Sorry, you need to enable JavaScript to visit this website.

You are here

  • Permission for laying of Underground Water Supply Utility line of 350mm dia DI pipe from km 507+550 (Proposed Interchange with NH-353I) to km 511.950 (Samruddhi Mahamarg Crossing) on Wardha - Butibori section of NH-361 (Total length -4.52 kms) (along 4.40 km & Across 120m)
  • Proposal for Permission for laying 16” dia. underground multi — product petroleum pipeline along with 40mm dia. HDPE ducts for OFC by M/s. Bharat Petroleum Corporation Limited at Km.348/375 of NH 544D of Kurnool-Narasaraopeta road in the State of Andhra Pradesh
  • Proposal for Permission to laying Underground Water pipeline 400 mm, 300mm, 200mm, along Morshi - Chandur Bazar - Achalpur road section of NH-353- J, from Ch. In Km, 38/690 (Tongalapur Junction) to 53/790 (Achalpur Junction) in Taluka - Achalpur and Chandur Bazar, District - Amravati, in the State of Maharashtra - Laying Permission. Applicant: M/s Executive Engineer, MJP, Amravati
  • Proposal for Permission to laying Underground Water pipeline, along Nagpur - Umred - Bhwapur - Nagbhid - Bramhapuri - Armori road section of NH-353-D, from Ch. In Km, 134/100 to 136/725 (Waghala) in Taluka - Armori, District - Gadchiroli, in the State of Maharashtra - Laying Permission. Applicant: M/s Executive Engineer, Rural Water Supply Division, Zilla Parishad, Gadchiroli.
  • Proposal for Permission to laying Underground Water pipetine, along across Digaras - Darwha - Karanja road section of NH-361- C, from Ch. In Km, 33/00 to 53/00 (Length 20.00 Km, Along) and @ Ch. In Km, 53/00 (Length 0.03 Km Across) Total length 20.03 Km, at Darwha in Taluka - Darwha, District - Yavatmal - Laying Permission. Applicant: M/s Chief Officer, Nagar Parishad, Darwha.
  • NHAI - PIU, Salem - Permission for Erection of 110KVDC line from Thalaivasal 110/22 KV SS to Thalaivasal Traction 110 KV SS - EHT line across NH-79 of Salem - Chennai in between Km 68/800 & 69/000, TamilNadu by the Executive Engineer, M/s ‘Transmission Line Construction, Udayapatty, Salem - Approval requested
  • Proposal for ROW permission for laying of 2 Nos of 11 KV 3Cx185 Sqmm XLPE Cable underground line crossing near Km 403+100 of NH-51 Porbandar-Dwarka section near LS No.1166, Village-Kuchhadi, Tal. & Dist.-Porbandar of Porbandar-Dwarka section or providing 85 KW New LTMD connection of M/s UNIQUE Resort
  • Proposal seeking Permission for laying Optical Fibre Cable at (i) Silchar Capital Point to Madhurapul (Clock Tower) via Rongpur (L=3.65 Kms) on NH-53 (Old)/NH-37 (new), (ii) Silchar SILO83 Tower near Ismail market to Capital Point via Indian Oil Petrol Pump (L=0.480 Kms) on NH-54 (Old)/ NH-306 (New) & (iii) Pailapul (Near Nehru Statue) to Pailapul (Manipur Road) (L=0.25 Kms) on NH-53 (old)/NH-37 (New) by M/s Telesonic Networks Ltd. under Silchar NH Division
  • NHAI-PIU-Kolhapur- Four Laning of Satara - Kolhapur to Maharashtra State Border Section of NH-4 from Km 592.240 to Km 725.000 in the State of Maharashtra- Permission for laying of 11KV UG cable for crossing at national highway NH-48 near Vaibhav Housing Society, Ujlaiwadi, Tal - Karveer, Dist - Kolhapur
  • Six Laning of Surat-Dahisar Section of NH-8 from Km 263.000 to Km 502.000 (Length Km 239.000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V. Proposal for ROW Permission for laying 900mm Dia DIK 9 Pipeline parallel to NH-48 from Km 367+030 to Km 367+560 under Vapi City Underground Sewerage Line scheme in the state of Gujarat
