Sorry, you need to enable JavaScript to visit this website.

You are here

  • Laying of underground R-LNG pipe line along with OFC cable across NH 234 at Km 496.342 by M/s. Indian Oil Corporation ltd. by HDD method
  • Proposal for construction of an approach for an existing retail outlet of IOCL at Km.307.601 (307.583-307.618) (LHS) abutting on Jagdalpur-Dhanpunji road Section on (Old NH-43 & New NH-30) Village Markel, Tehsil-Jagdalpur, Distt-Bastar Chhattisgarh
  • Permission for laying of underground R-LNG Gas pipeline along with OFC Cable across NH 207 at Km 17.683, Km 22.476 & Km 35.248 by M/s Indian Oil Corporation Ltd through HDD Method
  • Permission for water pipeline across NH-27 in the state of Gujarat
  • Proposal for access permission for approach roads at Km 34/765 to 34/800 (RHS) of NH-63 (Old NH-43) to the proposed retail outlet of M/s HPCL at Mouza- Kosaguda, Tahasil- Boriguda, Dist- Koraput in the state of Odisha
  • Permission for construction of 132 KV transmission line from MPPTCL 220 KV Rajgarh substation to Biaora TSS for Railway electrification works of Maksi – Vijaypura section of west central railway, Bhopal in the State of Madhya Pradesh
  • Permission for laying of OFC on NH-08 from ch. 131.850 to ch. 134.580 for a length 2730 mtr. from ch. 131.170 to ch. 132.020 ch. 133.440 to ch. 133.620 total section of ROW applied for 3760 Mtr. & 02 crossing in the state of Rajasthan
  • Proposal for NOC for overhead crossing of 400 KV Quad Moose NTPC Tanda - Basti transmission line on NH-28 between Km. 173.00 to Km. 174.00 at Km.173.625, near Village – Bahar, District - Basti in the State of Uttar Pradesh
  • Proposal for NOC for overhead crossing of 400 KV Twin Moose Gorakhpur - Lucknow transmission line on NH-28 between Km. 172.00 to Km. 173.00 at Km.172.590, near Village – Harriya, District - Basti in the State of Uttar Pradesh
  • Proposal for NOC for overhead crossing of 400 KV Twin Moose Gorakhpur - Lucknow transmission line on NH-28 between Km. 166.00 to Km. 167.00 at Km.166.625, near Village – Harriya, District - Basti in the State of Uttar Pradesh
  • Permission for laying underground water pipeline across the Road Km 43/980 of NH-7A (New NH-138) of Tuticorin-Tirunelveli Section in the State of Tamil Nadu
  • Permission for construction of Strom water drain along the National Highways from Km 2/440 to 6/130(LHS) of Tuticorin-Tirunelveli road of NH-7A (New NH-138) at Thoothukudi City Municipal Corporation in the State of Tamil Nadu
  • Permission for construction of Strom water drain along the National Highways from Km 257/000 to Km 260/000(RHS) of Madurai-Aruppukottai-Tuticorin road of NH-45B at Thoothukudi City Municipal Corporation in the State of Tamil Nadu
  • Proposal for Conversion of Over Headlines to underground power cable along the NH-67 from Km 000/000 to Km 1/400 on LHS (Total Length 1400Mts) on Nagapattinam- Thanjavur section of Velankanni Town, Nagapattinam District in the State of Tamil Nadu
  • Proposal for laying of Ennnore-Thiruvallur-Bengaluru-Pondicherry-Nagapattinam- Madurai -Tuticorin R-LNG pipeline along with underground Optical Cable the NH across at Chainage Km 20/500 of NH- 45A of Azhiyur Village Viluppuram Taluk and Viluppuram Distric
  • Permission for laying of OFC on NH-44 by M/s. ECIL from Km.472/800 to Km.475+680 along NH road and road crossing at Km.472+800 using existing ducts in the State of Telangana
  • Grant for NOC for crossing of water pipeline through NH division road (NH - 333A) for 2X800 MW USCTPP, Motiya
  • Proposal for Final NOC for construction of new retail outlet (Fuel Station) at Village kaliarkhal, Rev.circle Chapar, P.O Tilapara, P.S:Chapar, district Dhubri (Assam)- 783348 on the right hand side of NH-31 in chainage 904.772Km
