Sorry, you need to enable JavaScript to visit this website.

You are here

  • Proposal for permission of OFC from Km 0.00 to Km 6.700(from Sapekhaiti Chariali) to Arunachal Pradesh Border on NH-52B under PWD,NH Division, Jorhat by Jio Digital Fibre Pvt Ltd
  • NHAI, RO, Chennai - PIU, Krishnagiri - M/s. Jio digital Fibre Pvt. Ltd., - permission for laying of Underground OFC on Hosur — Krishnagiri section of NH-44 (Old NH-7) along and crossing for a total length of 6730.99 meters
  • Terminated project of Four laning of Panikoili-Rimuli section of NH-215 from Km.O.OOOto Km.163.000 (Design Chainage KmO+Og.Qto Km166+173) in the State of Odisha - NOC Proposal for ROW access permission for laying of underground NH Crossing of 33 KV Electrical XLPE Cable of 4 Nos. 1C x 400 sqmm size for power supply from 33/11 kv Sub - Station Naranpur to Jangira 33 Kv fe~der at Ch. Km 113+930 to Ch. Km 113+935 (Village Jamunalia) under ODSSP scheme across the road of NH-215 in Panikolili to Rimuli Section of Keonjhar District of Odisha State as sought by the Executive Engineer, NESCO Utility, Anandapur Electrical Division, Keonjhar Electrical Circle, Keonjhar Govt of Odisha
  • Proposal for access permission to the proposed fuel station of M/s Indian Oil Corporation Limited on NH-44 (Old NH-3) in Km 91.598 (RHS) Khasra No: 526/2 & 823/2 at VillageDhanela, Tehsil- Morena & District - lorena in the state of- Madhya Pradesh
  • Permission for laying of 18" OD 0.281 WT MS Product Pipeline along with OFC across National Highway-5A (New NH-S) at Km. 66.120
  • NHAI, Km RO Chennai — PIU, Chennai- Proposal for laying of water pipeline across the Reg. 10/940 by Open Trench Method in Koyambedu to Maduravoyal section of NH-4
  • NHAI RO Chennai — PIU Chennai – Proposal for granting of NOC for proposed construction of access to the private property of Shri. Saidiah Thondapu, Chennai from Km 6/707 to Km 6/800 on RHS in Survey No. 41/1, 2B & 3C of Thiruneermalai village (Town Panchayat Limit), Alandur Taluk, Kancheepuram District of Chennai Bypass – 3rd Extension of Time – Approval requested
  • Proposal for laying of 0.355 m dia Iron Ore Slurry pipeline & 0.273m dia Return Water Pipeline in the Utility Corridor of NH·215 from Km 212+000 (Koida) to Km 259+453 LRaja~unda) by Mls Shri Mahavir Ferro Alloys Pvt. Ltd
  • Permission for laying electric cable (11 KV) along NH-08, road crossing at km. 68,500 at Dharuhera, Rewari in the state of Haryana
  • Proposal for laying of Sewerage Pipeline from Km. 365.540 to Km. 366.606 (RHS) of total length 1066.0m along NH-1 (new NH-44), at village Khajurla and villa e Kot Kalan in Tehsil & Distt. Jalandhar (PB)
  • PIU – Salem - Permission for laying of under Ground 712 MM dia MS Water pipe line across the road at Km 95/730 & 610 MM dia MS Water pipe line across the road at Km 101/230 of Salem – Cochin Road Section (NH-544) (Athikadavu – Perundurai Scheme as irrigation, Ground water recharge and drinking water supply scheme in Tirupur District) by the Executive Engineer, PWD, WRD Special Project Division, Perundurai – Approval Requested
  • Permission for laying 18” OD x 0.25” MS pipeline along with OFC across NH-64 @ km 30/768(Viramgam to Dumad section of Kandla Gorakhpur LPG line pipeline project) in the state of Gujarat
  • Permission for laying proposed 90 mm dia PE Natural Gas pipeline across NH-64 (Ahmedabd -Dandi Road) at km 74/00 by 4” dia carrier steel pipeline with 10” dia casing pipeline underground to set Gas Distribution network connectivity at Uttarsanda in Nadiad District in the state of Gujarat
