Sorry, you need to enable JavaScript to visit this website.

You are here

  • Proposal for Crossing of 800 KV HVDC Raigarh – Pugaluroverhead power line at chainage167.700 km near KG Satram Village of Shantipuram – Nalagampalli Section of NH-4
  • Proposal for crossing of NH-31 for Construction of 400 KV DC Alipur-Siliguri transmission line at km.669 to 670
  • Public Comments for M/s Shree Agarsan Trust Bhiwani at KM-113.923 (LHS) on NH-709E at Rohtak Bhiwani Road Village Paluwas Bhiwani in the State of Haryana
  • Proposal for Crossing of 800 KV HVDC Raigarh – Pugaluroverhead power line at chainage167.700 km near KG Satram Village of Shantipuram – Nalagampalli Section of NH-4
  • Proposal for crossing of NH-31 for Construction of 400 KV DC Alipur-Siliguri transmission line at km.669 to 670
  • Permission for laying of 33KV Transmission Line by UHBVN on Connecting link of NH-9 (Old NH-10) and NH-352 (Old NH-71) km 0.1 to km 9.1
  • Proposal for permission for laying 11 KV UG Cable by Kerala State Electricity Board Ltd from Km.6/385 to 7/035 of Thiruvananthapuram bypass on NH-66 (Old NH-47) under NHAI in the state of Kerala
  • Submission of NH Crossing case of 220 KV Kishangarh TSS (DFCCIL) over head line at NH-8 between chainage no. 03-04 near village Sawatsar Kishangarh Distt. Ajmer in the state of Rajasthan
  • Proposal for laying permission of 33KV DC line to TSIIC Chandavelly Industrial Park along the NHAI Road at Kanakmamidi Village from TSPDCL along NH-163 from km 27.300 to 29.500 in the State of Telangana
  • M/s Freedom Footwear Pvt. Ltd. At KM-42.300 (LHS) on NH-10(09) at Village Kasar Tehsil Bahadurgarh Distt - Jhajjar in The State of Haryana
  • Proposal for provisional NOC for access permission to the proposed retail outlet of M/s Indian Oil Corporation Limited on NH-28 (New NH No.27) in Km. 25 (Ch.24.891, RHS) Village – Darapur, Tehsil - Nawabganj & District – Barabanki in the State of Uttar Pr
  • Proposal for final formal permission and signing of license deed for access to the fuel station of M/s Essar Oil Limited in Km. 78 (Ch. 77.013, LHS) on NH-330 (Old NH-96) at Village - Pakri, Tehsil - Sadar & District - Sultanpur in the State of Uttar Prad
  • Final Access Permission of Fuel Station of M/s HPCL on NH-02(44) at Km 82.265 (RHS) at Village Banchar Tehsil-Hodal & Distt. Palwal Haryana State
  • Access Permission of M/s Nayara Energy Limited Formerly Essar Oil Ltd.) KM 47.850(LHS) (NEW Km 225.400) of Jhajjar-Loharu Section NH-334B at Village Gagarwas Loharu Rewari Distt. Haryana
  • Public Comments for ROL of M/s IOCL at km. 342.667 to 342.702 on NH8 at village - Kagdar district - Udaipur
  • Public Comments for ROL of M/s IOCL at km. 346/186 to 326/224 on NH-8 at village - Nichla Fala district Udaipur in the state of Rajasthan
  • Permission of laying 30 inch dia casing pipeline for 24 inch dia carrier Gas Pipeline on NH-41 at ch.15.333 by GAIL(India) Ltd.
  • Permission of laying 30 inch dia casing pipeline for 24 inch dia carrier Gas Pipeline on NH-41 at ch.43.820 by GAIL(India) Ltd.
