Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
61 Maharashtra Proposal for crossing of underground 33 KV & 11 KV HT XLPE Electrical Cable between Km. 317.00 & Km. 318.00 (Length 250m) for Existing Nagaon Substation in Malegaon Division under MSKVY 2.0 Scheme across NH-3 (474.05 Kb application-pdf)
30-06-2025
62 Jharkhand Four Laning of Barhi-Hazaribagh Section of NH-33 (Km. 0+000 To Km 40+500) in the State of Jharkhand under NHDP Phase-III (1.47 Mb application-pdf)
30-06-2025
63 Jharkhand Four Laning of Barhi-Koderma section of NH-31 from km. 0+000 to km. 27+500 in the State of Jharkhand under NHDP Phase-IV on Epc mode (1.75 Mb application-pdf)
30-06-2025
64 Jharkhand Crossing proposal of U/C 400kV D/C Quad moose PVUNL (Patratu)-Koderma Transmission line from U/C Bharatmata Project (Varanasi-Kolkata) National Highway at Km. 300+944 (1.74 Mb application-pdf)
30-06-2025
65 West Bengal Permission for using NH land for laying water pipeline (HDPE) on NH-32 at the subject locations mentioned [under JICA / WBPWSP (Purulia), PHE Dte. (468.23 Kb application-pdf)
27-06-2025
66 Bihar Permission for laying of underground BPCL Natural Gas Supply Pipeline along the road from (i) Shri Ram Petrol Pump Sheohar(Ch.39+700) to Pamra Sitamarhi(Ch.55+400) in RHS of NH-104(New NH-227) and (ii) Pamra Sitamarhi(Ch.55+400) to Gausala Chowk Sitamarhi(Ch.63+00) in RHS Left out portion of NH-104(Total length 23.30OKm) in the State of Bihar (430.35 Kb application-pdf)
27-06-2025
67 Gujarat Proposal for granting permission for laying 8” dia steel gas pipeline along the expressway from Ch. 83+132 to Ch. 83+192 (RHS), Ch. 83+132 to Ch. 83+233 (LHS), and across the expressway at Ch. 83+132 (129.17 Kb application-pdf)
27-06-2025
68 Madhya Pradesh Proposal for Oyester Renewable Energy request for grant of permission for underground Electric cable by HDD method for 33KV Electrical Line Crossing at Ch. 54+580 to 54+645 on NH-552G of Agar-Malwa in the State of Madhya Pradesh (3.30 Mb application-pdf)
27-06-2025
69 West Bengal Laying by open trench or jack pushing method of 150 mm (OD) dia DI (K9) Raising Main pipeline along the NH-12 from Chainage Km 72.420 to Km 73.567 (LHS), 200 mm (OD) dia DI(K9) from Chainage Km 73.567 to Km 74.040 and across the road 700 mm (OD) dia DI (K9) at Chainage Km 73.702 under integrated Surface Water Based PWSS for Ranaghat -1 & Ranaghat-11 Block under Nadia Arsenic Division-I, P.H.E. Directorate in the in the District of Nadia in West Bengal (2.93 Mb application-pdf)
27-06-2025
70 Punjab NOC proposal for laying of 600mm Dia Raw water Pipe line from Ch. 39.805 to 40.720 (915 mtr), Ch. 39.930 to Ch. 39.563 (367 mtr.) & Ch. 87.100 to Ch. 88.000 (900 mtr.) and crossings at Ch. 41.550 & 40.320 on NH-205 (Kurali-Kiratpur Sahib Section) in the State of Punjab (444.96 Kb application-pdf)
27-06-2025

Pages