  • PIU – Salem - Permission for laying of under Ground Water Pipe Line along the road from 712 MM dia MS Water Pipe Line from Km 94/925 to Km 95/730 (LHS), 63 MM dia HDPE Water Pipe line from Km 95/730 to 96/475 (LHS) & 160 MM dia HDPE Water Pipe line from Km 95/730 to 97/435 (RHS) of Salem – Cochin Road section (NH-544) by the Executive Engineer, PWD, WRD Special Project Division, Perundurai – Approval Requested
  • ROW Permission for laying 600mm dia(Internal) casing pipeline (MS-8mm thick) for laying of 250 mm dia carrier pipeline (MS) for supply of clear water to Purulia Medical College from Pindra head works site to Purulia Medical College through Surulia village across NH-60A at 77.730 kmp
  • Permission for laying proposed 8” dia steel Gas pipeline along (from km 103/900 to km 104/687) and across (@km 104/687) NH-64 from Petlad to Franchise CNG station connectivity in Borsad Taluka of District Anand in the state of Gujarat
  • Permission for laying of Underground Water Supply Pipe line along Khamgaon - Shegaon Road NH-548 C from Km, 21 /400 to 21/950 in Shegaon city - KhalwadiLaying Permission reg. in the state of Maharashtra. Applicant; EE,MJP,Divi- Buldhana
  • Permission for laying of Underground Sewage Pipe line along Khamgaon - Shegaon Road NH - 548 C from Km, 20 / 370 to 20 / 600 in the city Shegaon- Laying Permission reg. in the state of Maharashtra. Applicant; EE, MJP, Divi - Buldhana
  • Proposal for Permission for laying Optical Fiber Cable OFC M/s Jio Digital Fiber Pvt Ltd. Nagpur from Km, 426/300 to 428/000 Km,(Pokharni Fata to Ganpati Mandir) Along National Highway NH-61, in the State of Maharashtra. - Laying Permission reg.: Applicant : M/s Jio Digital Fiber Pvt Ltd.CIN Nagpur
  • Permission for laying proposed 90/125 mm dia MDPE Gas pipeline along NH-64 (Ahmedabd -Dandi Road) from Uttarsanda Vilage to Bhumel in Nadiyad District in the state of Gujarat
  • Permission to lay Optical Fiber Cable From District more Hazaribag Km 36+000 to Km 0+000 Barhi along NH-33, Total section length ROW applied for 36 Km in the State of Jharkhand
  • Access Permission for laying of Natural Gas pipeline of 90 mm dia of M/s. Gujarat Gas Ltd along NH-51 from Km 193/350 to Km 193/887 on Left Hand Side and crossing at Km 193/350 in Wadhwan, Taluka-Wadhwan, District-Surendranagar in the State of Gujarat
  • Proposal of permission for laying of Optical Fiber Cable of M/ s.Telesonic Network Limited along and across NH-52 from Km.338.400 to Km.370.200 (Length 31.800 Km.) and 10 nos. of crossings on Karodi- Telwadi Section of NH-52 in the State of Maharashtra
  • Permission for laying GIGL’s 30” dia Natural Gas Pipeline along with OFC across to NH-65 at NH-Km. 85.291 in village Dokawa, Tehsil-Rajgarh, district-Churu in the State of Rajasthan by M/s. GSPL India Gasnet Ltd
  • Permission for laying of Electric Cable Line along NH-8 (New NH-48) at Ch. 23.425 to Ch. 25.560 (RHS), crossing at Ch. 25.560 on NH-8, Delhi - Gurgaon Section Haryana
  • Permission for laying proposed Electric cable line (66 KV U/G XLPE Cable 240 mm) of M/s Chopra Alloys from km 265.640 to km 266.725 (RHS) along old NH-1 (New NH 44) in section of Panipat Jalandhar Highway in Mandi Gobindgarh, district-Fathegarh Sahib in the State of Punjab
  • Permission for laying of Electric Cable Line along NH-8 (New NH-48) at Ch. 23.425 to Ch. 25.560 (RHS). crossing at Ch. 25.560 on NH-S, Delhi- Gurgaon Section Haryana
  • Permission for laying of Underground Gas pipeline (300mm CS Dis Steel Pipe) by HDD/Trenching method along NH-19 (Kanpur - Prayagraj) between ch. 486.0 to ch. 552.00(LHS) in District- Fatehpur in the state of UP
  • Permission for crossing of storm water disposal pipe 600 mm dia through HDD method at km.3.616 at Kesura on NH - 316 in the state of odisha for the purpose of residential apartment of SBI staff Association cooerative Society at Kesura Chowk
