  • ROW permission required for 46.8 km optical Fiber Cable laying by HDD method from Km 0/0 to 46/800 on NH-316 (Puri - Satapada link)
  • Proposal for Rehabilitation and Up-gradation of Pune-Mulshi - Mangaon - Mhalsa - Dighi Port and Indapur (NH-66) Tala - Mandad - Agardanda -Dighi Port (SH-96 and SH - 92) NH (Section - II from Mangaon to Dighi Port[ Design Km, 0/000 to Km, 54/750] New NH No.753 F in the state of Maharashtra
  • Proposal for Permission of Laying Underground OFC at Banda NH-66 Panvel - Mahad - Panji Road Km, 466/400 to Km, 468/500 in the state of Maharashtra Total length of 2.30 Km
  • Operation and Maintenance of Madurai – Kanyakumari section from Km.0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu - NOC for erection of 230 KV Overhead Electrical power supply Line crossing at Km.3+450 in Thuvariman Village
  • Proposal for ROW permission for laying 18” OD x 0.25” WT MS LPG Pipeline along with OFC across NH-8 at Km. 32.222 (Revised) near Village-Hariyala, Taluka & District Kheda on Ahmedabad–Vadodara section of NH-8
  • Permission for water Pipe line crossing at Km. 33.960 of NH-8 (New NH-48) (Delhi - Jaipur Road) in the state of Haryana
  • Permission for laying 200mm NB Carbon Steel Gas Pipeline along N-8 (48) from RIICO Neemrana to Behror for approximate 14.300 Km. (Ch. 118.710 to 132.960), LHS and from Ch. 132.960 to 133.550
  • Proposal seeking permission for laying Gas pipeline along the Silchar bypass NH 37(New)/NH-53(Old)from km 0.00 to km 12.75 near Sonarighat under Silchar NH Division
  • Proposal for overhead crossing of Moradabad- Chandausi Road (NH-509) crossing 200-201 km. for crossing by 400KV D/C Rampur- Sambhal Transmission line under TBCB
  • Proposal for overhead crossing of Moradabad-Bareilly road ( NH-530) at crossing 200-201 km. for crossing by 400KV/DC Rampur- Sambhal Transmission line under TBCB
  • Proposal for overhead crossing of Moradabad- Chandausi Road (NH-509) crossing 172-173 km. for crossing by 400KV D/C Rampur- Sambhal Transmission line under TBCB
  • Permission for laying Steel Gas Pipeline along with OFC for City Gas Distribution proiect Koderma along and across NH-31
  • Proposal for grant of permission for laying of OFC from TTSL Chamber, Opposite Atlas Company, Bawal, Haryana at Km. 94+720 to 96+120 (LHS) TTSL BTS site Jaliwas on Gurgaon-Kotputli-Jaipur section of NH-8 (48) by M/s. TATA Teleservices Ltd. in the State of Haryana
  • NHAI – RO Hyderabad – PIU Nirmal– Supply, erection, testing and commissioning of 220/11 KV LIS substation at Manchippa and its connected line from 400/220 KV SS Dichpally-Stringing of transmission line (Dichpally- Manchippa crossing) on NH-44 of Nagpur- Vijayawada section between location no. 14&15 near Sampally Village at Km 337+400 in the State of Telangana
  • Proposal for grant of permission for lay OFC (only 60m road crossing) on Gurgaon-Kotputli-Jaipur section of NH-8 (48) by Dharuhera Telephone Exchange at Km. 72.700 (LHS) in the State of Rajasthan
  • PIU– Chennai - Permission to lay DI Pipeline from Thukivakkam Sewage Treatment Plant to Avilala Tank at Tirupati along the road from Km.283/000 to Km.291/000 on LHS for a total length of 8000m on LHS by Open Trench Method in Tirupathi – Tiruthani – Chennai section of NH-205 in the state of Tamil Nadu
  • Proposal for grant of permission for laying Optical Fiber Cable (OFC) along from Watur-Jintur Section Jintur to Malegaon Phata NH 752 I from Km,37/800 to Km,45/700 total length of 7/900 Km, (Section Jintur to Malegaon phata) in the State of Maharashtra. Permission for laying of Optical Fiber Cable
  • Permission for laying GIGI’s 18” dia Natural Gas Pipeline along with OFC from Mainline (Mehsana -Bhatinda) at village Ajitpura, Tehsil Bhadra , District Hanumangarh in Rajasthan State to village Rithal Tehsil Rohtak in Rohtak District in the state of Haryana state , Pipeline laying across U/C NH152D at village Bainsi , Tehsil Meham ,Distt Rohtak at U/C Chainage km 117+766 of Haryana State
  • 4 laning of Indore-MP/Gujrat border section of NH-59 from Km 9.500 to Km 171.00 in the state of MP on BOT basis under NHDP Phase-III-Permission for laying Optical Fiber Cable utility service along NH-47 from Ghatabillod Km 36.00 to Dhar Km 57.00
  • Permission to lay pipe line along and across NH-200 in connection with the project "Mega PWS to 17GPs of Lakhanpur Block, Jharsuguda with O&M for 5 years
  • Permission of laying & crossing of pipeline along & across Angul-Sambalpur NH-55 (Old NH-42) for Mega Rural Piped Water Supply Project under RWS&S Division, Angul
