  • Regarding permission from MoRTH for laying and crossing of DI/HDPE pipe line on/along NH-89 (New NH-58) from Ajmer to Merta City for regional water Supply scheme under JJM Block Bherunda, Riya Bri and block merta the merta city District-Nagaur in the State of Rajasthan
  • Regarding permission from MoRTH for laying and crossing of DI/HDPE pipe line/ along NH-89 New NH-58) from Ajmer to Merta City for regional water Supply scheme under JJM Block Bherunda, Riya Bri and block merta the merta city District-Nagaur in the State of Rajasthan
  • Submission of proposal for permission of laying of 11 KV 95 sqm U/G cable across NH-53 (Nagpur Raipur Road) for various locations points under RDSS AG FS Scheme under Sakoli Division of Bhandara Circle
  • Balance work of 4 laning from Fagne to Maha/Gujarat Border section of NH-6 (New NH-53) i.e. km 510.000 to km 650.794 in the State of Maharashtra-Permission for proposal for highway crossing of various 11KV feeder, at various locations, at Dhule to Surat highway Dhule
  • Proposal for granting permission for laying 63/22 mm PE Gas Pipeline in Amreli-District for connectivity PNG, DOM commercial & Industrial potential customer in the vicinity of charged network and MP/LP, PE pipeline for Amreli District (along to Amreli-Lathi bypass road) RHS NH-351-G, 351, 81/991 to Km 82/309 in the State of Gujarat
  • Proposal of permission for laying 63/22 mm dia PE Gas pipeline along the NH-64 from CH. 373/230 to 374/251, 63/22 (LHS) and from CH. 373/230 to 374/476, 63/22(RHS) from Sadak faliya to Pethan village for domestic connection in Pethan village (Left side & Right side Navsari to Karadi road), Taluka & District-Navsari in the State of Gujarat
  • Proposal seeking ROW permission for laying 8” dia steel pipeline across NH-47 at Km 24+165 in Taluka Kathlal, District-Kheda in the State of Gujarat
  • Four Laning of Tarsod to Fagne section of NH-6 from Km. 422.700 to Km. 510.000 in the State of Maharashtra to be executed as Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IVB-Submission of proposal regarding National Highway No.-53 crossing of various three locations under Muktainagar Division
  • Four Laning of Tarsod to Fagne section of NH-53 (Old NH-06) from Km. 422.700 to Km. 510.000 (Package-lIB) in the State of Maharashtra to be executed as Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV- Proposal for grant of permission for crossing of 11 KV XLPE underground cable at Km. 430.030 Jalgaon Bypass section of NH-53
  • Four Laning of Tarsod to Fagne section of NH-6 from Km. 422.700 to Km. 510.000 in the State of Maharashtra to be executed as Hybrid Annuity Mode (DBFOT Annuity) pattern under NHDP Phase-IVB-Submission of proposal for the permission for crossing of 11 KV XLPE cable at various locations National Highway No. 53 of Dharangaon division under RDSS Scheme
  • Four Laning of Tarsod to Fagne section of NH-53 (Old NH-06) from Km. 422.700 to Km. 510.000 (Package-lIB) in the State of Maharashtra to be executed as Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV- Proposal for grant of permission for crossing of 11 KV XLPE underground cable at various locations of NH-53
  • Proposal for Overhead Crossing of 220 KV D/C Modipuram-II (220)-Shamli (400) Transmission line crossing Delhi Dehradun Economic Corridor from Ch. 66+100 towards Ch. 66+110 near village Khanpur, District-Shamli in the State of Uttar Pradesh
  • Proposal for permission for laying of underground duct line and OFC line of P2P network Pvt. Ltd. between 0+000 to 8+360 and 8+360 to 10+300 along NH-09
  • Permission for laying of 8” diameter Natural Gas Pipeline with 40 mm HDPE duct along New NH-143 from RSP Plant side Road (Km.242.866) to Fetcol Petrol Pump (Km.245.140) with two crossings at NH (Km.244.33 & Km.245.140) by Gail India Limited
  • Four Laning of Hospet-Chitradurga section of NH-13 (New NH-50) from km 299+000 to km.418+750 in the State of Karnataka under National Highways Development Project (NHDP) Phase-III on DBFOT (Toll) basis (“Project”)
  • Submission of NH crossing case for construction of 132KV GSS Rajiasar along with 132KV 5/6 Transmission line using 132 KV 400 Sqmm, 1 Spare) between 132 KV GSS Rajiasar and Railway TSS Rajiasar
  • Proposal for grant of permission for laying 125mm dia PE Gas Pipeline from Km. 110.900 to 111.800 (RHS) of total length 900m on Delhi-Jaipur section of NH-48 at Shahjhanpur, District-Jaipur in the State of Rajasthan by M/s. Torrent Gas Jaipur Pvt.Ltd.
