Sorry, you need to enable JavaScript to visit this website.
E.g., 17-09-2025
E.g., 17-09-2025
Circulars / Notifications related to National Highways
(Notifications include O.M.s, Circulars, Office Orders, Advisories, etc.)
S. No. Subject Date
291 Report sought by National Human Rights Commission regarding adherence to Ministrys and IRC: 103 “Guidelines for pedestrian facility” for persons with Disabilities, letter to NHAI dated 25.06.2019 (7.09 Mb application-pdf)
25-06-2019
292 SOP for the provision of falseworks (or scaffolding or temporary structures) as required for safe construction of any permanent concrete/steel structures on National Highways in the country (181.41 Kb application-pdf)
20-06-2019
293 SOP for the provision of false works (or scaffolding or temporary structures) as required for safe construction of any permanent concrete/steel structures on National Highways in the country, circular dated 20.06.2019  (181.41 Kb application-pdf)
20-06-2019
294 Principles to be adopted while considering the highway near or within wildlife sanctuaries/National Parks/Animal Corridor, circular dated 29.05.2019 (880.46 Kb application-pdf)
29-05-2019
295 CVC instructions relating to use of official email id for tender related communications and mechanism for online submission/verification of bid documents, OM dated 27/05/2019  (368.33 Kb application-pdf)
27-05-2019
296 Deployment of key personnel of various consultancy assignments inter - alia during feasibility/DPR (753.73 Kb application-pdf)
04-04-2019
297 Circulation of Revised formats of EFC PIB Memorandum for Original Cost Estimates OCE and revised Cost Estimates RCE-31.03.2014 (406.74 Kb application-pdf)
31-03-2019
298 Issue of Completion Certificate for NH works taken up under EPC mode, circular dated 22.03.2019 (666.77 Kb application-pdf)
22-03-2019
299 Selection of Authoritys Engineer for works to be implemented on EPC mode, circular dated 15.03.2019 (588.15 Kb application-pdf)
15-03-2019
300 Guiding Principles for Resolution of stuck National Highway Projects, OM dated 09.03.2019 (491.08 Kb application-pdf)
09-03-2019

Pages