.724 (2.20 Mb application-pdf)
10-10-2025
123 Andhra Pradesh Issuance of NOC to HPCL for laying of Visakh–Raipur underground product pipeline of 14” dia along with OFC at Km.419+496 (with 20” casing pipe up to IS specification with OFC placed in the casing) (8.99 Mb application-pdf)
10-10-2025
124 Andhra Pradesh Issuance of NOC to HPCL for laying of Visakh–Raipur underground product pipeline of 14” dia along with OFC at Km.456+172 (with 20” casing pipe up to IS specification with OFC placed in the casing) (9.29 Mb application-pdf)
10-10-2025
125 Maharashtra Proposal for crossing of Water pipeline at km 515.760 & km 518.426 on NH-53 by Commissioner, DMC, Dhule, in the State of Maharashtra (1.15 Mb application-pdf)
10-10-2025
126 Rajasthan Proposal Permission for Laying of 4 inch (125mm) diameter MDPE/ Steel Under Ground Natural Gas Pipeline crossing at NH-03, Ch-55.290 (Gulab Bagh Circle), at Dholpur, Rajasthan (5.44 Mb application-pdf)
10-10-2025
127 Punjab NOC Permission for laying of 125mm MDPE pipeline across NH-354 on Sri Muktsar Sahib to Malout road section for extension of pipeline network for PE Sri Muktsar Sahib city connectivity (Bathinda Chowk near Taneja Petroleum to Rupana village (M/s Satia Industries) in Muktsar city, Tehsil & District Sri Muktsar Sahib in the State of Punjab (21.44 Mb application-pdf)
09-10-2025
128 Maharashtra Proposal for crossing of Gas pipeline at km 53.160 by M/s Unison Enviro Pvt. Ltd., in the State of Maharashtra (1.26 Mb application-pdf)
09-10-2025
129 Rajasthan Proposal of permission for laying Optical Fibre Cable (OFC) along NH-58 from Km 55.000 to Km 58.000 (Total length 3.000 Km) on Jaipur-Jodhpur road of NH-58 in the State of Rajasthan (2.35 Mb application-pdf)
09-10-2025
130 Gujarat Overhead crossing of NH-48 at Ch. Km. 180+850 (Between stone No. 180 to 181) for LoC no. AP-52/0 to AP-53/0 of 400kv D/C Saykha-Jhanor line at near Village: Kargat & Nabipur Border, Taluka-Bharuch, District-Bharuch in the State of Gujarat for GETCO, Bharuch (109.97 Kb application-pdf)
09-10-2025

Pages