  • Proposal seeking ROW permission for underground Crossing of 2 nos. 11KV Electric Cable (185 Sqmm) & 110MM Dia HDPE Pipe across NH-27 at Km 603+070, Village-Khemana, Taluka-Palanpur, District–Banaskantha in the State of Gujarat
  • Proposal for permission for laying of 03 Nos. underground 132 KV EHV cable of M/s Torrent Power Ltd for GMRCL’s at RSS at Indroda park across /along NH-147 at km 13/300 to km 13/400 (crossing) 6.080 (crossing) and km 6.080 to km 6.800 (along) in the State of Gujarat
  • Request for the permission for the laying of underground GAS Pipe Line of M/s Bagpat Green Energy Private Limited for 150 mm Steel Pipeline & 125 mm dia of MDPE Pipe from Ch. 26+458 to Ch. 27+004 LHS is length= 546M, 150MM Steel Pipeline & 125MM Dia of MDPE Pipe from Ch. 27+004 to Ch. 31+600 RHS is length=4.596KM on along & crossing at Ch. 27+004 is length=30m with the Akshardham Eastern Peripheral Expy road, National Highway, New NH-709B (Old SH-57), in the District-Baghpat State of Uttar Pradesh
  • Proposal for overhead crossing for 220KV SC Dahi Chowki Unnao (400)-Ajgain TSS Transmission line on NH-27 at Ch 47.250 to 47.300 near Village Malaon, Unnao in the State of Uttar Pradesh
  • Proposal seeking ROW permission for crossing Water Pipeline at Km 65+860 and at Km 79+770 of NH-47 of Kapadvanj-Lasundra Aug. Water Supply Scheme under NRDWP in the State of Gujarat
  • Proposal of M/s Gujarat Gas Limited for permission for laying 8" dia steel with 125mm PE gas distribution network in Sanand/ Bavla taluka & surrounding area in Ahmedabad district along & across the NH-47 from Sanand bypass to Changodar GIDC (near Moraiya village), Tehshil Sanand / Bavla Distirct-Ahmedabad in the State of Gujarat
  • Proposal for permission of laying underground crossing of 400 KV XLPE insulated Cable between Km. 575–576(Ch. 575.245) across NH-19 (Old NH-2) Fatehpur to Prayagraj Section Village–Ahiran Mahicha, District–Fatehpur in the State of Uttar Pradesh
  • Proposal for Laying of Proposed Water Supply Line from Design CH 8+300 to 9+775 (LHS), Existing CH. 19+000 to 20+475, Total Length=1475.00M falling in Two villages, 1-Village Gehri Butter, Design CH. 8+300 to 8+906 Length 606.00m & 2-Village Sangat Kalan, Design CH. 8+906 to 9+975 Length 869.00m) along the old NH-64(New NH-54), on Bathinda-Dabwali Road, Tehsil-Sangat, District-Bathinda in the State of Punjab
  • Proposal seeking permission to cross 220KV transmission line (160 MW Koppal wind & solar hybrid power generation) at Km between 56.405-56.425, 49.230-49.250 & 40.605-40.625 of NH-367 Bhanapura-Gaddanakeri section in the State of Karnataka
  • Submission of proposal for laying 8-inch underground Natural Gas Pipeline along AH-02 in between km Jitu Bridge at km 0.00 to km 0.900 at Bhanu Nagar Kadamtala & Bhanu Nagar Kadamtala at km 24.400 to Kawakhari More at km 25.900 in Dist- Darjeeling, West Bengal for City Gas Distribution project in Geographical Area (GA-10.47) of Darjeeling District of West Bengal