  • Development of water supply infrastructure in Baripada, Sambalpur, Rourkela, Jharsuguda under UIDSSMT/JBRS - Permission for laying pipeline along NH-49
  • Rehabilitation and up-gradation of existing 2 lane to 4-lane standards to Rimuli (Km.163.000) - Koida (Km.206.200) Section of NH-215 (New NH-520), i.e., Package-l in the State of Odisha under NHOP Phase Il on EPC Mode - Request for approval of Right of Way (RoW) of 500 mm for laying of iron ore slurry pipeline system within utility corridor of NH-215 (New NH-520) from chainage Km.163.000 to Km.190.380 (LHS) for iron ore slurry transportation by M/s Brahmani River Pellets Limited
  • Permission for the install/crossing of 18” Dia Finished Petroleum product Pipeline of M/s HPCL across NH-168 at km 58/950, for the Total Project Length as 24.00 m, in the State of Gujarat
  • Permission for use of Highway Land for the install/crossing of 30” Dia Crude Oil Pipeline of M/s HPCL Rajasthan Refinery Limited across NH-168A at km 16/082. for the Total Project Length as 25.00 m. in the State of Gujarat
  • Permission for use of Highway Land for the install/crossing of 30° Dia Crude Oil Pipeline of M/s HPCL Rajasthan Refinery Limited across NH-168A at km 16/082. for the Total Project Length as 25.00 m, in the State of Gujarat
  • Permission for the install/crossing of 30° Dia Crude Oil Pipeline along with OFC of M/s HPCL Rajasthan Refiner Limited across NH-68 at km 393/483, for the Total Project Length as 60.96m in the state of Gujarat
  • Permission for use of Highway Land for the install/crossing of 30” Dia Crude Oil Pipeline of M/s HPCL Rajasthan Refinery Limited across NH-168 at km 15/300. for the Total Project Leneth as 25,00 m, in the State of Gujarat
  • Access Permission for laying of Underground water pipeline of 400 mm & 160 mm dia casing pipe of 813 mm & 323.3 mm of M/s. Gujarat Water supply & Sewerage Board across NH-56 at Km 268/600 & Km 268/800(2 crossings) near village Motikharaj, Taluka-Dahod, District-Dahod in the state of Gujarat
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of Mission Bhagiratha Pipelines across NH-765 on Hyderabad -Srisailam at Km.107+826 and Km.108+720 through HDD method only in the State of Telangana
  • Proposal for permission for Overhead National Highway (NH-24 Crossing of 400 KV D/C Shamli-Aligarh Transmission Line) between km. 73+500 to km, 73+600 (Exact location 73+550 km)
  • Proposal for permission for Overhead National Highway NH-709A (old no. SH-14)b and bypass crossing of 400 KV D/C Shamli-Aligarh transmission line between km. 23.00 to km. 24.00 (Exact location 23.463 km)
  • Proposal for Permission for overhead National Highway (NH-24 crossing of 400 KV D/C Shamli- Aligarh Transmission line) between km 72+250 to km. 72+300 ( Exact location 72+264km)
  • NHAI, Madurai Region - PIU, Nagercoil - Permission for laying of water supply pipeline along NH from Km, 71/750 to Km 72/300 (RHS) of NH-47 for providing CWSS to Eraniel TP & 319 rural habitations & Improvements to Padmanathapuram CWSS and Kattathurai CWSS in Kanyakumari District
  • PIU–Coimbatore – “Thoppur – Mettur – Bhavani – Erode – NH-544 – Salem (NH) Circle – Gobichettipalayam (NH) Division – Proposal of Smt. S.Rani, W/o Shri. Senthil kumar for laying underground 150 mm dia PVC Water pipe line for agricultural Purpose along NH-544H at Km 61/630 to Km 62/120(LHS) & Road crossing at Km 61/130 of Thoppur-Mettur Dam – Bhavani-Erode Road at S.F.No: 54/3A3B at Singampettai Village, Bhavani Taluk from this site to S.F.No: 279/3 at Olagadam village, Bhavani Taluk, Anthiyar, Erode District, Tamilnadu state
  • Access Permission for laying of Underground water Pipeline of 1418 mm dia with casing of dia 1826 mm of M/s. Narmada Water Resource, Water Supply & Kalpsar Dept across NH-351 at Km 21/640 in Village-Nana Asrana, Taluka-Mahuva, District-Bhavnagar in the State of Gujarat
  • PIU, Salem – Request for permission to lay Underground Optical Fibre Cable (OFC) on NH-68 (Salem to Ulundurpet Section) along the road from Km 1/580 to Km 1/900 (LHS) for a total length of 320m in the limits of National Highways by M/s. Jio Digital Fibre Private Limited, Chennai
  • PIU, Salem – Request for permission to lay Underground Optical Fibre Cable (OFC) on NH-7 (Thumbipadi to Namakkal Section) along the road from Km 227/000 to Km 228/000 (RHS) for a total length of 1000m in the limits of National Highways by M/s. Jio Digital Fibre Private Limited, Chennai
