Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
191 Jammu & Kashmir Request for RoW permission for laying Ariel OFC stretch from Nashri-Chanderkote 5048 Link. MoRTH NOC portal application ref. no. 20250206/1/3/27816/14449 (396.60 Kb application-pdf)
26-09-2025
192 Tamil Nadu Proposal for erection of 33KV OHT line with 2 Nos. of Baby Tower across the road @ Km 297/200 of NH-38(Trichy-Padalur section) by M/s Sivasakthi Agro Farms, Tiruppur (14.41 Mb application-pdf)
25-09-2025
193 Gujarat Regarding submission of proposal to issue NOC for crossing/ parallel laying of 66KV LILO line to proposed 66KV Amran substation - crossing/parallel to NH-151A at Ch. 45.790 and parallel between ch. 45.570 to 45.790 km near Village-Amran, Tal. & District-Morbi (482.44 Kb application-pdf)
25-09-2025
194 Gujarat Application for the permission of laying proposed underground water pipeline across National Highway-27 for providing basis utility service by HDD method crossing at Ch. 102+810 km 200MM dia DI carrying (400mm dia MS casing) at village-Mota Gundala, Taluka-Jetpur, District-Rajkot (415.44 Kb application-pdf)
25-09-2025
195 West Bengal Proposal of PHE Dte, Govt. of West Bengal regarding ROW permission for laying water pipeline along NH-14(Old NH-60) from Chowringahee More at km 115.250 to Makatpur at 118.090(RHS) & across NH at km 115.975, km 116.950 & 117.373 in Satkui PWSS under Kharagpur Sub-Division of Midnapore Division, PHE Dte, in the State of West Bengal" (98.99 Kb application-pdf)
25-09-2025
196 Maharashtra Dhule Municipal Corporation, Dhule’s Proposal for Laying of Sewer Pipeline (Total Length–5.391 Km) along NH-3 & 01 no. of Crossing across NH-3 (103.25 Kb application-pdf)
25-09-2025
197 Maharashtra Proposal for Laying of Water Supply Pipeline from Km. 264.490 to Km. 265.010 on RHS (Length 520m) along NH-3 in the State of Maharashtra (459.44 Kb application-pdf)
25-09-2025
198 Uttar Pradesh Application for Right of Way (ROW) permission of six crossing locations along NH-21 (Bareilly-Badaun Road) and laying from Ansari Dharam Kantha near Bhamora to off Aadarsh Inter Collage, Devchara under the Special Project category far Bharat Net Implementation (892.42 Kb application-pdf)
24-09-2025
199 Uttar Pradesh Permission for Laying of 8-inch (203.200 mm) Carbon steel pipeline with OFC along NH-30, RHS from Sitapur Ch. 419+590 Kms to Ataria Shiv Filing Station Ch. 467+630 on LHS and crossing at Ch. 420+100 approximately length 48.100 kms. (3.56 Mb application-pdf)
24-09-2025
200 Madhya Pradesh Proposal for permission for laying of water pipeline along & across the road from Ch.61+800 km to 62.250 km, Ch 80+490 km to 82+600km (LHS) and Ch. 81+300 km to 81+705 km (RHS) on NH-347 Indore-Deshgaon section and 2 No’s Crossing at Ch km 62+250 & 81+300 by pushing (HDD /trenchless method) under Indrasagar-1 Multi village Drinking water Supply scheme Khandwa & Khargone District (2.39 Mb application-pdf)
24-09-2025

Pages