  • Laying of underground R-LNG pipe line along with OFC cable across NH 234 at Km 496.342 by M/s. Indian Oil Corporation ltd. by HDD method
  • Proposal for construction of an approach for an existing retail outlet of IOCL at Km.307.601 (307.583-307.618) (LHS) abutting on Jagdalpur-Dhanpunji road Section on (Old NH-43 & New NH-30) Village Markel, Tehsil-Jagdalpur, Distt-Bastar Chhattisgarh
  • Permission for laying of underground R-LNG Gas pipeline along with OFC Cable across NH 207 at Km 17.683, Km 22.476 & Km 35.248 by M/s Indian Oil Corporation Ltd through HDD Method
  • Permission for laying of OFC on NH-08 from ch. 131.850 to ch. 134.580 for a length 2730 mtr. from ch. 131.170 to ch. 132.020 ch. 133.440 to ch. 133.620 total section of ROW applied for 3760 Mtr. & 02 crossing in the state of Rajasthan
  • Proposal for NOC for overhead crossing of 400 KV Quad Moose NTPC Tanda - Basti transmission line on NH-28 between Km. 173.00 to Km. 174.00 at Km.173.625, near Village – Bahar, District - Basti in the State of Uttar Pradesh
  • Proposal for NOC for overhead crossing of 400 KV Twin Moose Gorakhpur - Lucknow transmission line on NH-28 between Km. 172.00 to Km. 173.00 at Km.172.590, near Village – Harriya, District - Basti in the State of Uttar Pradesh
  • Proposal for NOC for overhead crossing of 400 KV Twin Moose Gorakhpur - Lucknow transmission line on NH-28 between Km. 166.00 to Km. 167.00 at Km.166.625, near Village – Harriya, District - Basti in the State of Uttar Pradesh
  • Permission for laying underground water pipeline across the Road Km 43/980 of NH-7A (New NH-138) of Tuticorin-Tirunelveli Section in the State of Tamil Nadu
  • Permission for construction of Strom water drain along the National Highways from Km 2/440 to 6/130(LHS) of Tuticorin-Tirunelveli road of NH-7A (New NH-138) at Thoothukudi City Municipal Corporation in the State of Tamil Nadu
  • Permission for construction of Strom water drain along the National Highways from Km 257/000 to Km 260/000(RHS) of Madurai-Aruppukottai-Tuticorin road of NH-45B at Thoothukudi City Municipal Corporation in the State of Tamil Nadu
  • Proposal for Conversion of Over Headlines to underground power cable along the NH-67 from Km 000/000 to Km 1/400 on LHS (Total Length 1400Mts) on Nagapattinam- Thanjavur section of Velankanni Town, Nagapattinam District in the State of Tamil Nadu
  • Proposal for laying of Ennnore-Thiruvallur-Bengaluru-Pondicherry-Nagapattinam- Madurai -Tuticorin R-LNG pipeline along with underground Optical Cable the NH across at Chainage Km 20/500 of NH- 45A of Azhiyur Village Viluppuram Taluk and Viluppuram Distric
  • Permission for laying of pipeline & OFC across NH-709 at km 23.690 at village Chidana, Tehsil-Gohana, Distric Sonipat in the State of Haryana
  • Proposal for permission of laying of storm water sewer line under Amrut project on Bhiwani-Jind road from km 2.235 to 6.760 of NH-709A in distric Bhiwani in the state
  • Regarding approval for 66kv underground XLPE cable along NH-01 at km 368.830 to369.160(RHS) and 368.300 to km 368.830 (LHS) and shifting tower (2.75m x 2.75m) for rising height at parragpur, Distt. Jalandhar in the state of Haryana
  • Proposal for grant of access permission to retail out of M/s HPCL
  • Proposal for access permission for approach roads at km 223/800 to km 223/837.5 (LHS) of NH-59 to the proposed retail outlet of M/S Nayara Energy Limited at Mouza -Daringbadi, Tahasil- Daringbadi ,Dist -Kandhamal in the state of odisha