  • Permission Proposal for providing underground 300mm Dia Sullage HDPE pipe line along the road from Km 307/605 to Km 308/725(RHS) on Sathyamangalam- Coimbatore road of NH-948 in the State of Tamil Nadu
  • Access Permission for laying of underground Natural Gas steel pipeline of 90 mm Dia encased in 250 mm Dia casing pipe of M/s. Gujarat Gas Ltd across NH-147 at Km 13.200 Near Ch 0 cirlce, Gandhinagar in the State of Gujarat
  • Proposal for permission for construction & use of approaches/access road to the proposed fuel station on NH-46 (Old NH-12), at between km stone no. 406-407 (Ch. 406-124, LHS), survey no. 238/1, VillagePagari, Tehsil-Biaora, District Rajgarh in the State of MP
  • NHAI-PIU-NSK - 4/6-Laning of Pimpalgaon - Nashik - Gonde (Km 380 - Km 440) Section of NH-3 in the State of Maharashtra - M/s. Dinesh Engineering Ltd. proposal for laying OFC in stretches from Km. 410.100 to Km. 413.800 on NH-3 (Total length- 3.70 Km)
  • Access Permission for laying of Underground water Pipeline of 1418 mm dia with casing of dia 1826 mm of M/s. Narmada Water Resource, Water Supply & Kalpsar Dept across NH-351 at Km 21/640 in Village-Nana Asrana, Taluka-Mahuva, District-Bhavnagar in the State of Gujarat
  • Permission for laying optical fibre cable through underground (HDD) nethod from Suki Village Km 219.300 to Km 219..600 (0.6 Km both side of the road) and Ratanpur Market Km 226.200 to Kurli Village Km 241.000 on NH-34 and length is 14.8 Km. Total length is 15.4 Km within NH RoW in utility corridor
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of drinking water supply pipelines along National Highway from Km.67+620 to Km.68+410 (RHS), from Km.78+675 to Km.78+695 (LHS), from Km.79+860 to Km.80+320 (LHS), from km 113+600 to Km.113+730 (LHS and RHS), from Km119+980 to Km.120+180 (RHS), From Km.121+800 to Km.122+100 (RHS),from Km. 122+400 to Km. 122+800 (RHS), from Km. 123+000 to Km.123+200 (RHS) for a total length of 2,630m through Open trench laying and across National Highway at Km. 80+320, Km.119+980, Km.121+800, Km.113+600 through HDD method, and across service road at Km. 79+420 through open trench laying on Hyderabad -Vijayawada section of NH-65 in the State of Telangana
  • PIU, Chennai – Proposal for laying of 33 KV 1 x 630 sqmm XLPE UG Cable from SRMC 110 KV SS to Kovoor 33/11 KV SS along the road from km 12/060 to km 12/260 by Trenchless Method and from km 12/260 to km 13/060 on LHS by Open Trench method in Chennai Bypass by Executive Engineer, Civil, CDC, TANGEDCO, Chennai
  • Relaxation due to minor deviation for access permission to proposed new retail outlet of M/S Bharat Petroleum Corporation Ltd on NH –60A at Km 73.222 (RHS), Plot Nos- 426(P), 429(P), 430(P), 431(P), 432 (P), 433(P), LR khatain Nos - 795,796, JL No. 150 of Mouza - Singbazar, PS – Purulia, Dist- Purulia, in the State of West Bengal
  • Operation and Maintenance of Madurai – Kanyakumari section from Km.0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu - Permission for laying Under Ground water supply pipeline along the road at Km.240/940 to Km.241/190 (RHS) of Madurai – Kanyakumari section of NH-7 in S.No.195/1 & 197/1 of Agasteeswaram Village, Kanyakumari District
  • PIU–Salem – Proposal for Laying of Water Pipe Line Along the road from Km 16/600 to Km 16/980 (RHS) & Km 16/840 to Km 16/980 (LHS) and across @ Km 16/980 of NH-47 (Salem to Kumarapalayam section) for the total length of 0.520 Km by the Executive Engineer, TWAD Board, RWS Division, Namakkal
  • Access Permission for crossing of an Overhead electric line of 765 KV D/C of M/s. Lakadia Banaskantha Transco Ltd. across NH-68 at Km 409.845 in Village- Chichedara, Taluka- Bhabhar, District- Banaskantha in the State of Gujarat
  • Proposal for NOC permission for laying of approx 3.0 km, 8” dia. steel pipe line on NH-330 (96) at Km. 114.00 to 117.00 (Ayodhya – Sultanpur Road) through open cut trench method
  • Regarding issue of NOC for final access permission to private property of M/s VV Builder on Amritsar Section of old NH-01 (New NH 03) at km. 458.630 (RHS), at village Naushera Tehsil & District Amritsar in the State of Punjab
  • Implementation of Delhi Gurugram SNB RRTS corridor regarding permission for laying of electrical cable across NH-48 Crossing at Ch, 30910, Ch, 31100, Ch. 31550, Ch. 32200 & Ch, 32700
  • Out 1094-AEE-Sr.Technical Director, NIC, New Delhi-Public Comments-Megha Engineering and Infrastructure Ltd seeking permission to lay MDPE Natural Gas pipeline from km.20.200 to 25.600-IBM-Chandragudem sec