  • Proposal of GAIL (India) Limited seeking permission for laying of proposed 18" OD X 0.281" WT MS Natural Gas Pipeline alingwith 40mm OFC across NH-60 at NH Chainage 25.321 in Balasore District
  • Permission to lay distribution Main Pipeline across and along the Nidaghatta to Mysuru section of NH-275 to supply drinking water from Kaveri River for MVS of Mahadevapura, Chikkanakanahalli, K-.Shettihalli and other 16 villages of Srirangapatna taluk, Mandya District, Karnataka State
  • Four/Six Laning of Gujarat/ Maharashtra Border-Surat-Hazira Port section of NH-6 (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Reg. Proposal for ROW Permission of laying Pipeline near Unn-Gabhani Junction at Gabhani Khadi_bridge- Across NH-53 at Km 33+020 and Km_33+060 in between Km 33+000 and Km 34+000 by Boring & Pushing Method (HDD Method)
  • Permission for lay Optical Fiber Cable on NH-44 (old NH-7) from Seoni to Khawasa road from Seoni Km, 600.000 to Mohgaon Village Km 624.480, from Mohgaon Village Km 624.480 to Suktara Village Km. 626.700, from Pindkapar Village Km 636.550 to Km 638.400, from Pipariya Village Km. 639.450 to Setewani Village Km. 642.900, from Pachdhar Village Km. 647.900 to km 649,000 and km 650.150 to Knawasa Km 653.000 Total Section length ROW applied for 35.030 Kms.
  • Proposal for grant of permission for 3 nos. crossing for Drinking Water Pipeline between Dhor and Shakargarh section of NH-148D (Gulabpura-Uniyara) at Ch. 164+850, 170+930 & 173+340 by HDD method “Balance work of Cluster scheme of 315 villagers of Mandalgarh, Bijoliya & Jahajpur Tehcil along with Augmentation of UWSS of Mandalgarh & Bijoliya towns from Aroli Headworks under Chambal-Bhilwara Water Supply Project, Phase-II with O&M for 10 years on single point responsibility trunkey basis (NIT No 01/2017-18) by PHED
  • Permission for laying of Underground Water Supply Utility line of 350mm dia DI pipe from km 507+550 (Proposed Interchange with NH-333]) to km 511.950 (Samruddhi Mahamarg Crossing) on Wardha - Batiberi section of NH-361 (Total length -4.52 kms) (along 4.40 km & Across 120m)
  • Four/Six Laning of Bharuch to Bharuch (Km 198+00 to Km 263+000) section of NH-8 in Gujarat on BOT Basis, Package BOT-2. Reg. Proposal for ROW Permission of laying of proposed 125mm @ PE U/G Gas Pipeline Along Km 259+337 to Km 260+144(LHS) & Km 259+337 to Km 260+281(RHS) and Across at Km 260+055, 260+100, 260+121 of NH- 48 (Ahmedabad-Mumbai) (Umbhel-Kadodara) and across Asphalt Road (NH-48 Service Road) to connect Sarvajanik Smashan Gruh and other domestic, commercial & industrial prospect in Kadodara at Taluka-Kamrej & Palsana, District-Bharuch of Bharuch GA in the state of Gujarat
  • Proposal for permission for laying Optical Fibre cable (OFC) along the NH-440 road by M/s Telesonic Networks Limited from km 97/800 to km 107/500 (LHS) of Yerraguntla - Proddatur section of NH 440 for a total length of 9700mtrs in Kadapa District in the State of Andhra Pradesh
  • Proposal for permission for laying Optical Fibre cable (OFC) along the NH- 167BG road by M/s Vindhya Telelinks Limited from km 36/460 to km 68/400 (LHS) with road crossing at km 36/460 (LHS-RHS), Km 55/550 (LHS-RHS) and at km 68/400 (LHS-RHS) of NH-167BG for a total length of 31.940Km in the State of Andhra Pradesh