  • Permission for laying underground Optical Fiber Cable along the NH in the section of Ulundurpet - Padalur of NH-45 from Km 268/800 to Km 281/500 (RHS) for a length of 12.70 Km in the State of Tamil Nadu
  • NHAI, RO - Vijayawada - 6 laning of Chilakaluripet – Vijayawada section of NH-16 from Km.355+000 to 434+150 in the state of Andhra Pradesh to be executed as BOT(Toll) on DBFO pattern under NHDP Phase-V- Laying of Water supply pipeline along Highway from Km.401/680 to Km.401/950 on LHS and from Km.401/950 to Km.401/680 on RHS and crossing at Km.401/950 on NH-16 towards Vijayawada
  • 4 - Laning of Rohtak -Bawal section NH 71 from km 363.300 (Design km 363.300) to km 450.800 (Design km 445.853) under NHDP III in the state of Haryana on Design, Build, Finance, Operate and Transfer (DBFOT) basis –Proposal for crossing for construction work of 765 KV D/C Khetri-Jhatikra transmission line for establishment of Transmission system associated with LTA applications from Rajasthan SEZ Part-C under TBCB mode- Provisional Approval
  • 4/6 laning of Delhi/Haryana Border to Rohtak section of NH-10 from Km. 29.700 to Km. 87.000 including Bahadurgarh and Rohtak bye-passes in the State of Haryana under NHDP Phase IIIA on Build, Operate and Transfer (BOT) basis -NOC case for access permission to the proposed Retail Outlet of M/s Nayara Energy Ltd. (Formerly Known as Essar Oil Ltd.) at Km 75.348 (RHS) on NH-10 at village Maina, Distt. Rohtak in the State of Haryana
  • Request for grant of permission for laying of Steel Gas Pipeline along-across NH-166 with 40mm HDPE OFC conduit from Gandhi Chowk Miraj Km 193.216 to Basweshwar Chowk Miraj Km 194.000
  • Proposal for grant of permission for laying of Optical Fiber Cable (OFC) along & across the National Highway at Km 594.600 to Km 594.800 and Km 671.300 to Km 672.100 & crossing Km 671.300 on NH-48 (old NH-4)
  • Proposal for overhead crossing of 220KV Single Circuit Baraut-Shamli LILO Nirpura Line Through NH-709B between ch 36.430 to 36.443
  • Proposal for seeking ROW permission for permission for laying proposed 8” Steel, 4” Steel & 125mm PE Gas Pipeline & across/along NH-27 (Porbandar-Rajkot) to develop city Gas distribution in network in Porbandar and its surrounding area of Porbandar GA in the state of Gujarat
  • Proposal for seeking ROW permission for permission for laying proposed 125mm Gas Pipeline & across/along NH-27 develop city Gas distribution in network Porbandar across/ ang NH-27 in the state of Gujarat
  • Proposal for seeking ROW permission for laying HPCL’s 18" Dia Barmer-Palanpur finished Petroleum Product Pipeline along with OFC across National Highway-27 at Km 578+110 in District Banaskantha
  • Proposal for ROW permission for laying proposed 8" Steel Gas Pipeline along from Km 255+728 to Km 256+451 (RHS) & across at Km 255+728 of NH-48 to set up CNG Station at BPCL Shankar Petraleum at Kosmadi, from IOCL Petrol Pump to BPCL Petrol Pump (Shankar Petroleum) at Village-Kosmadi, Taluka-Kamrej, District of Surat GA
  • Proposal for ROW permission for Trenching, HDPE/PLB Duct (40mm) & OFC laying along/across NH-53, along between (i) Km 116+000 to Km 130+700 (i1) Km 96+830 ta Km 98+960 (iii) Km 92+690 to Km 93+206 and crossings at location (i) Km 101+750 {ii} Km 130+308 (iii) Km 125+676 (iv) Km 120+270 (v) Km 96+830 (vi) Km 98+960 (vii) Km 92+960 and (viii) Km 93+206 of NH-6 in the state of Gujarat
  • Proposal for overhead crossing of 132KV Single Circuit Chaprauli-Kirthal LILO Nirpura line through NH-709B Between ch.43.120 to 43.133
  • Proposal for ROW permission for laying U/G HDPE PLB Duct (40mm dia) on NH-47 section of Gedhra to Gujarat/MP Border in Gujarat state in respect of earlier approval ‘granted for laying of OFC along NH-47 under Bharat-Net Phase-l| between Gadh to Limkheda section from Km 131+000 to Km 160+700 (RHS) including 6 nos, of crossings
