Sorry, you need to enable JavaScript to visit this website.
E.g., 18-07-2025
E.g., 18-07-2025
Circulars / Notifications related to National Highways
(Notifications include O.M.s, Circulars, Office Orders, Advisories, etc.)
S. No. Subject Date
261 Fixation for revised timeline for e-tendering for Strengthening/lRQP/PR works (850.03 Kb application-pdf)
31-01-2020
262 Bidding of "Construction of New 4-lane Bridge with its approaches from km 0/0 to km 14/500 across river Ganga on NH-19 at patna in the state of Bihar on EPC mode"- opening of technical bid by the Evaluation Committee (840.56 Kb application-pdf)
03-01-2020
263 Authorising National Highways Authority of India(NHAI) to set up infrastructure investment trusts and monetise completed and operational national highway projects (391.99 Kb application-pdf)
01-01-2020
264 Guidelines for providing type of Median on National Highways Network; and (B) Guidelines for Metal crash barrier (Semi Rigid) to be installed on National Highways (4.19 Mb application-pdf)
01-01-2020
265 Utilization of Utility Ducts along the National Highwayas in Urban Areas (599.11 Kb application-pdf)
27-12-2019
266 Conciliation & Settlement Mechanism for Contractual Disputes in Contract Agreements with the Contractors/ Concessionaires/ Consultants in respect of Ministry's Projects - Panel of Independent Experts and constitution of conciliation committee (2.18 Mb application-pdf)
18-12-2019
267 Construction of New 4- lane Bridge(Parallel to the Existing MG Setu) with its approaches from km 0/0 to km 14/500 across river Ganga on NH-19 at patna in the state of EPC mode- Metting with the Intending Bidders (555.99 Kb application-pdf)
26-11-2019
268 Use of waste Plastic in Hot Bituminous Mixes in wearing courses (dry process) for construction of National Highways (827.87 Kb application-pdf)
26-11-2019
269 Policy Guidelines on surveying with network survey vehicle (NSV) for all the projects involving development of 2/4/6/8- lane, Expressway, Strengthning (1.61 Mb application-pdf)
13-11-2019
270 Interest Bearing working Capital Advance against unbiled executed work to mitigate the cash flow problems of HAM Concessionaire &EPC contractors and modification in Schedule- H of the EPC Contract (2.30 Mb application-pdf)
09-11-2019

Pages