  • Permission for laying 12" Carbon Steel Gas Pipeline Along/ Across the NH-07 from Malout Bypass from Ch. 35+500 Km to Malout By pass (Karamgarh) Section Ch. 44+400 along LHS Approx 8.900 Km
  • Request for permission for crossing of National Highway-37 at Chainage 537.665 km in between Demow and Moran by 8" (200mm) & 10" (250mm) Gas/ Hydro Carbon Transportation Pipeline between MJF to MRN-109 via MFK at pipeline Chainage 11.126 Km from MFJ
  • Proposal for grant of permission for overhead crossing of 132 KV S/C Shahpura-Jahajpur Transmission line between Km. 116+00 to 117+00 on Gulabpura-Uniayara section of NH-148D at Shahpura City, District-Bhilwara in the State of Rajasthan by RVPNL
  • Proposal for grant of permission for underground crossing of 33 KV 3Cx300 Sqmm Cable (Double Circuit) at Ch. 26.450 and 27.150 on NH-52 (Jaipur-Tonk section) at Chaksu Bypass, Chaksi, District-Jaipur in the State of Rajasthan by JVVNL
  • Permission for laying of 132 KV underground power cable crossing the NH-16 at CRPF square as part of UG cabling work from proposed 132/33 KV GIS Sub-Station, Nayapalli to 132/33 KV GIS Sub-Station, Unit-VIIl
  • ROW Permission for laying OFC along the route from Km. 98.000 to Km. 108.600 (RHS) (Kanpur bypass GWL Road-Kochhabhanwer Interchange) Total Length 10.60 Km. along NH-27 Jhansi Orai Section In District-Jhansi in the State of Uttar Pradesh
  • Permission for laying of proposed 18” Dia Gas Pipeline with OFC along/across NH-709AD along from design ch. 73.680 km to design Ch. 75.850 km (LHS) & across at design Ch. 73.680 km to develop CGD network in Bijnor District in the State of Uttar Pradesh
  • Permission for laying of underground 160mm Dia carrier pipe in 200mm casing steel pipe MDPE Natural Gas Pipeline form Numaligarh Tiniali to Sonaiguri Tea factory along the Km-00 to Km-13 & crossing at Km 00+400 & from sanjeeb tea factory to Beer factory Km-27 to Km-31 & crossing at Km-27 & Km-31 at Golaghat district in the State of Assam through HDD method on NH-129 under Golaghat NH division
  • Permission for laying of underground 160mm Dia carrier pipe along the NH from MS 389 to MS 402+500(Bokakahat Chariali to Numaligarh Tiniali) and 200mm cading steel pope across the NH at MS 393+200 at Golaghat district in the State of Assam through HDD method on NH-715 under Golaghat NH Division
  • Permission for laying of Water Pipeline from Km 156/200 to 156/460 in the RoW portion of Old NH-71 & Road Crossing from Km 30/050 to 30/150 of Renigunta-Naidupeta in the State of Andhra Pradesh
  • Four laning of Panikoili-Rimuli Section of NH-215 from Ch. Km.000 to Km 163.00(Design Chainage Km.0.00 to Km.166.173) in the State of Orissa-Permission for laying DI/ HDPE pipeline across ROW of NH-215 between Ch. Km 65.500 and Ch. Km 105.520