  • Proposal for access permission for approach roads at km 400/203 to km 400/253 (LHS) of NH-53 to the proposed retail outlet of M/S Bharat petroleum Corporation limited at Mouza -Pankapal, Tahasil- Danagadi ,Dist -Jajpur in the state of odisha
  • Proposal for access permission to the private property ofM/s IPF Vikram India Ltd. at k.m 29.940 (RHS) ON THE NH-21 (205) at village -Ban Majra
  • Permission for road crossing & laying the 2R X 3 core X 33 KV HT cable along the NH-8 for Mahala 33/11 KV GSS work for RHB Colony, Mahala Scheme, Jaipur in the state of Rajsthan
  • Proposal for NOC for overhead crossing of 132 KV D/C Rajatalab - Kachwa Transmission line between Km 764.500 to Km.764.520 in the section of Varanasi – Prayagraj on NH-2 near village – Katka (Babusarai), Tehsil
  • Proposal for access permission to the private property of M/s Cheema Boilers Ltd. at Km 29.855(RHS) on NH-21(205), at Village - Banmajra & Muthadari, Tehsil - Chamkaur Sahib District - Roopnagar in the state of Punjab. Relaxation in norms for Extension o
  • Proposal for permission to lay 11 KV UG power Cable by KSEB on NH 85 from Km.280/195 to 281/800 (RHS) under NH Division Muvattupuzha in the State of Kerala
  • Notice inviting public comments on laying of 110 KV electrical cable and OFC cable along NH 206 from Km 210.943 to 212.720 (RHS) at the extreme edge of the National Highway ROW, for a total length of 1777 mts, including 3 crossings at cross roads by Karna
  • Granting of Right of Way Permissions for laying of Telecom Cables/Ducts along Churachandpur-Tuivai road from Km 0.00 to Km 162.00 on NH-102B in the state of Manipur reg.-For uploading on Ministry's Website
  • Proposat for laying Underground Opticat Fiber Cabte atong NH-361 Totat Length= 120.29 Km, in jurisdiction of PIU Yavatmat, by M/s Sterlite Tech. Ltd , NH - 361 in the state of Maharshtra
  • Proposal for layning Overhead Opticat Fiber Cabte from Km, 61/1320 to 89/200 ending section and crossing chainage Km,76/800 to 86/100 at Various chainages Total Length 26.610 Km, by M/s Stertite Tech. Reg- in the state of Maharashtra
  • Proposal for layning Overhead Opticat Fiber Cabte from Km, 61/320 to 89/200 ending section and crossing chainage Km,76/800 to 86/100 at Various chainages Total Length 26/610 Km, by M/s Stertite Tech. Reg- in the state of Maharshtra
  • Invitation of public comment- Proposal for access permission for approach roads at Km 19/000 to 19/045 (RHS) of NH-149 to the proposed retail outlet of M/s HPCL at Mouza- Barkotia
  • Access Permission for the ofc
  • Laying of Optical Fiber cable by M/s. Network for Spectrum (NFS) – MOD BSNL OFC Project., along Shantipuram - Allkuppam Section of NH-4 from Km. 171.300 to km 172.100, km 178.900 to km.179.750, km 182.240 to km 182.770, km 183.300 to km 183.920 and 185.0
  • Permission Proposal for Erection overhead construction of + 800KV Raigarh – Pugalur HVDC Transmission line Transmission system - Crossing line at 203/180 in Thogarapalli Village (Vertical clearance of ground to line is 28.10m) of NH-66 in the State of Tam
  • Permission Proposal M/s IOCL for laying of (Ennore – Thiruvallur – Bengalore – Pondicherry –Nagapattinam - Madurai- Tutuicorin section) R-LNG pipeline along with OFC the NH across at Km 48/038 by HDD method near Budanur Village, Sriperumbudur Taluk, Kanch
  • Proposal for permission for Trenching and laying of UG Cable from chavara substation to Neendakara Bridge (Km.482/200 to 487/500) on NH 66 (Old NH 47)under IPDS Scheme by Kerala State Electricity Board Ltd,Electrical Section, Sakthikulangara under Kollam