  • Out 1095-AEE-Sr.Technical Director, NIC, New Delhi-Public Comments-GGPL seeking permission to lay 3LPE Coated Carbon Steel Pipeline, dia MDPE pipeline for service of Natural Gas along NH 216 from Km.100.600 to 101.600 in Amalapuram, EG District
  • Four laning of Brahmani bypass to Rajamunda section of NH-143 in the state of odisha - Permission for Laying of Gas Pipeline and OFC along with NH-23 at the Location from Road ch.242.866 to Road ch.245.140 and Csross at the location Road ch.242.866
  • Out 1099-AEE-Sr.tECHNICAL Director, NIC, New Delhi-Public comments-Proposal for Permission for laying Optical Fibre cable (OFC) by M/s Vindhya Telelinks Limited from km 0/000 to km 9/842 of NH 326A (RHS) of Mohana to Narasannapeta section land at Nautala (via) Dasapuram, Atisurakaviti, Jaggilibonthu, Korsawada, Pathapatnam villages, Srikakulam District in the State of Andhra Pradesh by the Horizontal Directional Drilling (HDD) method
  • ROW permission for laying of Natural gas pipelines & OFC cable lines in Chandikhole to Paradip section of NH-53 of M/s. Bharat Gas Resources Limited- Under City Gas Distribution Scheme
  • PIU–Coimbatore – Implementation of ‘Bharatmala Pariyojana’ Phase – I –“Thoppur – Mettur – Bhavani – Erode – NH-544 – stretch assigned to Tamil Nadu NH Wing – Updation of Detailed Project Report (DPR) prepared by Tamil Nadu Road Sector Project (TNRSP) for NHAI – Salem (NH) Circle – Gobichettipalayam (NH) Division – Proposal seeking permission for laying of underground Agricultural 400mm dia pipeline from Km 61/640 to Km 63/075 (LHS) and across the road at Km 61/640 on NH-544H
  • Proposal for granting Permission for underground crossing by HDD method of water supply pipeline (HDPE) of NH-128, Tanda-Sultanpur Section at Km 16.253, Km 16.700 & Km 20.645 at Akbarpur & Ambedkar nagar
  • Proposal for granting Permission for underground crossing by HDD method of water supply pipeline (HDPE) of NH-128, Tanda-Sultanpur Section at Km 22.063, Km 22.775 & Km 24.217 at Akbarpur & Ambedkar nagar
  • Proposal for granting Permission for underground laying water supply pipeline (HDPE) from km 12.000 to Km 13.825 and crossing by HDD method at km 13.732 on NH-128 Tanda-Sultanpur Section at Akbarpur & Ambedkar nagar
  • Permission for Overhead Crossing between km. 285.572 RHS to km. 285.730 LHS in Jind to Punjab/ Haryana Strech of old NH 71 in District Jind in the State of Haryana of 220 KVC Narwana Mund Line at 400 KV S/STn PGCIL by M/s HVPNL has been proposed with Vertical Clearence of overhead crossing of 10.78 m
  • NHAI – RO Hyderabad – PIU Warangal–Proposal for Permission for laying of Telecom ducts/OFC cables using HDD method from Km.55/800 to Km.57/000 (LHS), Km.55/800 to Km.57/000 (RHS), and Km.123/665 along the road for a total length of 4000 m and road crossings at Km.55/800 on Jagityal – Karimnagar- Warangal Section of NH-563 in the State of Telangana
  • Overhead crossing of 220kvc Narwana Mund line at 440 KV S/Stn PGCIL by M/s HVPNL between km. 285.495 (RHS) to km. 285.630 (LHS) in Jind to Punjab / Haryana Border section of NH-71 with vertine clearance of 10.78 in districtJind in the State of Haryana
  • 4-laning of Barhi-Koderma section of NH-31 from Km 0.000 to Km 27.500 in the state of Jharkhand: Permission for crossing and laying of water pipeline along NH-31 under Koderma Urban Water Supply Scheme
  • Proposal seeking permission for laying of XLPE HT UG cable on RHS of NH 234 from Km 381.500 t Km 387.160 for a total length of 5.66 Kms By M/s Klene Paks ltd Bangalore through open trench method
  • Four laning of Jorabat-Barapani section of NH-40 from km 0+000 to 61+800 in the State of Meghalaya under SARDP-NH on BOT (Annuity)basis. Regarding for NH access permission for New Retail Outlet (Feul Station) on a plot of land abutting on the LHS boundary
  • Permission for laying of 6" Dia natural Gas Carbon steel pipeline along NH-2 Right Side for Approx 0.140km. (Ch. 455+950 to ch 456+090) & across NH-2 at Ch. 456+090 approx 0.060 km
  • Permission for laying of 6" dia natural gas Carbon steel pipeline along NH-2 Right Side NH ch. 470.220 to ch 470.620 for approx 0.400km. & 01 No. of crossing at ch. 470+220 on NH-2
  • Rehabilitation and Up-Gradation to 4 - Laning of Biramitrapur - Brahmani Bypass end of NH - 23 (New NH No.143) Km.211.200 to Km 237.100 and From Km 0.000 to Km 3.300 (Brahmani Bypass) i.e. up to Km. 240.250 on NH - 23 beside BNR Weigh Bridge in the State of Odisha under NHDP IV Package-1(A) - Proposal for laying of 450mm dia water pipeline in the Utility Corridor of NH23 (New NH-143) from Km 225.530 to Km 228.990 by M/s Adhunik Metaliks Ltd., Kuarmunda