  • Proposal for permission for laying of 11 KV electrical Overhead Line & Underground crossing of M/s Vandana Petroleum along Chakur-Loha section of NH-361 from Ch. Km 186.140 to Ch.Km 187.425(LHS) & Ch.187.425 to Ch.187.880 (RHS), crossing @ Ch. Km 187.425 (Total length-1.74 Km) in the State of Maharashatra
  • Submission of proposal for permission of laying of 11 KV 95 sqm U/G cable across NH-53 (Nagpur Raipur Road) for various locations points under RDSS AG FS Scheme under Scheme under Bhandara Division of Bhandara Circle
  • Permission for laying electric calbe on NH-48 (Old NH-8) along the road at Km. 220.650 to km. 228.250 and across the road at Km. 228.250 total length 7.700 Km. ROW applied in the State of Rajasthan
  • Proposal for laying of proposed 16” dia Multi Product pipeline along the road from Km 32/800 to Km 34/720 (LHS) & across at Km 34/720 (Salem to Kumarapalayam section on NH-544) for a total length of 1920 meters by Open Trench & HDD Method in the limit of NHAI Salem by M/s Bharat Petroleum Corporation Ltd, Coimbatore
  • Application for Underground 33 KV Highway Crossing at near Chainage 184+530 (Chainage corrected by IE as per site inspection) near Choka Chulha Hotel, A.B. Road Myana, Guna in the State of Madhya Pradesh
  • Permission for laying of Underground Optical Fiber Cable (40mm dia HDPE duct pipe) by “M/s Gigatel Solutions Pvt. Ltd” from Km. 23.920 to Km. 24.910 (LHS), on NH-8 (New NH-48), Delhi-Gurgaon Section, Haryana
  • Proposal for laying of 11 KV 300 sqm 3 core XLPE underground HT cable across the NH-361 at chainage in km 491.470 on Nagpur-Wardha section near Sukali village (Bhayar Collage) Th.-Seloo, District-Wardha for existing supply from 33 KV Seldoh Sub-station to 11 KV MEL feeder connection permission required
  • Proposal for grant of permission for laying pipe line 14" Dia Carbon Steel pipe line along with optical fibre cables in HDPE ducts (Sub ducted in 6" CS conduit along with 2 nos. of OFC) across proposed NH-148 NA at proposed NH Chainage km. 27.695 enroute BPCL Terminal, Piyala to Jewar Airport in District-Gautam Buddh Nagar, Uttar Pradesh
  • Proposal for laying of 11 KV 300 sqm 3 core XLPE underground HT cable across the NH-361 at chainage in km 498.520 on Nagpur-Wardha section near Mahabala village Th.-Seloo, District-Wardha for existing supply from 33 KV Seldoh Sub-station to 11 KV MEL feeder connection permission required
  • Proposal for laying of 11 KV 300 sqm 3 core XLPE underground HT cable across the NH-361 at chainage in km 494.810 on Nagpur-Wardha section near Seloo bypass, Th.-Seloo, District-Wardha for existing supply from 33 KV Seldoh Sub-station to 11 KV MEL feeder connection permission required
  • Proposal for laying of 11 KV 300 sqm 3 core XLPE underground HT cable across the NH-361 at chainage in km 506.720 on Nagpur-Wardha section near Khadki village Th. Seloo, District-Wardha for existing supply from 33 KV Seldoh Sub-station to 11 KV MEL feeder connection permission required