  • Permission Proposal for Erection overhead construction of + 800KV Raigarh – Pugalur HVDC Transmission line Transmission system - Crossing line at 203/180 in Thogarapalli Village (Vertical clearance of ground to line is 28.10m) of NH-66 in the St
  • Permission Proposal for laying of water supply pipe line along the NH from Km 136/030 to Km 136/400 (RHS & LHS)by open Trench method and across at Km 136/030 by Trenchless method (HDD) in Chengapalli to Coimbatore Bypass of NH-47 (New NH-544) in the State
  • Proposal for Permission for laying optical fibre cable along and across the National Highway by M/s Reliance Jio Infocomm Limited, Vijayawada in the stretch from Km 6/0 to 17/0 and across the road at Km 17/0 along the road on NH-340C (Sudireddypalli villa
  • Request to host in Morth portal - Laying of Optical Fiber cable by M/s. Network for Spectrum (NFS) – MOD BSNL OFC Project., along Shantipuram - Allkuppam Section of NH-4 from Km. 171.300 to km 172.100, km 178.900 to km.179.750, km 182.240 to km 182.7
  • Laying of undergroung slurry pipeline for carrying iron ore concrete (in slurry from)- permission for crossing NH roads under jeypore Division (Koraput District ) on NH -63 at km 38.740(Jhilimili), NH- 26 at km326.69 (Majurmunda) ,NH-26 at km346.10 (Barin
  • Permission for laying of Carbon Steel Pipelines for service of natural gas along NH-16 from Km 988.500 to Km 990.270 for a length of 1770 meters in Tadepalligudem, West Godavari District in Andhra Pradesh
  • Access Permission for the Overhead Crossing of 440KV D/C Hadala
  • Access Permission for the laying OFC
  • Proposal for permission of NOC for underground crossing of NH-56 at km. 11.500 to 11.600 by HDD method to lay 125mm MDPE dia pipeline by M/s Green Gas Limited, Lucknow in the State of Uttar Pradesh
  • Invitation of public comments regarding
  • Access permission for the Laying of D water
  • Permission to lay Optical Fiber Cable by from Km. 57.00 to Km. 105.00 section of NH-103 (Old NH-200) by Mis Bharti Airtel Limited
  • Permission for laying of OFC bypass to naziabad bypass of NH-79 of ch. 0.00 to ch. 14.20 Total section of 14..200 km ROW applied for the state of Rajasthan
  • NOC for access permission to proposed retail outlet of M/s IOCL on NH-07 at km 213.263(RHS) at village - Duggan, Tehsil & District- Sangrur, in the Punjab State
  • Proposal for granting of to the Permission for Laying OFC along route Km30.400 to Km30.250 on NH-95(New NH-05) in Block Khamano District Sri-Fategarh Sahid under National Optical Fiber Network of Bharat Boardband Network Limited(BSNL) for providing Broadb
  • Proposal for laying OFC from km 112/800 to 115/600 of Hyderabad-Vijayawada Section of NH-9 (new No.65) in the State of Telangana
  • Proposal for laying OFC from km 112/800 to 115/600 of Hyderabad-Vijayawada Section of NH-9 (new No.65) in the State of Telangana
  • Construction of 800KV HVDC Bipole link from Raigarh-Pugalur, proposal for crossing of NH-16 near Jaipur village of Mancherial-Chennur Section in the State of Telangana
  • Proposal for permission for overhead crossing for construction of 400 KV D/C Darbhanga - Sitamarhi (PMTL) between Km. 41 & 42 of NH-27 (old NH-57)
  • Access permission for New MS/HSD retail outlet abutting on RHS boundary of NH-206 (Tumkur-Honnavara section) at Km 238.581 in Sy No.162/4, 162/5,162/6 of Choradi villag, Shimoga Taluk & District, Karnataka state
  • Permission for laying steel gas pipeline to kabir and prithvi petroleum along NH-48 from km179/700 to km 178/266 for Taluka Bharuch.District Bharuchin the state of Gujarat
  • Proposal for granting permission for laying 125 mm PE Gas pipeline along NH-48 to develop city Gas Distribution in District Surat (from km 260/760 to km 261/525)