  • Proposal for permission for laying of 66 KV Vasedi Pavi Jetpur line with ACSR Dog conductor on D/C panther tower on NH-56 at km 394/100 Village - Dhandhoda, Taluks Chotaudeypur, District Chotaudeypur in the State of Gujarat
  • Permission for laying 24” OD x 0.25” WT MS LPG pipeline along with OFC cable across NH-64 (old NH -228) Buva to Kerwada section at Ch. 193/730 in the State of Gujarat
  • Permission for laying 24” OD x 0.25” WT MS LPG pipeline along with OFC cable across NH-64 (old NH -228) Amod-Bharuch section at Ch. 189/400 in the State of Gujarat
  • NHAI-PIU-GOA-Request for the Permission for laying of Indian oil Adani Gas pipeline along the National Highway NH-17B(Verna Junction - Sada Junction Section) on LHS from KMQ00.000 to KM04.000, & KMO8.000 to KM09.435 ahd from KMO2.200 to KM02.400 on RHS by Open Trenching Method & 6 Nos of Road crossing @KMO00.025, KM02.400, KM03.200, KM08.000, KM09.435 & KM13.100 by HDD Method ( Total length-5.635 Km)
  • Proposal for grant of permission for overhead crossing of NH-754K (AJ/SR Pkg-7) by proposed 765KV D/C Bikaner-Khetri Transmission line near village Runia Bada Bas, Distt-Bikaner at Km. 188.500 to 190.00 by M/s. RVPNL, Bikaner
  • Proposal for grant of permission for laying underground OFC along Jaipur-Sikar NH-52 from Ch, 294+860 (near Hotel Rajkamal) to Ch. 297+587 (RHS) total length 2.2727 km. in the State of Rajasthan by M/s. Jio Digital Fiber Pvt. Ltd.
  • Permission for laying OFC from NH-925, Km 35+000 to 58+000 (LHS) Total length of 23.00 Km. (Bijrad-Dedusar-Mithe Ka Tala) ROW applied for Gagariya-Bhakasar section of NH-925 in the state of Rajasthan by M/s. Telesonic Networks Ltd
  • Proposal submitted by the Project Officer / EE, Andhra Pradesh Township and Infrastructure Development Corporation seeking permission for laying Water Supply Pipeline along National Highway from Km.601.840 to Km.605.340 of NH-16 at RHS in Srikakulam District for a length of 3500mt
  • Proposal submitted by the Executive Engineer PD-III, Grater Visakhapatnam Smart City Corporation Limited (GVSCCL) seeking permission for crossing the NH-16 with horizontal boring method at Gajuwaka Police Station at Km.723.650 of NH-16
  • Proposal submitted by the Executive Engineer PD-III, Grater Visakhapatnam Smart City Corporation Limited (GVSCCL) seeking permission for crossing the NH-16 with horizontal boring method at near Sheela Nagar Junction at Km.717.676 of NH-16
  • Permission for Crossing of proposed Gas pipeline of 12 inch Dia natural gas pipeline along with OFC Duct/Cable M/s GAIL at km 0.528 across a NH 07 in Bathinda Malout section Highway at village Bahman Diwana in Tehsil and district-Bathinda in the State of Punjab by HDD method
  • Proposal of permission for laying 8" Dia, Steel Pipe underground public utility services Natural Gas pipeline on Ahmednagar - Daund - Baramati - Road SH60(NH1-60) from Kurkumbh to Gunjkheda Junction (Vasunde Phata ) Ch.Km,84/061 to Ch.Km, 93/950 Total Km, 9.889, in the State of Maharashtra
  • Proposal for grant of permission for laying Water supply pipe line along National Highway from Km. 140.200 to Km. 157.800 And crossing (RHS) Nandgaon peth to MIDC Amravati Bypass Tq. Amravati, Dist. Amravati
  • Permission for laying of Steel Gas pipeline along/across NH-50 from Ch. 417.800 to Ch. 420.000 & along/across NH-63 from Ch. 279.820 to Ch. 339.000 ( For a total length of 61.380Kms) & 8 Nos. of Road Crossings and 14 Nos. of Cross road crossings in Bellary District, Karnataka
  • Proposal for Permission for laying Optical Fibre cable (OFC) along NH-42 by M/s Reliance Jio Infocomm Limited from km 248/950 to km 252/200 (RHS) of NH42 in Madanapalle bypass road for a total length of 3250mtrs in Chittoor District in the State of Andhra Pradesh
  • Permission for overhead crossing of 132 KV S/C Dalot-Negadiya Transmisssion line between Km. 295.600 to 295.700 on NH-927 in the state of Rajasthan
  • Permission for laying of water pipeline along across the NHAI (NH-52) road from Ch. 223.790 to Ch. 252.510 along the road and Ch. 5523.490, Ch. 228.690, Ch. 237.960, Ch. 245.100, Ch. 248.220, Ch. 252.510 six road crossing of NH-52
  • Proposal for Permission for laying Optical Fibre cable (OFC) by M/s Vindhya Telelinks Limited from km 73/525 to km 84/976 (LHS) of NH-544D (Ananthapuramu-Tadipatri-Bogasamudramu section) and crossing at km 84/876 from LHS to RHS for a total length of 11.351kms in Kurnool District in the State of Andhra Pradesh