  • Regional Office - Vijayawada - Rehabilitation and Up-gradation of existing NH565 from Km. 425/400 to 509/400 (Penchalakona to Yerpedu section) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP-IV through Engineering, Procurement, & Construction (EPC) Basis - Granting of ROW permission for laying of Water Pipe Line along NH-565 to provide drinking water facility to IIT and IISER Tirupati
  • NHAI-PIU-NSK- Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape - Gonde (Km 539.5 - Km 440) section of NH-3 in the State of Maharashtra - M/s. Telesonic Network Ltd.’s (Airtel) proposal for laying OFC in stretches from Km. 451.300 to Km. 452.500 (Length 1.2 Km) on NH-3
  • NHAI-PIU-NSK- Widening of existing 2 lane carriage way to 4/6 lane carriageway configuration for Dhule - Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra - Maharashtra Information Technology Corporation Ltd. (DIT Mantralaya) proposal for laying Telecom OFC in stretches from Km. 303.110 to Km. 330.660 (Length 20.720 Km & Five Crossings) on NH-3
  • NHAI-PIU-NSK- Widening of existing 2 lane carriage way to 4/6 lane carriageway configuration for Dhule - Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra - M/s. Telesonic Network Ltd.’s (Airtel) proposal for laying OFC in stretches from Km. 303.800 to Km. 310.400 (Length 6.6 Km) on NH-3
  • NHAI-PIU-NSK- Widening of existing 2 lane carriageway to 4 lane carriageway configuration for Vadape - Gonde (Km 440.00 to Km 539.500) & Pimpalgaon-NashikGonde (Km. 380.000 to Km. 440.000} sections of NH-3 in the State of Maharashtra - Maharashtra Information Technology Corporation Ltd. (DIT Mantralaya) proposal for laying Telecom OFC in stretches from Km.435.800 to Km. 458.500 (Length 25.30 Km) on NH-3
  • Proposal for NOC for overhead crossing of 400 KV D/C (Twin) Rosa - Badaun transmission line on NH-730C between Km. 49.000 to Km. 49.100 near village - Mirjapur, District - Sadar Shahjahanpur in the State of Uttar Pradesh
  • Proposal for Permission for laying of Underground Optical Fiber Cable (OFC) Bhandara - Khat - Ghotitok road NH 247 from Km, 176/600 (Satona T point) to Km, 168/600 ( Ram Ashwat Chowk) in Bhandara Muncipal Limit in the state of Maharashtra
  • Proposal for Permission to carry out Horizontal Direct Drilling (HDD) and open trenching work for laying of OFC Telecom Ducts/Cable (02Nos) along Jurisdiction on Pune Solapur Road NH 65 from 15 Number Canal Hadapsar to Gramsevak Prashikshan Kendra (RHS) Ch 9/90 to 12/200 1 crossing at Ch 12/170 to 0/03 Total Length 2.30 Km
  • Proposal for grant of permission for laying 400 mm dia DI K-9 Class Raw Water Rising main from T-Point to Paithan area Boundry and Highway crossing at T-Point ( Aurangabad-Paithan NH-752 E from DPR Design Ch. 45+550 to Ch. 46+000)
  • Proposal for laying 800 mm dia & 1000mm dia Sewer Pipe Line along NH-3 on from Km. 308/700 to Km. 309/600 & 310/400 to 311/800 along NH-3 in Malegaon City
  • Proposal for laying 300 mm dia Water Supply Line along NH-3 on LHS along Service Road from Tata Services to Adgaon Phata near Medical Phata in Nashik City
  • Permission for road crossing of the NH-34 at Chainage Km 40.711 at Awalsiddhi More in connection with Surface Water based water supply scheme for Arsenic affected areas of HabraGaighata & adjoining mouzas under North 24 Parganas district
  • Proposal for construction of part of 220 kv D/C Monopole Transmission Line from 35+900 (Wadkhal) to 53+500 (Nagothane) RHS along NHAI utility corridor
  • Regarding permission for laying Natural Gas pipeline of 10 inch diameter from km 13+380 to km 17 + 880 along old NH 71 in section of Rohtak Panipat section of Highway in district- Rohtak in the State of Haryana by open trench method from km 17+380 to km 19+380 and rest by HDD method and 1 Crossing at km 15+137 of 16 inch diameter by HDD method in Rohtak -Panipat section of Highway in district- Rohtak in the State of Haryana