  • Proposal for permission for laying Optical Fibre cable (OFC) along the NH-167B road by M/s Telesonic Networks Limited from km 0/0 to km 8/600 (RHS), Km 25/400 to 41/100 (RHS) and Km 43/100 to 58/300 (LHS) and across the road at km 8/600 of Mydukur - Singarayakonda section of NH 167B for a total length of 39515mts in Kadapa District in the State of Andhra Pradesh
  • Laying of Clear Water Rising Main and Distribution Network Pipeline Along/ Across the NH-143 by Mis RWS&S, Rourkela
  • Rehabilitation and up gradation to 4- laning of Teleibani- Sambalpur section of NH-53 (Km.493.300 to Km.545.176 to Km.566.000) in the state of Odisha under EPC Mode- Permission for laying of underground 33 KVA XLPE Cable
  • RO - Vijayawada - Permission for crossing of Overhead electrical 400 KV Twin Moose DC line from existing 400/200KV Vemagiri substation to 400/200KV Kamavarapukota Substation (Zone-5) on Turn Key basis by APTRANSCO across NH-16 at flyover No.48 (Km 37.850) near Dubacherla Village, Nallajral Mandal (60m) for a total length of 60m in West Godavari District in the State of Andhra Pradesh
  • NHAI-PIU-NSK-Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape-Gonde (Km 539.500-Km 440.000) section of NH-3 in the State of Maharashtra Maharashtra Jeevan Pradhikaran (MJP) under Scheme of Jal Jeevan Mission Proposal for laying Water Pipeline from Igatpuri to Shahapur, Total length- 60.72 Km & Crossing 13 Nas. on NH-3
  • NHAI-PIU-NSK-Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape - Gonde (Km 539.5-Km 440) section of NH-3 in the State of Maharashtra - M/s. Mumbai Urja Marg Ltd.’s Proposal for Overhead Crossing of 400 KV D/C Transmission Line at Km. 524.190 on NH-3
  • NHAI - RO Hyderabad - PIU Nirmal- Proposal for crossing of 132KV radial 2- Phase DC/SC line from existing 220/132 KV SS Kamareddy to proposed 132/25 KV Talamadla Railway Traction Substation (CMD of TOMVA) in Kamareddy District- Crossing of 132KV radial 2- Phase DC/SC line at km.391+400 near Jangampally Village on Nagpur to Hyderabad section of NH-44 in the State of Telangana
  • NHAI - RO Hyderabad - PIU Nirmal- Proposal for crossing of 220KV DC line from 400/220KV SS Dichpally to 220/11KV LIS SS_ at Yacharam Thanda - Crossing of 220KV DC line between km.353+400 to Km.353+60U near Chandrayanpally Village on Nagpur to Hyderabad section of NH-44 in the State of Telangana
  • Permission for laying of Airtel Optical Fiber by HDD method from Rairakhol Bhima Bhoi College square to Angabira Bridge on NH-153(B) from km 35/350 to 87/000 for a length of 51.350 km
  • RO - Vijayawada - Permission for crossing of Overhead electrical 400 KV Twin Moose DC line from existing 400/200KV Vemagiri substation to 400/200KV Kamavarapukota Substation (Zone-5) on Turn Key basis by APTRANSCO across NH-16 at flyover No.48 (Km 37.850) near Dubacherla Village, Nallajral Mandal (60m) for a total length of 60m in West Godavari District in the State of Andhra Pradesh
  • NHAI-PIU-NSK-Four laning of Sinnar to Shirdi Section of NH 160 from Design Ch:0/000 to Ch:50/943 including Sinnar Bypass of 3.375 km in the State of Maharashtra on Hybrid Annuity Mode - Maharashtra State Electricity Transmission Company Ltd.’s (MSETCL) Proposal for Overhead Tower Crossing between Km. 39.860 and Km. 39.870 across Sinnar-Shirdi Section of NH-160