  • Proposal for laying of 11 KV 300 sqm 3 core XLPE underground HT cable across the NH-361 at chainage in km 501.590 on Nagpur-Wardha section near Kelzar Bypass (DBL Storage) Th. Seloo, District-Wardha for existing supply from 33 KV Seldoh Sub-station to 11 KV MEL feeder connection permission required
  • Proposal for laying of 11 KV 300 sqm 3 core XLPE underground HT cable across the NH-361 at chainage in km 496.390 on Nagpur-Wardha section near Kotamba Phata, Th. Seloo, District-Wardha f or existing supply from 33 KV Seldoh Sub-station to 11 KV MEL Gawthan feeder connection permission required
  • Proposal for laying of 11 KV 300 sqm 3 core XLPE underground HT cable across the NH-361 at chainage in km 480.500 on Nagpur-Wardha section near Wardha City Th. Wardha District-Wardha for existing supply from 11 KV Wardha Sub-station to 11 KV Mahakal feeder connection permission required
  • Permission for crossing of 220 KV SMDC line from 400 KVSS Hindupur to the proposed 220 KVSS Penukonda across NH-44 (Hyderabad to Bangalore) near Vadigepalli (Village), Gorantla (Mandal), Sri Satya Sai (district) in the State of Andhra Pradesh
  • Permission for laying of underground 12” dia. (305mm) Steel gas pipeline along NH-44 from Km 414.700 to Km 431.900 for the length of 17200 mts and 02 nos. of 18” dia (458 mm) dia steel crossing (120 mts) totaling to 17320 mts across NH-44 by M/s. AG&P Gas Pvt. Ltd., in the State of Andhra Pradesh
  • Proposal for permission for laying of underground 304.8 mm dia carbon steel pipeline by M/s Haryana City Gas (KCE) Pvt. Ltd. from km. 391+460 to km. 393+230 (LHS) on NH-352 (Old NH-71) District-Rewari (HR)
  • Grant of No Objection Certificate for erecting of HT Electrical Poles (33 KV line over proposed 12.5 spun poles) along the National Highways at the edge of ROW/ Utility corridor from Km.840.825 to Km.842.000 (RHS), 1175 mts length at Sy. No. 4/3, 4/2, 3/2, Vajrapukoderu Road, Kathipudi Village, Kakinada District
  • Proposal for grant of permission for laying of pipeline 14" Dia Carbon Steel pipeline along with optical fiber cables in HDPE ducts (subducted in 6" CS conduit along with 2 nos. of OFC) across proposed NH-148NA at proposed NH chainage km 27.695 enroute BPCL Teminal, Piyala to Jewar Airport in District-Gautam Buddh Nagar, Uttar Pradesh
  • NHAI, PIU, Coimbatore-for laying of underground Optical Fiber Cable (OFC) along the NH-544 (Chengapalli to Walayar Section) from km 120/070 to km 120/470 (LHS), km 129/200 to km 129/615(LHS), km:129/620 to km 130/890 (LHS), km 132/300 to km 132/615 (LHS), km 132/620 to km 133/655 (LHS), km 135/420 to km 135/860 (RHS), km 136/230 to km.136/330 (RHS) km. 137/850 to km 138/045 (LHS), km 138/055 to km 139/615 (LHS), km: 178/900 to km 180/272 (LHS) and across @ km 133/655, km 133/675, km 135/860, km 138/000, km.138/215, km 135/615, km 178/900, km.180/272 of NH-544 in the limits of National Highways Authority of India, Coimbatore
  • Proposal is regarding permission sought by Kerala Water Authority for laying of underground water supply pipelines as part of ‘Jal Jeevan Mission’ along/across the National Highways stretches in the subject project locations under NHAI in the State of Kerala
