Sorry, you need to enable JavaScript to visit this website.

You are here

  • Proposal for grant of permission for laying Optical Fibre Cable from KM 06.250 at ISBT, Silchar to Km 9.375 Near TV Tower Road Point of NH-53 (Length-3,160 Mtrs)
  • Proposal for Permission for laying Optical Fibre Cable OFC using open cut method within NH area NH-753 J Jalgaon - Pachora - Bhadgaon - Chalisgaon road from Ch. 41/650 to 49/775 along the road in right of way for the total length of 8125 Meters, in the State of Maharashtra
  • Proposal for grant permission for laying Steel Gas Pipeline along in between Opposite to HPCL Chakan Petrol Pump Depot. To Akshay Kiran IOCL pump on Pune - Nashik Road NH-60 Km,32/458 to Km, 34/113 Left side going towards Nashik and across from Samruddhi Pump to devendra BPCL Pump, Chakan (at Km, 29/835), in the state of Maharashtra. Total Length - 1.700 Km.
  • Proposal for laying Water pipeline in the land across National Highways No. 161 Akola- Washim- Hingoli- Nanded at TKV Chowk Patur at existing Ch. 31+440
  • Permission for laying underground Telecom Cable at NHAI-AH-53 LHS Nagpur Akola Road Chainage km 155.000 to km 155.500 total length 0.500 kms. Crossing at Chainage km 155.000 on Talegaon - Amravati section of NH-6 (New NH-53)
  • Permission for laying of GAIL’s proposed 24” dia Gas pipeline alongwith OFC Cable across National Highway-52 at NH Ch. 324+720 & Pipeline Ch. 256+080 in falling en-route Mumbai to Nagpur Pipeline in Aurangabad District
  • Proposal for Permission for laying Optical Fibre cable (OFC) along NH-40 by M/s Airtel Telesonic Network Ltd., Hyderabad from km 299/288 to km 316/000 (LHS) of NH-40 for a total length of 16,712mts and across the road at Km 311/000 for a length of 30mts in Chittoor District in the State of Andhra Pradesh
  • Proposal for permission for overhead crossing NH-77 between location no. AP 11/1 to AP/2 for construction of 132KV DC Transmission line by making LILO arrangement of 132KV DCSS Benipatti-Pupri line at Sitamarhi (New) GSS with ACSR Panther conductor (Line Length-31RKM) on turnkey basis under State Plan
  • Permission for Laying of Gas pipeline of 125 mm inner Diameter steel natural gas pipeline from km 40.480 to km 41.200 (BHS) (total length 1440 m ) along old NH- 01 (New NH -44) in Delhi - Panipat section of Highway , pipeline of 125 mm inner Diameter steel natural gas pipeline from km 6.800 to km 11.600 (LHS) and pipeline of 100 mm inch diameter from km 11.660 to km 12.010 (LHS) along NH-334 B in Gohana Sonipat section of Highway in the State of Haryana by open trench method as well as HDD method wherever not feasible as per open trench method or as per direction of PD Sonepat and One crossing at km 40.480 along old NH- 01 (New NH -44) in Delhi - Panipat section of Highway
  • Proposal for laying of OFC by M/s Vindhya Telelinks Ltd, Secunderabad from Km 164/800 to 167/200, Km 167/200 to Km 168/400(RHS) & Road crossing at Km 167/200 (RHS-LHS) for a Total length of 3.6 Km along Rudrampur-Bhadrachalam Section of NH-30 in the state of Telangana
  • Proposal for NOC permission for laying of 65mm underground OFC (Optical Fiber Cable) from km.394.500 to 405.008, km.405.075 to 414.290 and km.416.100 to 420.000 (Dhebarua - Siddharth Nagar), on NH-730, District - Siddharth Nagar. (Total length 23.623 km.) in the State of Uttar Pradesh
  • Proposal for grant Permission to carry out horizontal direct drilling and open trenching work for laying Optical Fiber Cable OFC telecom duct/cable along NH Jurisdiction on NH-752 G, Khetia - Sakri - Pimpner - Shirdi road from Km, 144/000 to Km, 165/500, total length of 21.500 Km, in the State of Maharashtra