  • Request for the permission for laying of underground Gas Pipeline of 12° Dia Steel Pipe and 125mm Dia MDPE Pipe of M/s Indraprastha Gas Limited from Ch. 79.100 (RHS) to Ch. 92.300 (RHS) and across the National Highways at 03 number of locations. The total section length from ROW applied is 13.20 km on along National Highways (Delhi-Muzaffarnagar Road), NH-58 (New NH-334) in the State of Uttar Pradesh
  • Proposed layout plan for granting the permission to lay 200 mm Diamter natural gas pipeline (CS Pipe) of Haryana City Gas Distribution Ltd along NH-8 (New NH-48) from Km. 33.370 (RHS) to Km, 42,100 (RHS) [Length - 8730M] in District - Gurgaon and State - Haryana
  • NHAI, Madurai Region – Highway Administration – laying of cables under PIU, Karaikudi - Permission for laying underground Optical Fiber Cable by M/s. Telesonic Networks Ltd, Chennai along highway (i) From 13/400 to Km.13/500 & (ii) From 15/900 to Km.16/600 and across highway (i) From 13/400& Km. 15/900 on Madurai – Ramanathapuram section of NH85&87 (old NH49) in the State of Tamil Nadu
  • NHAI, Madurai Region – Highway Administration – laying of cables under PIU, Tuticorin - Permission for laying underground Optical Fiber Cable by M/s. Micro Plus Networking Solution Private Limited., Chennai along highway from Km 0/000 to Km 5/000 on Tuticorin – Tirunelveli section of NH138 (old NH7A) in the State of Tamil Nadu
  • Regarding grant of necessary permission
  • Proposal for laying of D.I. Water Supply Pipe Line on NH-248A on Gurgaon – Sohna Road along the Highway with from Km. 14.990 to Km. 15.850 RHS (Length 860m), Km. 15.850 to Km. 16.505 LHS (Length 655m) & Km. 16.505 to Km. 16.740 RHS (Length 235m) (Total Length 1750m)
  • Proposal for NOC for access permission to the proposed fuel station on NH-347 in km. 65, (Ch. 64.426, LHS) Village-Pathrashivlal, Tehsil-Mohkhed & District-Chhindwara in the State of Madhya Pradesh
  • PIU, Salem – Request for permission to lay underground Optical Fibre Cable (OFC) on NH-68 (Salem to Ulundurpet Section) along the road from Km 95/200 to Km 101/100 (RHS), Km 97/900 to Km 98/800 (LHS) for a total length of 6800 meters and across at km 95/200, Km 95/300, Km 98/700, Km 98/800, Km 100/900, Km 101/100 in the limits of National Highways by M/s. Jio Digital Fibre Private Limited, Chennai
  • NHAI- RO Madurai – PIU, Dindigul, - PIU, Dindigul - Permission for erection of 22 KV Over Head Power Transmission line along NH from Km 3/150 to Km 5/950 in the section of Dindigul – Theni of NH-45(E) in the State of Tamil Nadu
  • PIU–Salem – Permission for laying of 33KV, 3 cores X 400 SQ MM Cable (3 Runs) underground Electrical Cable line along the road at Ch.62/170 to 62/187 (LHS) & Road crossing Ch.62/170, underground water pipeline across the road at Km 62/185& Under ground water pipe line along the road At Ch.65/132 to 65/309 (LHS) & Road crossing Ch.65/309 of Salem - Cochin road (Kumarapalayam – Chengapalli section) of NH-544 by the Executive Engineer, PWD, Water Resources Department, Special Project Division, Perundurai
  • Permission for laying underground 220 KV EHV cable along km 40/840 to km 40/880 RHS, km 40/860 to km 40/880 LHS, Km 40/740 to km 40/800 RHS and cross km to km 40/740 on NH 147 in the state of Gujarat
  • Application for NOC of a new Retail Outlet at Km. 1084.209 (RHS) on NH-31 at Location: Rangia Bhatkuchi, Village; Murara, Dag no. 412, 413, 414, 417, 418/419/420 & Patta no. 1/7/8 respectively, PO; Rangia, PS; Rangia, District; Kamrup, Assam
  • Permission for laying OFC along / across NH-56 (Kakrapar bypass - Vyara road) from km 597/810 to km 599/400 in the state of Gujarat