  • Four Laning of Ahmedabad to Godhra Section of NH-59 from Km 4+200 to Km 122+420 in the state of Gujarat on DBFOT Basis under NHDP Phase-lll. - Proposal for ROW permission for laying and crossing proposed 12” Steel & 6” Steel Gas Pipeline Along NH-47 From Km 89+729 to Km 89+181 (RHS)(Line-3), from Km 89+181 to Km 79+851 (LHS)(Line-3), from Km 80+147 to Km 76+316 (RHS)(Line-6), Asphalt Road Km 89+834 to Km 89+729 (To Sevaliya) Approach Road-105+24 Mt. (Line-3), Asphalt Road Km 79+851 to Km 80+023 (To Balasinor)-Approach Road-72+34 Mt. (Line-3) & Across NH-47 at Km 89+181 (Line-3), at Km 80+147 (Line-6)(Ahmedabad Indore) to develop City Gas Distribution Network in Ladvel, Sevaliya,Balasinor and its surrounding area of Kheda & Mahisagar GA
  • Proposal for access permission to M/s HPCL for crossing of 115mm diameter gas pipeline at km 64+280 & laying along from km. 62+760 to 64+280 (RHS) in Sonepat-Panipat section of old NH- (New NH-44) by HDD method in the State of Haryana
  • NOC for laying of 4 inch DIA pipe below the bridge over the Khanpur Naliah at Nagrota
  • Permission proposal for laying underground Sewer pipe line along the road from Km 57/800-58/653(RHS),Km 59/343-59/500(LHS),Km 59/225-59/600(RHS) crossing at Km 56/630,Km 56/900,Km 57/525,Km 58/170 and 59/110(5 Nos.) of NH-234(New NH- 38)(Mangalore-Villupuram road) in the state of Tamil Nadu-for providing under AMRUT Scheme By Vellore City Municipal Corporation
  • Permission proposal for laying underground Sewer pipe line along the road from Km 65/457-65/532(LHS),Km 65/568-65/624(RHS) Km 65/871-66/063(RHS),Km 66/100-66/211(LHS),Km 66/390-66/635(LHS), Km 66/850-66/991(RHS),Km 66/915-69/300(LHS) and crossing at Km 65/532, Km 65/723, Km 65/787, Km 65/871, Km 66/170,Km 66/291,Km 66/407, Km 66/665, Km 66/800 and 66/915(10 Nos.) of NH-234(New NH-38)(Mangalore-Villupuram road) in the state of Tamil Nadu-for providing under AMRUT Scheme By Vellore City Municipal Corporation
  • Proposal for grant of Permission for laying of 8 inch dia meter Steel Natural Gas Pipeline from Village — Mehta, Tehsil — Baba Bakala, District Amritsar to Batala City laying along the NH from km. 72.929 to km. 73.869 (LHS) and km. 73.869 to km. 79.078 (RHS) and crossing at km. 72.929 & km. 79.078 on old NH-15 (New NH-54), under jurisdiction in the State of Punjab by HDD method
  • RO - Vijayawada - Permission for laying of OFC Cable using HDD Method on NH-16 crossing at Km. 681+600, Km 683+684, Km 686+100, Km 694+250, Km 695+200 Km 696+792 and Km 707+900 for a total route length of crossing 420 m (Across the road) Bheemunipatnam, Anandhapuram, Nakkapalli and Pendurthi in Visakhpatnam District of Andhra Pradesh
  • Four laning of Sambalpur Bargarh - Orissa / Chhattisgarh Border Section of NH-06 from Km.0.000 to 88,000 in the State of Orissa to be executed as BOT (Tall) on DBFOT pattern under NIIDP Phase-lll - Permission for laying 10” OD x 0.281” WT MS Natural Gas Pipeline along with 40 MM OFC duct along NH-6 from chainage 4.900 Km. (Remed Chowk) to 44.46 Km, (Bargarh) and 3 Nos. of crossing across chainage 6.8 km. (Near Romad chowk), 12.1 Km. (Near A. Katapali) & 34.475 Km {Near Rengali camp) on NH-6