  • Proposal for grant Permission to carry out horizontal direct drilling and open trenching work for laying Optical Fiber Cable OFC telecom duct/cable (2 no's) along NH Jurisdiction on NH-160A, Trimbkeshwar - Jawhar - Charoti road from Ch. Km, 93/500 to Km, 107/00, total length of 13.50 Km. in the State of Maharashtra
  • Proposal for grant Permission to carry out horizontal direct drilting and open trenching work for laying Optical Fiber Cable OFC telecom duct/cable (2 no's) along NH Jurisdiction on NH-65, Pune - Solapur - Hydrabad road from Bhulabhai Chowk to Market Yard Chowk Solapur Ch. Km, 247/500 to Km, 248/700, total length of 1200 Mtr. in the State of Maharashtra
  • Proposal for permission to laying Underground 24" dia. Gas Pipeline with Optical Fiber Cable (OFC) across Wardha - Arvi road, section of NH-647 at Km, 3/400 near Yelaketi, Taluka - Arvi, District - Wardha in the state of Maharashtra
  • Proposal for permission to laying Underground 24" dia. Gas Pipeline with Optical Fiber Cable (OFC) across Salod - Pulgaon - Arvi road, section of NH-347 at Km, 34/900 in Taluka - Arvi, District - Wardha, in the state of Maharashtra
  • Proposal for laying of OFC by M/s Vindhya Telelinks Ltd, Secunderabad from Km 164/800 to 167/200, Km 167/200 to Km 168/400(RHS) & Road crossing at Km 167/200 (RHS-LHS) for a Total length of 3.6 Km along Rudrampur-Bhadrachalam Section of NH-30 in the state of Telangana
  • NHAI, PIU - Viluppuram - Proposal for laying of underground Optical Fiber Cable (OFC) on NH-45 along the road from Km.146/600 to Km.146/900 (RHS) and Km.156/750 to Km.157/060 (RHS) and also a crossing at Km.156/750, for a total length of 610m along the NH and one crossing across NH by M/s. Telesonic Networks Limited, Chennai - Approval Requested
  • NHAI - PIU, Salem - Proposal for laying of underground Optical Fiber Cable (OFC) by HDD Method along the NH-68 from Km 27/200 to km 30/040 - 2.84Km (RHS) and across the road by HDD Method at Km 27/200 - 60m, Erecting prefabricated OFC MH’s @ Km 27/000 (R), Km 29/020 (R), Km 30/040 (R) by M/s Jio Digital Fibre Private Limited, Chennai - Approval requested
  • Proposal for permission of overhead crossing of NH-709A (Garhmukteshwar- Meerut Road) at Chainage 8.765 km Near Village- Lodhipur Sobhan, Tehsil- Garhmukteshwar, District-Hapur for construction of 400KV D/C Meerut- Simbhawali Transmission Line
  • Proposal for Permission for laying Optical Fibre cable (OFC) along NH-40 by M/s Airtel Telesonic Network Ltd., Hyderabad from km 321/000 to km 327/000 (RHS) of NH-40 for a total length of 6000mts and across the road at Km 321/000 for a length of 30.00mts in Chittoor District in the State of Andhra Pradesh
  • Proposal seeking ROW permission for crossing of 765KV D/C Lakadia to Vadodara Transmission line under Lakadia Vadodara Transmission Project Ltd at Km 372+240, Village-Fajalpur, Taluka & District-Vadodara in the state of Gujarat
  • Proposal for ROW permission for laying 24” OD X 0.25” WT MS LPG Pipeline along with OFC across proposed Vadodara-Mumbai National Expressway at Km 325+700, Village-Sanpa, Taluka-Karjan, District-Vadodara in the state of Gujarat
  • NHAI-RO Kerala- Four laning of Thiruvananthapuram bypass from Kazhakuttam- Mukkola (Km.0+000 to Km.26+500) section of NH-47(New NH-66) under NHDP Phase-lll in the State of Kerala-Laying of 11 KV HT UG Cable for giving HT supply to M/S Legoona Retreats Pvt Ltd. from Km.18+850 to Km.19+020 RHS in Thiruvananthapuram Bypass