  • Proposal for grant of permission for lay OFC along NH-11 from Km. 266/0 to 289/0 (RHS} on Bikaner-Phalodi section for NOFN Project from Phalodi Over Bridge near Railway line to Khirwa Panchayat (near toll plaza), Phalodi, Distt-Jodhpur in the state of Rajasthan by BSNL
  • Permission for laying of Steel Gas pipeline along/across NH-50 from Ch. 417.800 to Ch. 420.000 & along/across NH-63 from Ch. 279.820 to Ch. 339.000 ( For a total length of 61.380Kms) & 8 Nos. of Road Crossings and 14 Nos. of Cross road crossings in Bellary District, Karnataka
  • Proposal for granting Permission to cross NH-56A &B (Shaheed Path) MDPE Pipe at Ch. 20.250 to Ch. 20.350, approx length 100 mtr) to lay 125mm MDPE Pipeline by trenchless (HDD) method in front of Bhukhand Vihar
  • NHAI – RO Hyderabad – PIU Warangal–Proposal for Permission for laying of Telecom ducts/OFC cables using HDD method from Km.132/500 to Km.137/750 (RHS), Km.132/250 to Km. 139/750 (LHS), Km.141/150 to Km.142/650 (LHS) along the road for a total length of 14,500 m and road crossings at Km.132/250 and Km.139/750 on Hyderabad to Bhoopalapatnam Section of NH-163 in the State of Telangana
  • Proposal for overhead crossing of NH-709B by 132KV D/C Sarsawa- Rampur Maniharan Transmission line between ch. 115.440 to ch. 115.490
  • Proposal for permission for laying of 6" dia Natural gas carbon steel pipeline along NH-2 Right side from NH ch 463.240 to ch. 463.640 (opp .side ved Sassomechanica Industrial to shushil Mototrs IOCL RO) for approx. 0.400km./ & 01 No. of crossing in the state of Uttar Pradesh
  • Permission of new ROW/33 KV underground cabling work at NH-75 Kathitand Chowk under JSBAY-|: Regarding issuance of provisional NOC
  • Four laning of Borgaon Watambare section of NH-166 from Ch. 224/000 to Km. 276/000 (PKG-II) in the state of Maharashtra on Hybrid Annuity Mode - Proposal for the laying of Optical Fibre Cable from Km. 224/370 to Km. 224/600
  • Permission proposal for laying underground Cable along the National Highways from Km 5/800 to 6/300(LHS) and cross at Km 6/310 of NH-81(Coimbatore-Karur-Trichirapalli-Chidambaram Road in the state of Tamil Nadu
  • Permission for laying Pipeline from Km.stone 190 to 174 of NH-927A Dungarpur in the state of Rajasthan
  • Proposal of M/s Power Grid for permission of NH-334 NOC for overhead powerline crossing at chainage 25.452 Km. near Vill - Dheerkhera , Teh. & Distt. - Meerut by under construction LILO 765 KV SC Gr. Noida - Hapur Transmission Line at 765 KV Substation
  • Proposal for permission for laying of 6'' API 5L Gr X 52, PSL 2, 6.4mm thick, 3LPE coated carbon steel pipeline for service of Natural Gas across & along NH 165 in Bhimavaram WG Dist AP
  • Operation & Maintenance Period of Tada - Nellore (km. 52.800 to 163.600 section of NH-16 - Permission for laying 4" Steel Pipeline across NH-16 at km.120/300 (50 mts) & 125 mm PE Pipeline along NH-16 from km. 120/140 to km. 120/300 (160 mts) along NH-16 in the state of Andhra Pradesh
  • Proposal of M/s Power Grid for permission of NH-334 NOC for overhead power line crossing at chainage 20.478 Km. near Vill - Kharkhauda, Teh. & Distt. - Meerut by under construction 400 KV D/C Muradnagar - Simbhawali Transmission Line
  • Proposal of M/s Power Grid for permission of NH-334 NOC for overhead power line crossing at chainage 25.719 Km. near Vill - Kaili Teh. & Distt. - Meerut by under construction LILO of 765 KV SC Gr. Noida - Hapur Transmission Line at 765 KV Substation
  • Submission of Application for (A) Permission for 4”/8” dia steel gas pipeline along with 40 mm HDPE Duct for OFC City Gas Distribution project along and across National Highway No. 19
  • Proposal of M/s Power Grid for permission of NH-334 NOC for overhead power line crossing at chainage 19.740 Km. near Vill - Kharkhauda, Teh. & Distt. - Meerut by under construction 400 KV D/C Muradnagar - Simbhawali Transmission Line at 765 KV Substation
  • Right of Way (ROW) permission for laying of 16" dia. Petroleum Product Pipeline along with Optical Fibre Cable (OFC) at Km 20.960 across Bowdara to Vizianagaram section (Km 0.00 to Km 26.937) of NH-516Ein the State of Andhra Pradesh
  • Rehabilitation and up gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388.376 to Km.428.074) of NH-200 (New NH-53) in the state of Odisha under NHDP-III