  • Four laning of Sambalpur Bargarh - Orissa / Chhattisgarh Border Section of NH-06 from Km.0.000 to 88.000 in the State of Orissa to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase-II - Permission for laying 10” OD x 0.281" WT MS Natural Gas Pipeline along with 40 MM OFC duct LHS of the NH-6 and 90 mm MDPE pipeline both side of the NH-6 from chainage 0.000 (Ainthapali Chowk) to chainage 4.900 (Remed chowk) and one crossing 90mm MDPE pipeline at chainage 1.800 and one crossing 10” OD x 0.281" WT MS pipeline and 90 mm MDPE pipeline at chalnage 4.900 on NH-6 Remed chowk
  • Permission of laying of Telecom cable/OFC Cable/ducts crossing of OFC work in Kalyan Singh Railway Crossing (120 km) to Bhati Circle Ratanada Jodhpur (125 km) in Jodhpur SSA in Rajasthan
  • NHAI - RO Hyderabad - PIU Mancherial-Proposal for laying of Optical Fiber Cable by M/s Telangan Fiber Grid Corporation limited for a total length of 105.515 Km, along existing NH-63 by Open trench methodology and across the existing National Highway NH-63 using HDD method on existing Armor - Jagtial- Mancherial section of NH-63 in the State of Telangana
  • Four laning of Sambalpur Bargarh - Orissa / Chhattisgarh Border Section of NH-06 from Km.0.000 to 88.000 in the State of Orissa to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase-IIl - Proposal for Permission for laying of Irrigation Water Supply Pipeline across NH-53 pertaining Gangadhar Meher Lift Irrigation Project, Bijepur
  • Improvement, operation and maintenance including strengthening and widening of existing 2-lane road to 4-lane dual carriageway from Km.9.200 to Km.50.000 of NH-6 (Nagpur- Kondhali section) in the State of Maharashtra on Build, Operate and Transfer (BOT) basis- Proposal for laying of OFC cable through HDD Method, Open Trenching, Clamping and other suitable method from km 9.200 to km 12.800 on RHS on NH-53 by. M/s Voda Idea Telecom Infrastructure Ltd.
  • Permission for laying of 33 KV Electric Line at village Tisgaon, Tal & Dist. Aurangabad (from km 312+296 to km 303+525 & Crossing at Ch. 303+525) on NH-52 (old NH-211)
  • Proposal for permission of Erection/Laying of 33KV HT Line (U/G & O/H) from Km.82.740 (Dharpa Sub-Station) to Km.100.095 (THDCIL Gate) on Ghaziabad - Aligarh Section of NH-91 (New NH-34) in the State of Uttar Pradesh
  • Fresh proposal for change in proposed crossing location of National Highway chainage from km.161.000 to km.160.872 on NH-25 for laying 18 inch dia. LPG Pipeline along with OFC for Kandla-Gorakhpur LPG pipeline project across NH-27 (Jhansi-Orai Section) in Village-Amraukh, Tehsil-Moth, District- Jhansi in the State of Uttar Pradesh
  • Fresh proposal for change in proposed crossing location of National Highway chainage from km.33.540 to km.33.822 on NH-26 (New NH-44) for laying 18 inch dia. LPG Pipeline along with OFC for Kandla-Gorakhpur LPG pipeline project across on NH-26 (New NH-44) (Jhansi-Lalitpur Section) in Village- Mankuwa, Tehsil-Jhansi, District-Jhansi in the State of Uttar Pradesh
  • Improvement, Operation and Maintenance including strengthening and widening of existing 2- lane road to 4 - lane dual carriageway from Km.50.000 to Km. 100.000 of NH-6 (Kondhali -Talegaon Section) in the State of Maharashtra on BOT basis- Permission for laying of 220 KV Karanja (Gh), Sub Station, Hetikundi to 33/11 Kursapar Sub Station Line crossing at km 57.40 on Kondhali - Talegaon section of NH-53 (old NH-6) in the State of Maharashtra
  • Proposal for ROW permission for laying Water supply line parallel to NH-8E near Kobadi Toll Booth by Gujarat Water Infrastructure Limited, from Km 17+180 to Km 19+080 Budhel to Borda Bulk Pipeline Project NC-41, Dist: Bhavnagar on National Highway-8E (New 51) in the state of Gujarat