  • Permission for laying underground 01 no of 33 KV HT line across NH-147 at km 33/108 in the state of Gujarat
  • Permission for laying HDPE/PLB Duct (40 mm) & OFC cable along NH 56 (Mandvi-Zankhvay section) between km 536/00 to km 573/00 in the state of Gujarat
  • Regarding submission of drawing with relevant document for Highway crossing of 33 KV New Line (for existing 33KV tapping to new PSS Aura) near Aura Village Giridih District under DDUGJY (Pkg-2)
  • Issue of Access Permission to install MS/HSD retail outlet on LHS at Km. 143.630 of NH-75 in Survey number 24/5 and 25/6 of Chikkagondanahalli village, Channarayapatna Taluk, Hassan District, Karnataka state-Speaking Order
  • Proposal seeking permission for laying of OFC cable along NH-548B from Mashal Km 5.50 to Indi Basaveshwara Circle Km 51.50 on RHS for a total length of 46.00 Kms through Open trench/HDD method and two crossings at Km 5.50 & Km 51.50 through HDD method by M/s.Jio Digital Fibre Pvt. Ltd
  • Permission for laying of Optical Fibre Cable (OFC) by M/s. Reliance Jio Digital Fibre Private Limited form km.329/300 to km.337420 for a total route length of 8120 mts in Duttulauru Mandal SPSR Nellore District on Vaggampalli to Dornala T-Junction section in the state of Andhra Pradesh
  • Permission for laying of Optical Fibre Cable (OFC) by M/s. Reliance Jio Digital Fibre Private Limited form km.1371+585 to km.1380+335 for a total length of 8750 mts on Nellore Bypass section
  • Proposal for seeking ROW permission for laying of 2 Nos. of 11 KV 3C X 185 5q. mm *LPOE Cable Underground Line Crossing at Km 371+350 of NH-8E (Extn) near LS No. 46- 47, Village-Gosa, Taluka & District-Porbandar in the section of Porbandar-Veraval for providing 375 KVA New HT Connection
  • Projects comprising of 9 NH stretches (Bundle-1) on Toll, Operate, Maintain & Transfer Mode- Bamanbore-Garamore (Km 182+600 to Km 254+537) section of NH-27 in the state of Gujarat. -Proposal for grant of ROW permission for laying OFC along the route mentioned below Total 1392m from Km 222+840 near Dhuva-Village 1132m_and 2294540 to 229+800 near Jambudiya-Village 260m on Bamanbore Morbi
  • Projects comprising of 9 NH stretches (Bundle-1) on Toll, Operate, Maintain & Transfer Mode- Bamanbore-Garamore (Km 182+600 to Km 254+537) section of NH-27 in the state of Gujarat, - Reg. Proposal seeking ROW permission for laying OFC alone. NH-27 from km 244+000 to KM 246+000 (Total Length 2 Kms) & Cross of NH-27 @ 246+000
  • Projects comprising of 9 NH stretches (Bundle-1) on Toll, Operate, Maintain & Transfer Mode- Bamanbore-Garamore (Km 182+600 to Km 254+537) section of NH-27 in the state of Gujarat. - Proposal for grant of ROW permission for laying OFC alang the route from km 208+700 to km 209+600 on RHS (Total 900m Length) near Village-Hasanpar on Bamanbore Morbi section of NH-27 in the state of Gujarat
  • Proposal for grant of ROW permission for laying Optical Fibre Cable (4G Project) along the Route Mentioned below (Total Lenghth-55840 Mtr.) Along the route from Km 379+100 to Km 379+220 on RHS 120 Mtr and Km 379+200: to Lm 434+850 on LHS 55630 Mtr on Porbandar-Dwarka section Length-(55750 Mtr} and 2 Road Crossing at Ch. 379/220 and 427/850 (90 Mtr.) on NH-51 Total Route 55840 Mtr
  • Proposal seeking permission for laying of 66 KV under ground electrical cable by M/s. BMRCL, Bangalore from Km 452.500 to 456.800 of NH 948 through open trench/HDD method (550 mts. from Km 454.00 to 454.550) and 03 nos. crossings of village road at Km 452.500, Km 455.740 & 456.340 through HDD method