  • Rehabilitation and up gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388,376 to Km.428.074) of NH-200 (New NH-53) in the state of Odisha under NHDP-II-ROW permission for laying iron ore slurry pipeline, return water supply pipeline & OFC in the RoW of NH-53 from chainage 3974950 to chainage 427+400
  • Proposal for ROW permission for laying of 600 mm dia Sewer Pipeline along the NH-48 Right of Way from Km 271+00 to Km 271+800 on LHS and Crossing at Km 271+00 of NH-8 in the Village–Makhinga, Taluka–Palsana, Dist–Surat in the state of Gujarat
  • NOC for O/H crossing of NH-91 with 400 KV DC Shamli - Aligarh Transmission Line in between Ch.163.700 to Ch.163.800 near Village Akrabad & Nanau in the State of Uttar Pradesh
  • Proposal of permission for laying underground Optical Fibre Cable (OFC) along National Highway from Km.220/150 to 220/350 (RHS), Km.224/050 to 235/100 (LHS), Km.220/150, Km.222/250, Km.224/3 (LHS), Km.220/150 to 224/300 Km.230/850 to 230/900 (RHS) & crossing at 00, Km.230/850 & Km.230/900 of NH-67 (Nagapattinam- Guddalore - Mysore Road) in the state of Tamil Nadu
  • Permission for laying of Optical fibre cable (OFC) by M/s. Telesonic Network Ltd., from Km.54/500 to 61/400 (6600 mts) on Tada - Nellore section of NH-5 ( New NH-16)
  • Proposal for permission of laying 24” Dia. Steel Pipe underground public utility services Bharat Gas pipeline on Ahmednagar - Kinetic Chowk to Vasunde Phata Road SH 60 (NH-160) from Ch.Km, 34/000 (Kolgaon) to Ch. Km,5/500 (Arangaon) Total Length Km,28.500. in the state of Maharashtra
  • Permission for laying Optical Fiber Cable (OFC) Khamgaon to Mehkar Road section of NH-548-C from in Km, 25/280 to 33/340. in the state of Maharashtra. Permission for laying of Optical Fiber Cable - reg... Applicant: - M/s Reliance Jio Infocom Ltd
  • Proposal of Permission for laying of U/G Optical Fibre Cable (OFC) on Mandala - Nainpur - Balaghat - Gondia - Amgaon - Deori - Korchi - Bramhapuri road NH 543 in section Bodaldbd to Jambhali from Km, 364/975 to Km, 371/075 in the state of Maharashtra
  • Proposal for Permission for laying Optical Fiber Cable along M.S, border to Murumgaon - Dhanora - Gadchiroli - Mul - Chandrapur - Warura - Wani Karanji Road on NH-930 Km, 328/000 to 332/000 total section Length for ROW applied 12.00 Km, in the state of Maharashtra
  • Proposal for Permission for laying Optical Fiber Cable along M.S, border to Murumgaon - Dhanora - Gadchiroli - Mul - Chandrapur - Warura - Wani Karanji Road on NH-930 Km, 328/000 to 332/000 total section Length for ROW applied 12.00 Km, in the state of Maharashtra
  • Proposal of Permission for laying of U/G Optical Fiber Cable (OFC) along Kothari to Gondpipari Road on NH 353 B Km, 255/790 to 280/000 total section length for ROW applied 24.21 km in the state of Maharashtra
  • Proposal of Permission for laying of U/G Optical Fibre Cable (OFC) along NH 353 E Umred - Bhisi - Chimur - Anandwan - Warora KM, 47/700 to 98/430 total section length for ROW applied 50.73 Km, in the state of Maharashtra
  • Proposal of Permission for laying of Optical Fibre Cable (OFC) along Morshi - Chandurbazar Achalpur Road on NH 353 J in the section 1) Telegaon Mohan GP to Paratwada T Point @ 44/850 to 47/055 LHS and Km, 47/655 to 53/719 RHS with one crossing @ Ch. 47/655. 2) Kondwardha GP to Talegaon Mohana @ Ch. 43/900 to 43/907 RHS and 43/907 to 44/440 LHS with one crossing @ 43/907. 3) Kuralpurna GP to Masod GP @ 37/950 to 40/475 LHS with one crossing @ Ch. 37/950. 4) Near Haidarpur GP to Asegaon GP T point @ 35/160 to 35/220 RHS and 35/220 to 35/500 LHS with one crossing @ Ch. 35/220. 5) Sirajgaon Band GP to Haidatpur GP @ 32/200 to 35/150 LHS. 6) Chandurbazar Tahsil office Entry to Jasapur GP @ 30/735 to 31/600. 7) Riddhpur GP to Chandurbazar @ 24/398 to 30/583 RHS with one crossing @ Ch. 27/905 i.e. Length along the road 21.734 Km, and across 0.144 Km Total Length 21.878 Km, in the state of Maharashtra
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of Badepally Water Supply Improvement Scheme (Balance) under Mission Bhagiratha (Urban) along National Highway from Km.79+295 to Km.79+755 (LHS), and from Km.79+295 to Km.79+805 (RHS) for a total length of 970 m through Open trench laying and across National Highway at Km. 79+295 through HDD method on Hyderabad -Bangalore section of NH-44 in the State of Telangana