  • Four Laning of Gadu to Porbandar section of NH-8E (Extn.) in the state of Gujarat Proposal for ROW Permission for laying Water Pipeline along from Km 297+100 to Km 297+700 (600m) and across at Km 297+100 and at Km 297+300 (90m) on Left Hand Side at Village-Kukswada under “NAL SE JAL” Yojna in the state of Gujarat
  • RO - Vijayawada - Permission for laying of OFC Cable using HDD Method on NH-216A crossing at Km.953/600, Km.954/200, KM.957/200, KM. 959/800, Km.960/010, Km.961/600, Km.970/700, Km.971/470, Km.973/000, Km. 974/700, Km.979/300, Km.983/500, Km.985/850, Km.994/060, Km.994/950, Km. 1002/800, Km.1011/960, Km.1012/153 & KM.1013/700 for a total route length of crossing 950 m (Across the road) in Unguturuu, Peravali, Penugonda, Bhimadole, Tadepalligudem, Pentapadu and Tanuku Mandals of old West Godavari District in Andhra Pradesh
  • RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State FiberNet Limited) using HDD Method across the road (Crossing) from LHS to RHS at Km. 393/842, Km.399/668, Km.415/316 and Km.428/600 for a length of 358mts on Chilakaluripet - Vijayawada section of NH-16 under Guntur, Pedakakani & Mangalagiri Mandals of Guntur District, Andhra Pradesh
  • NHAI - RO Hyderabad - PIU Hyderabad-Proposal for laying of Water Pipeline of M/s Andhra Pradesh State Irrigalion Development Corporation Limiled for crossing National Highway NH-65 at Km. 193/059 (RHS to LHS) across National Highway NH-65 by HDD methodology of Hyderabad to Vijayawada section in the State of Telangana
  • Proposal for ROW Permission for laying parallel of Water Supply Pipeline from Km 490+200 to Km 491 +200 on NH-27 in Deesa to Samakhiyali National Highway (Radhanpur and Santalpur Regional Water Project -RAS) in the state of Gujarat
  • Four laning of Dhrol-Bhadra Patiya section of NH-151A (between Ex. Km. 5+700 to Km 13+600 of SH -25) and Bhadra-Patiya section of NH-151A (Between Ex. Km 73+000 to Km. 4+800 and Ex. Km 38+250 to 24+000 of CSH -6) in Gujarat through Public Private Partnership (PPP ) on Hybrid Annuity Mode (Package-II)
  • Six Laning of Start of Kollam Bypass Km. 486.000 to Kadambattukonam (Km. 517.250) section of New NH 66 (Old NH 47) in the State of Kerala on HAM under Bharatmala Pariyojana- Laying of 110 KV XLPE UG Cable and OFC cable through Open trenching and HDD by KSEB from Km.502+800Km.506+000 (RHS) of NH-66(Old NH-47)
  • Proposal for Permission for laying Gas pipeline of 125mm dia.MDPE pipeline by M/s AG&P Gas Pvt.Ltd. along the NH-544DD road from km 0/0 to km 4/200(RHS) of Kalyandurg road for a total length of 4.200kms in Ananthapur District in the State of Andhra Pradesh
  • Proposal for grant of permission for laying OFC between Sirohi TE (715 Km.) to Pindwara TE (Km. 731) total length 16 Km. on Beawar-Pali-Pindwara sec of NH-14 (New NH-62) (LHS) in the state of Rajasthan by BSNL
  • Proposal for grant of permission for laying prosed 12" NB M/s. Steel Gas Pipeline along/across NH-76 (New NH-48) from design Ch. 299+845 to 303+030 (RHS), crossing at Ch. 303+030 and from Ch. 303+030 to 307+055 (LHS) total length 7.270 km to develop City Gas Distribution Network in Udaipur & its surrounding areas under Udaipur G.A. in the state of Rajasthan by M/s. Adani Total Gas Ltd.