  • Permission for laying 6/12” dia casing pipelines (8 nos.) for laying of Drinking water pipeline/Electric cables (3 nos)/OFC Cable/Instrumentation Cables (3 nos) across National Highway-25 between NH km. stone 86 & 87 to connect Residential Township and Refinery area in Village Sambhra. Tehsil-Pachpadra, District-Barmer in the state of Rajasthan. Request to grant permission for crossing of NH-25 at locations
  • Proposal for grant of permission for crossing of diversion of existing 400 KV D/C (Quad Bundle), Raipur Wardha Transmission Line of Power Grid Corporation of India Limited on Wardha-Yavatmal Nanded BG Line of Central Railway
  • 4 - Laning of Rohtak -Bawal section NH 71 from km 363.300 (Design km 363.300) to km 450.800 (Design km 445.853) under NHDP III in the state of Haryana on Design, Build, Finance, Operate and Transfer (DBFOT) basis –Proposal for crossing for construction work of 765 KV D/C Khetri-Jhatikra transmission line for establishment of Transmission system associated with LTA applications from Rajasthan SEZ Part-C under TBCB mode
  • Six laning of Nidgatta-Mysuru Section from Km. 74.200 to Km. 135.304 of NH-275 in the state of Karnataka (PKG-II) – Permission for laying underground water pipeline along the National Highway NH-275 (Bangalore-Mysuru section) from Km. 122.00 to Km. 122.300 and across NH at Km. 122.000 by HDD Method
  • Proposal for overhead crossing of 132KV S/C transmission line at Chainage 147+917 [between Km. 147.000 to 148.000] on NH-758 at Mandalgarh, Distt. Bhilwara in the State of Rajasthan by RRVPNL
  • NHAI-PIU-NSK - 4/6-Laning of Pimpalgaon - Nashik - Gonde (Km 380 - Km 440) Section of NH-3 in the State of Maharashtra - M/s. Tata Teleservices (Maharashtra) Ltd.’s, Proposal for laying of OFC in stretches from Km. 417.400 to Km. 417,800 (LHS) Total length- 400m on NH-3
  • Proposal for permission for crossing of water pipeline water supply improvement scheme for Burhanpur
  • Proposal for final access permission to Private property of “Hitender Arora, Sunita Arora both as karta of HUF and Arvinder Kaur” at Km 256.980 (RHS) of NH-1 (New NH-44) at Vill. Chanallo, Tehsil & Distt. Fatehgarh Sahib in the State of Punjab
  • Gas Distribution network for Sirohi & Jalore GA in Rajasthan State (Pindwara SpuerlineAlternate Route): Proposal for Laying 8" dia steel natural Gas pipeline parallel to NH-27 across to National Highway -27 (Pindwara-Udaipur) from NH- Ch. 695/531 Km. to 692/521 Km. (L=3/010 Km.) near village Kantal along the pipeline route in Sirohi District by M/s. Gujarat Gas Ltd. in the state of Rajasthan
  • Proposal for NOC for overhead crossing of 132 KV D/C Soroan -Pratapgarhlilo at Mandhata line over NH-96 (New NH -330) at Km. 118.068 in the State of Uttar Pradesh
  • NHAI, Madurai Region - PIU, Trichy –NOC for erection of 11 KV HT 6 HDOH line from Kumaramangalam Feeder crossing EB lines at Km 201/620 under DDUGY Scheme in Ulundurpet – Padalur section of NH-45 in the State of Tamil Nadu
  • 4 lane Duburi to Chandikhol section NH-53) in the state of Odisha - ROW permission for laying iron ore slurry pipeline in the ROW of NH·53 from Duburi to Pankapal (Dakbangala Chhak) chain age 389.000 to chainage 397.700
  • Proposal for permission of OFC from km 344.500(NL Bypass)to km 429.880( Silapathat Pukai Tinali)on NH-15 under NH Division by M/S Telesonic Network Ltd)
  • NHAI-PIU-NSK- Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape–Gonde (Km 539.5 – Km 440) section of NH-3 in the State of Maharashtra – Maharashtra Information Technology Corporation Ltd. (DIT Mantralaya) proposal for laying Telecom OFC in stretches from Km. 471.300 to Km. 539.500 (LHS & RHS) (Length 47.90 Km & 15 Crossings) on NH-3
  • Application for the Completion Certificate for access Permission for nwly constructed Retail Outlet at NH-3, Design Ch. 100.956 & Km. 335.426, LHS, Survey No. Part of 105/2/1KHA/2 & Part of 105/1, Village-Gader, Tehsil & Dist.-Guna, State of Madhya Pradesh