  • Permission for underground crossing for 33KV line for change of feeding source of 33 KV S/Stn. Gursar from Km 31+775 (RHS) to Km 31+725 (LHS) through HDD Method on NH-65 (New NH-52) Kaithal to Rajasthan Border Section at village Narwana, District-Jind in the State of Haryana
  • Proposal of M/s Sardar Sarovar Narmada Nigam Limited for Permission for crossing of NH 68 at Ch. 366/150 by constructing new box structure in place of branch of canal portion for water supply purpose near Village-Suigam, Tehsil-Suigam, District-Banaskantha, Gujarat
  • Balance work of two lane with paved shoulder of Bhopal-Sanchi section from Km 0.00 to 53.775 of NH-86 Extn. on EPC mode under NHDP Phase-III in the State of Madhya Pradesh - Proposal for permission of direction board of SAM Global University
  • Four laning of Jorabat Shillong (Barapani) section of NH-40 from 0.000 to Km 61.800 in the state of Assam and Meghalaya on DBFOT pattern under SARDP-NE in BOT (Annuity)
  • Proposal seeking ROW permission for laying of 2 Nos of 11 KV 3CX185 sq.mm XLPE cable underground highway crossing line at km 366+240, near Narvai Mataji Mandir, LS No. 1880/P2, Village-Gosa for new LT NRGP connection of M/s. Adani Total Gas Ltd load 70.00 KW in Porbandar to Somnath Highway section of NH-51 under Coastal Sub-Division in the State of Gujarat
  • Proposal for laying water pipeline on NH-347C Nimrani-2 multi village scheme, District-Khargone, MP under MPJNM in the State of Madhya Pradesh
  • Proposal for laying water pipeline on NH-752B Jirapur-Susner-Dug section along NH from Ch.39+320 to 42+250 (Total tength 2930m) and 06 crossings at Ch. 35+750, 39+320, 47+740,51+300, 57+500 and 63+500 at different location in Agar Nalwa district (Mana, Modi, Nandna, Susner, piplia, Nankar, palda) by pushing method (Trench less method) in the State of Madhya Pradesh
  • Permission for laying of 8" OD x 0.281" WT MS Natural Gas Pipeline along NH-53 from Km.72+350 to Km.70+694 (from Udaybhata village to Chunabelari village), 6” OD x 0.281" WE MS Natural Gas Pipeline along with 40 mm OFC duet along NH-53 from Km.33+900 to Km.33+450 (near Kasoti village) and crossing at Km.33+900 (near Kasoti village) and Km.74+804 (at IFFCO gate)
  • Permission for laying of 10" OD x 0.251" WT CS Natural Gas Pipeline along with 400mm OFC duct along from chainage 62+000 to Km.46+700 (from Chandikhole Chhak to Chhatiya, Jajpur) and across at Km.55+500 (Near Dolphin Petrol Pump) & Km.61+235 (Near-Chandikhole Chhak) on NH-16
  • Proposal From MSEDCL for crossing of 11 KV underground cable line across NH-60 at Km. 163/500, Km. 164/600, Km. 166/600, Km.172/500 & Km. 180/800 Total 5 Crossings on NH-60
  • Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Malout Bypass from Ch. 35+500 Km to Malout Bypass (Karamgarh) Section CH. 44+400 along LHS approx. 8.900 Km.