  • Permission for laying ash & water Pipeline by Horizontal Directional Drilling (HDD)/Pipe Jack Method by crossing NH-49 at chainage- 276.50km between Jharsuguda and Kuchinda in the district of Jharsuguda
  • Permission for laying and crossing water supply pipe line Amrut yojna jalgaon NH-06
  • Permission for laying underground 150mm dia PVC pipeline NH-83 from Km 32/150 to 35/130(LHS) of Coimbatore-Karur-Tiruchirapalli-Nagapattinam road, at Thippampatty Village, Pollachi Taluk and Coimbatore district in the State of Tamil Nadu
  • Permission Proposal for laying of water supply pipe line along the NH from Km 25/010 to Km 25/780 (RHS) and Km 26/100 to Km 27/580 (RHS) of (Oddanchatram Bypass) of NH 209 in the State of Tamil Nadu
  • Proposal for permission to lay underground water supply pipeline by Kerala water Authority on NH-544 between Km.280/570 and Km.280/950 (Thrissur to Angamali Section) under NHAI in the State of Kerala
  • DI Pipeline of 600mm I/d rising of 15 MLD STP Jind town of Kalwa-Kiana drain on Rohtak-Jind Section of NH-71 (NEW NH-352) Between Km 307.000 to Km. 309.972
  • Laying of pipe line along NH-62 National Highway crossing with one crossing & both side along NH-62 under RUIDP Ph-III contract package No. RUSDP/PALI/01 in the state of Rajasthan
  • Laying of pipe line along NH-62 National Highway crossing with one crossing & both side along NH-62 under RUIDP Ph-III contract package No. RUSDP/PALI/01 in the state of Rajasthan
  • EPC of MGR Railway line and water pipeline from IB Thermal Power Station to Manoharpur coal block for invitation of public comments
  • Pipeline and OFC km.1.880 of NH80
  • Laying of pipe line on NH-27 Mile Stone between 1139+769 to 1147 and road crossing at two places on chainage 1140+770 in ROW and road crossing in the state of Rajasthan
  • Laying of pipe line on NH-27 Mile Stone between 1139+769 to 1147 and road crossing at two places on chainage 1140+770 in ROW and road crossing in the state of Rajasthan
  • Crossing of OCPL pipeline through NH-49 at km 249.272
  • Permission Proposal for laying underground Optical fiber cable along the NH from Km 214/800 - Km 220/900 (RHS), (Madurai- Tuticorin section) of NH 45B in the State of Tamil Nadu
  • Permission Proposal for laying underground Optical fiber cable along the NH from Km 225/100 to Km 246/150 RHS and across at Km 235/100, Km 240/000 (Trichy - Padalur section) of NH-45 in the State of Tamil Nadu
  • Permission Proposal for laying R-LNG Pipe underground Optical fiber cable along the NH across Km 214.065 (Trichy – Madurai section) of NH-45 in the State of Tamil Nadu
  • Permission for areal installation of OFC from MS-696.580 to 698.620, 707.000 to 712.800, 722.500 to 725.940, 729.640 to 742.900 and 747.640 to 749.300 LHS side total length in 26.200 of NH-27 (Pindwara-udaipur section), ROW applied in the state of Rajasth
  • Proposal for Granting of Permission for laying OFC along route Km 117.950 to 159.00 (RHS) of NH-54 in the state of Punjab
  • OFC from Km. 396.400 to Km 417.018 (RHS) from Km 417.108 to km 433.982 and 2 nos. crossing at km 417.108 7 km 433.982 on NH-71 By BSNL
  • Proposal for laying optical fiber cable at NH-58 from Sukher Police Station Udaipur (Lat 24.6412 Long 73.71512) to Nathdwara Sukhadia Nagar Road (Lat 24.917427 Long 73.823898) Total-36000 Mtr (as per enclosed SLD)
  • Proposal for NOC permission for laying of optical fiber cable along the route from Km. 0.00 to Km. 27.00 on NH-232A (New NH-31) in the State of Uttar Pradesh
  • Public Comments for OFC on NH-148D from MS. 158.500 to 201.500 Dhakni-Peeplond in the State of Rajasthan
  • Public Comments for OFC along and across NH-325 at various locations from km. 118+900 to 133+180 on Ahore to Takhatgarh section of NH-325 under work of Narmada FR cluster water project in the State of Rajasthan
  • Granting of ROW permission for laying of telecom cables OFC ducts on NH from Km. 66/000 to 106/200 & Km. 129.460 to Km. 133. 920 of NH-16 (Old NH-5) & Road Crossings at Km. 66.000, etc.
  • OFC Jaipur - Kishangarh route
  • Permission for laying OFC from Km. 397/100 to Km.400/700 in Guntur District Andhra Pradesh for a length of 3600 mts along Chilakaluripet – Vijayawada section of NH-16 by M/s. Reliance Jio Infocom Ltd., Guntur
  • Proposal for laying underground Optical fiber cable along the NH from Km 246/400 - Km 253/950, etc. (Madurai- Tuticorin section) of NH 45B in the State of Tamil Nadu
  • Permission for laying of drainage outlet to Kanjia Nallah to CBC Sakhigopal Campus (Km. 43.400 to Km. 44.000) along the side of NB- 316 (RHS) by Rural Works Division, Puri