  • Application for permission for construction & use approaches / access road for proposed company operated CGS cum CNG Mother Station (COCO Pump) at NH-27. Ch. 12764386, LHS part of Survey no. 225/1 & 224/2, PH No. 24, Village-Kulwara, Tehsil-Kolras, District-Shivpuri in the State of MP
  • Application for the Permission for construction & use of approaches/access road for NOC for access permission to the proposed fuel station of M/s Hindustan Petroleum, Corporation Limited on NH-552G (Old SH-27) In Km. 182., Ch. 181.050, LHS at Village- Soyat Kalan, Tehsil Susner, District Agar Malwa in state of Madhya Pradesh
  • Proposal for the construction of an approach road & Slab Culvert for proposed retail outlet of Nayara Energy Ltd. (Formerly Essar Oil Ltd.) on New NH-46 (Old NH-3) at Ch. 128.722 (128.705-128.740) RHS khasra No. 839/2, Ph No. -59, Village-Mudeni, Tehsil & District Shivpuri_ in the'state of Madhya Pradesh
  • Four laning of Biaora to Dewas Section from km 426+100 to km 566+450 of NH-3 in the State of Madhya Pradesh under NHDP Phase-IV in BOT (Toll) basis on DBFOT pattern - Progosal for construction of an approach road & slab culvert for proposed retail outlet of Reliance BP Mobility Ltd. on New NH-52 (Old NH-3) at Ch. 323.116 RHS, Khasra No. 248/1/1, 248/1/2, 248/2/1 & 248/2/2, Village-Birgod, Tehsil-Tonk Khurd & Distt-Dewas in the State of Madhya Pradesh
  • NHAI – RO Hyderabad – PIU Warangal–Proposal for Permission for laying 14-inch dia (355.6mm) underground liquefied Petroleum Gas Pipeline (LPG) along with 40 mm dia HDPE duct for Optical Fiber Cable (OFC) along Hyderabad-Yadgiri section of NH-163 at Km.20.212 in the State of Telangana
  • Permission Proposal for laying underground Optical fiber cable along from Km 6/300 to 6/360(LHS) and across at 6/360 on Coimbatore- Karur-Thirichirapalli-Chidambaram road of NH-81in the State of Tamil Nadu
  • Issue of NH Access Permission for New Retail Outlet abutting on RHS Boundary of NH-948 (Old NH-209) at DE.CH.454.040 in Survey No. 177/1, 177/2 & 177/3 of Kaggalipura-Village, Uttarahalli-Hobli, Bangalore South-Taluk, Bangalore Urban District and Karnata
  • Proposal seeking Permission for laying of OFC cable along NH-150 from Likkankera Km 99.900 to Saidpur Km 106.100 on RHS for a total length of 6.20 Kms through open trench/HDD method by M/s Jio digital Fibre Pvt Ltd
  • Proposal seeking Permission for laying of OFC cable along NH-150 from Likkankera Km 99.900 to Saidpur Km 106.100 on RHS for a total length of 6.20 Kms through open trench/HDD method by M/s Jio digital Fibre Pvt Ltd
  • Proposal seeking Permission for Laying of OFC cable along NH-50 from Kamalanagar at KKMH border Km 0.00 to Sangam Km 15.00 on RHS for a total length of 15.00 Kms through open trench /HDD method by M/s Jio Digital Fibre Pvt ltd
  • Proposal seeking permission for laying of OFC cable along NH-150 from Sadapur Km 110.800 to Km 118.500 (Telengana Border) on RHS for a total length of 7.70 Km through open trench/HDD method by M/s Jio Digital fibre Pvt Ltd
  • Granting of permission for laying OFC cable from Bhatkal PLD Bank (230.140) to Maravante (Km.264.500) on RHS & from Maravante (Km.264.500) to KundapurShastri Circle (Km.281.350) on LHS for a total length of 51.210kms along NH-66
  • Proposal for NOC permission for laying of sewer pipeline through trenchless method at 5 locations with chainages Km. 275.811, 275.828 ,276.038 ,276.396, 276.592 of NH-31 (56)
  • Permission for the proposal of M/s. Andhra Pradesh Gas Distribution Corporation Limited, Visakhapatnam for laying 18” dia Natural Gas pipeline along with 6” dia Optical Fibre across NH-16 at Km.717.800 in Anandapuram - Visakhapatnam - Anakapalli Section for the City Gas Distribution of Visakhapatnam in the State of Andhra Pradesh