  • Proposal for requesting permission for laying water pipeline across at km. 152/800 at Village-Nimgaon Bhojapur, Tal. Sangamner, District-Ahmednagar on NH-60
  • Proposal for requesting permission for laying water pipeline across at Km. 152/800 at Village-Nimgaon Bhojapur, Tal.-Sangamner, District-Ahmednagar on NH-60
  • Proposal for requesting permission for erection of 11 KV underground cables/over headline for road crossing from Km. 65/57 (Om Sai Motors) to Km. 65/58 (Near Kakade House) on NH-65
  • Proposal for requesting permission for erection of 11 KV underground cables/over headline for road crossing from Km. 65/62 (Near IOCL Pump) to Km. 65/63 (Hotel 7/12) on NH-65
  • Proposal for requesting permission for erection of 11 KV underground cables/ over headline for road crossing from Km. 65/51 (Hotel Hindavi) to Km. 65/52 (Hotel Hindavi) & Km. 65/53 (Hotel Hindavi) to Km. 65/53 (Swastik Cement Sheet Factory) on NH-65
  • Proposal for requesting permission for erection of 11 KV underground cables/over headline for road crossing from Km. 65/65 (Near Birobawadi Village) to Km. 65/66 (Hotel Shripalace) & Km. 65/67 (Near-Birobawadi Village) to Km. 65/68 (Open Land ) on NH-65
  • Proposal for requesting permission for erection of 11 KV underground cables/ over headline for road crossing from Km. 65/69 (Near 132 KV HT Towers) to Km. 65/70 (Sai Business Centre), Km. 65/72 (Near-Hotel Aai Saheb) to Km. 65/73 (Open Land), Km. 65/75 (Near-Hotel Shiv Prashad) to Km. 65/76 (Open Land) & Km. 65/75 (IOCL KAT Pump) to Km. 65/76 (Kurkumbh Village Land) on NH-65
  • Permission for laying of Telecom Ducts/ Cables (40 mm dia HDPE duct pipe) by “Tata Communications Limited” from route Km. 15+725 to Km. 17+330 (RHS) on National Highway No.-8
  • Permission for laying of Telecom Ducts/ Cables (40 mm dia HDPE duct pipe) by “Tata Communications Limited” from route Km. 18+300 to Km. 20+200 (RHS) on National Highway No.-8
  • Proposal for laying of Natural Gas Pipeline by M/s Megha City Gas Distributors Private Limited for a length of 7,863 m along National Highway of NH-163 from Km. 26+557 to Km. 34+300 (LHS) by Open trench Methodology and across NH-163 at Km.30+473 & Km.34+300 by HDD Methodology on Hyderabad to Bhupalapatnam section of NH-163 in the State of Telangana
  • Proposal for permission for laying of underground Duct Line and OFC Line of P2P Network Pvt. Ltd. between 0+000 to 8+360 and 8+360 to 10+300 atong NH-09
  • Permission for laying of Underground Optical Fiber Cable (40mm dia HDPE duct pipe) by "M/s Gigatel Solutions Pvt. Ltd" from Km.23.920 to Km.24.910 (LHS), on NH-8 (New NH- 48), Delhi-Gurgaon Section, Haryana
  • Proposal for erection of overhead 33 KV line/ UG Cable crossing at Km.123/1 to Km. 123/2 and Km. 124/1 to Km. 124/2 near Loni Devkar Village across NH-65
  • Proposal for grant of permission for laying PE Gas Pipeline from Bapdev Maharaj Bridge, Kiwale at Km. 862/150 in RHS towards Pune to Hanuman Temple, Kiwale at Km.860/930 in LHS towards Pune and crossing near Shell Petroleum Kiwale at Km. 861/700, Tal. -Haveli, District-Pune (Total Length -1180 meters) along/across NH-48
  • Upgradation of Alandi-Pandharpur Sant Dnyaneshwar Palkhi Marg NH-965- 4 laning of existing 2 lane stretch from Dharmapuri to Lonanad at Km. 117/000 to 166/400 (Pkg-IV) on Mohol-Alandi section (Design length-49.400 Km.) in the State of Maharashtra on EPC mode-Proposal for requesting permission for crossing of 765 KV D/C Narendra GIS to Pune GIS T/L at Km.132/607 across NH-965
  • Proposal for electrical line crossing of 765 KV D/C Narendra GIS to Pune GIS T/L at Km. 40/745 across NH-65
  • Project Management Consultancy Services for Construction of Double Tier Elevated Highway Corridor including provision for metro section from Pune to Shirur of NH-753F from Km. 0.00 to Km 56.000 (total length Km. 56.000) in the State of Maharashtra-Proposal for electrical line crossing of 765 KV D/C Narendra GIS to Pune GIS T/L at Km. 38/181 across NH-753F
  • Proposal for requesting permission for laying at Km. 54/950 to Km. 55/250 BHS for a length of 600 meters and Crossing at Km.54/950 by HDD method along/ across NH-65