  • Proposal for laying of Water supply Pipe Line across the road by HDD Method at Km 285/ 600 - 60m under the providing water supply scheme to 756 rural habitations in Aravakurichi and K.Paramathi Unions in Karur District by the Executive Engineer, Tamilnadu Water Supply and Drainage Board, RWS Division, Karur Approval requested
  • Permission for Erection of 110 KVDC line from Thoppur 110 KV SS to Thoppur Railway Traction SS line across NH-7 of Salem - Dharmapuri in between Km 163/ 300 & 163/ 500 by the Executive Engineer, M/ s Transmission Line Construction , Udayapatty, Salem Approval requested
  • Proposal for permission for laying Optical Fibre cable(OFC) along the NH-167 by M/s Jio Digital Fibre Pvt. Ltd. ,from Km 8/8 to km 56/700 (LHS) of Ananthapuramu -Tadipatri of NH-544 D for a total length of 48,800 mtrs in Anantapur District in the state of Andhra Pradesh
  • Permission for laying of Carbon Steel underground Gas Pipe line across/parallel to NH for providing connectivity to Sanjeev Kumar Yadav CNG Station along NH-19 near Sandalpur, Makkhanpur. District Firozabad (from Ch.15.920 to Ch.15.520 km) in the State of Uttar Pradesh
  • Permission for accommodation of water pipeline having 700 mm dia (with 1200 mm dia casing pipe) for crossing of NH-147 (old NH-8C) @ km 37/870 near Rajpath club by HDD/push through method the state of Gujarat
  • Proposal for permission of underground crossing of 2 Nos, 33 KV, 3 X 300 SQ.mm XLPE insulated Cable by HDD method at Km. 190+780 on NH-530 (Old NH-24) (Moradabad Bareilly Section), at Shahzad Nagar, Tehsil - Sadar & District - Rampur in the State of UP
  • Regarding permission for laying 12 inch dia Natural Gas Pipeline along with two nos. OFC cable near village Lehrabegaga in District Bathinda in the State of Punjab -Pipe line laying across NH-07 at Km. 147.885 by HDD method
  • Proposal for laying pipeline along and across the NH-46 for Rajghat Multi Village Scheme (Guna and Ashoknagar)- Invitation of the Public Comment as per Ministry Guideline dated 22.11.2016
  • ROW permission for laying underground 66 KV electricity cable on Package-2 of Urban Extension Road, NH-344M area
  • Proposal for laying of Natural gas pipeline from Nagpur to Jharsuguda under MNJPL project-Request for granting permission of lay off 18” dia Natural gas pipeline along with 40mm OFC across NH-49 at Km.234.800 (Village-Kunkuni, Taluka-Kharsiya), Km.244.570 (Village-Nawapara, Taluka-Kharsiya), Km.254.696 (Vill-Dhanagar, Taluka-Ragiarh) and Km 266.247 (Village-Daramura, Taluka-Pussor), Distt- Raigarh (CG)
  • Proposal for laying of Natural gas pipeline from Nagpur to Jharsuguda under MNJPL project Request for granting permission of lay off 18” dia Natural gas pipeline along with 40mm OFC across NH-49 at Km 11.700 (Village-Kirari, Taluka-Masturi, Distt- Bilaspur) Km 26.579 (Village-Bhadora, Taluka-Masturi, Distt- Bilaspur), and Km 206.033 (Village-Dondki, Taluka-Sakti, Distt- Janjgir-Champa)
  • Proposal for laying of Natural gas pipeline from Nagpur to Jharsuguda under MNJPL project-Request for granting permission of lay of 18" dia Natural gas pipeline along with 40mm OFC across NH-153 at Km6.410, Village-Sahdeopali, Taluka-Pussore, Distt Raigarh
  • Proposal seeking permission for laying of underground 12" dia steel Gas pipeline along NH-544E (P.Byadigera - Sira section) from Km 103.20 to Km 118.40 LHS and One crossing at Km 118.40 in the State of Karnataka by AGP City gas private limited through open trench/HDD Push Technique Method
  • Permission for laying of 100mm dia (3Cx400sqmm) HT UG Cable on National Highway NH-44 (Bangalore –Hosur section) from Km 16+619 to 18+260 on LHS along the ROW and crossing @ 16+619 from LHS to RHS & 18+260 slip road crossing by HDD method
  • Proposal for overhead crossing of National Highway NH 509 by 220 KV D/D Harduaganj, TPS- Khair (220) Transmission Line at Ch 98.560
  • Laying of OFC cable through Aerial Method along NH-309B from MS 59.000 (Dhayari) to MS 77.000 (Panar), Total Length is 18.000 Km in the state of Uttarakhand
  • Proposal for NOC permission for laying of Water pipeline with road crossing on NH-25 Jhansi-Orai Section at (Ch 1468.200 to 1506.400 Km) approx 30.328 km from lngui khurd to Rath road Orai in the State of Uttar Pradesh