  • Permission Proposal for laying underground Irrigation, Ground Water Recharge and Drinking Water pipe tine along the National Highways 180mm dia from Km 274/800 to 278/435(RHS},225mm dia Km 278/435 to Km 279/330(RHS),280mm dia from Km 279/330 to Km 283/600(RHS),315mm dia from 283/600 to Km284/856(RHS),355mm dia from Km 284/856 to Km 285/450(RHS),510mm dia from Km 285/450 to Km 286/340(RHS),1100mm dia from Km 287/335 to Km 287/575(LHS),510mm dia from Km 294/120 to Km 294/5G0(LHS),355mm dia from Km 294/500 to Km 297/603(LHS) and 315mm dia from 297/603 to Km 298/645(LHS) and crossing at Km 275/720,Km 277/745,Km 278/435,Km 279/550,Km 280/018,Km 282/225,Km 283/240,Km 284/856,Km 285/450,Km 287/575,Km 294/120 and 297/603 of NH 948(Old NH-209) Sathyamangalam to Coimbatore Road in the State of Tamil Nadu
  • Proposal for NOC for the overhead crossing of Jhansi-Khajuraho NH-39 by LILO of 132 KV RTSNiwari near al Village-Devendrapura Distt -Niwari
  • Permission for laying underground Optical Fiber Cable line along the National Highways from Km 253//000 to Km 270/180(LHS) and Km 271/000 to Km 274/000(LH5) and road crossing at Km 260/450, Km 260/460 of Bengaluru-Kanakapura-Malvalli-Kollagal-Chamaraj Nagar-Sathy- Coimbatore Road of NH-948 in the State of Tamil Nadu
  • Permission proposal for laying underground new water supply pipeline of 250mm dia along the National Highways from Km 36/870 to 37/160(LHS) for providing Athikadavu-Avinashi Scheme as irrigation, Ground water recharge and drinking water supply scheme of NH181(Coimbatore to Mettupalayayam Road) at Coimbatore District in the state of Tamil Nadu
  • Development of Adequate Road Connectivity to New Mangalore Port – Stretch from Surathkal (Km. 358.000) to Nantoor Junction (Km. 375.300) on NH-66 &B.C.Road (Km. 328.000) to Padil (Km. 345.000) on NH-73 (old NH-48) and Bypass section from Nantoor to Padil for a total length of 37.225Km - Proposal for laying 4, ''6'' & ''8'' Natural Gas Pipeline along NH-66 from Padil to Nantoor and Surathkal to Nantoor under CGD Project for a total length of 17.439kms in the state of Karnataka
  • Four laning of Kundapur - Surathkal Section of NH-66 (formerly NH-17) from Km.283.300 to Km.358.080 (Section 1), Nantoor to Mahaveer Circle (Km.375.300 to Km.376.700) and Mahaveer Circle to Talapady (Kerala Border) Km.3/700 to Km.17.200 in the State of Karnataka - Package No.NHDP-III/BOT/KNT/04. - Proposal for granting of permission for laying 660mm dia MS water supply pipeline from Thokkottu junction to near Talapady toll gate along NH-66 on LHS (6250mtrs) from Ch:9.730 to Ch:15.980 and laying 559mm dia MS water supply pipeline across NH-66 near Thokkottu junction using 1200mm dia MS casing pipe by Horizontal ramming by trenchless technology (45 mtrs) at Ch:9.880 under providing water supply scheme to Ullala city, Kotekar TP, enroute 25villages, Educational and other institutions with Nethravathi river as source in the State of Karnataka
  • Four laning of Goa-Karnataka Border to Kundapur section of NH-66 (formerly NH-17) from Km. 93.700 to Km. 283.300 in the State of Karnataka to be executed as BOT Project on DBFO Pattern under NHDP-IV - Granting of Permission for laying of 110KV UG cable across NH-66 at Km.217.014 at Murudeshwar in Bhatkal Taluk for availing connectivity to proposed Railway Traction sub Station
  • Permission for the install/laying of 80 mm dia. Optical Fibre Cable (OFC) HDPE duct of M/s Jio Digital Fibre Private Limited across NH-168A between km 11/800 to km 36/500, for the Total Project Length as 24.70 km, in the State of Gujarat
  • Four Laning of Kazhakuttam to Mukkola section (Km.0+000 to Km.26.500) of NH-66 in the State of Kerala under NHDP Phase-III on EPC mode- Right of way permissions for crossing of 350mm DI pumping main at Km. 15+890 to Kerala Water Authority for the works under AMRUT scheme
  • Permission of laying of 33 kv of M/s DHBVN i.e. Bohatwala and Hemelti Line along km. 5.534 to Km. 6.038 (LHS), km. 6.038 to km. 9.715 (RHS) by open cutting method and crossing at km. 6.038 by HDD method on old NH-71 section of Jind-Punjab/Haryana Border in District Jind in the State of Haryana
  • Proposal seeking permission for laying of lift irrigation scheme raisiing main (MS) across NH-548B (Vijayapura-Sankeshwar section at Km 129.084 & 133.284 in the State of Karnataka by Minor irrigation and Ground water Development department Division Belagavi
  • Proposal seeking permission for laying of OFC Cable along NH-166E from Babanagar Km 7.00 to Kanamadi Km 21.500 on RHS for a total length of 14.50 Kms through HDD method by M/s Telesonic Networks Ltd
  • Proposal seeking permission for laying of OFC cable along NH-548B from Nagathana Km 83.900 to Bijapur Ring Road Km 100.00 on RHS for a total length of 16.10 Kms through HDD method by M/s. Telesonic Networks Ltd