  • Seeking permission / NOC for installation of mobile network site at LHS 23.850 (approx.) and the exact latitude and longitude area 23.5103377 77.094681 : Delhi-Gurgaon Border, near toll plaza on the lefthand side from Delhi to Gurgaon 1222016
  • Four laning of Yavatmal - Wardha (Package-III) section of NH-361 from Km 400.575 to km 465.500 (Design Length -64.925) under NHDP Phase-IV on Hybrid Annuity Mode in the State of Maharashtra- Permission for underground Horizontal Bore for laying of 11KV cable at village Bhari, Tal.- Yavatmal, Dist. Yavatmal Ch. 412.310 crossing the road on Yavatmal - Wardha section of NH-361 in the State of Maharashtra
  • Design, Engineer, Finance, Construction, Operation and Maintenance Chhattisgarh / Maharashtra border - Wainganga Bridge section from km. 405 to km 485 of NH-53 (old NH-6) in the state of Maharashtra under NHDP Phase-III-A on BOT basis - Request for permission for laying Optical Fiber Cable along NH-53 (Old NH-6) from km 485.000 to km 480.000 for total length of 5 km in the State of Maharashtra
  • NHAI-RO Kerala- Four laning of Thiruvananthapuram bypass from Kazhakuttam-Mukkola(Km.0+000 to Km.26+500) section of NH-47(New NH-66) under NHDP Phase-lll in the State of Kerala-Laying of LT Poles at Km.8+405 and Km.8+450 by KSEB Ltd.
  • Permission for lay Optical Fiber Cable along Maharaja Chowk Manpur to Kohka Chowk, Ms: Kms 103.00 to Ms:Kms115.00 on NH-930, total section length ROW applied for 12.00 Kms in the State of Chhattisgarh
  • Proposal for laying of OFC by M/s Vindhya Telelinks Ltd from km 37.500 to 73.750 along Sironcha-Atmakur road section of NH-353C in the state of Telangana
  • Proposal for grant of access permission to M/s Bharat Petroleum Corporation Ltd. Proposed Retail Outlet at Km. 93+309 (RHS), NH-51, Tura-Dalu Road at village/Town- Chandmari, Tehsil-Tura, District- West Garo Hills, Meghalaya
  • Proposal for ROW Permission for 7 Nos. of Crossing of 1650mm Dia Water Pipeline at (i) Km 15+500, (ii) Km 16+900, (iii) Km 37+100, (iv) Km 40+500, (v) Km 41+600, (vi) Km 47+190, (vii) Km 49+850 (Total Crossing Length=475m) of NH-8E (New NH-51) by M/s. Gujarat Water Infrastructure Ltd. (GWIL-Barvala) from Budhel-Borda (NC-41), District- Bhavnagar in the state of Gujarat
  • Proposal for ROW Permission for laying proposed 6” dia Steel Gas Pipeline along NH-47 (Old NH-59) from Km 190+921 to Km 192+523 (Godhra-Dahod-Indore) from TOP (On proposed 6” dia steel Gas Pipeline) to Shakarnagar, Taluka-Dahod, District-Dahod (Dahod GA) in the state of Gujarat
  • Proposal for ROW permission for Overhead Crossing of 220KV/DC Overhead Transmission line across NH-47 (Ahmedabad Godhra Section of Old NH-59) between Km 35+000 and Km 36+000 for 220 KV D/C Kapadwanj Mahemdabad TSS (NHRCL) Line
  • NHAI - RO Hyderabad - PIU Hyderabad- Proposal for Permission for laying of Natural Gas Pipeline for a total length of 3.46 kM along National Highway from Km.54/300 to km.55/700 (LHS) & Km.55/700 to Km.57/700 (RHS) through Open trench laying and HDD crossing at Km. 55/700 across the National Highway by HDD method on Hyderabad -Vijayawada section of NH-65 in the State of Telangana
  • Proposal for grant of permission for laying of Optical Fiber Cable (OFC) along & across the National Highway at Km 682.000 to Km 683.600 (Kolhapur Corridor), Km 683.600 to Km 684.700 (Satara Corrdidor) Total Length-2.7 Km & crossing at Km 683.600 on NH-48 (Old NH-4)
  • Proposal for grant of permission for laying proposed OFC line of M/s Airtel/Telesonic Networks Ltd Mumbai, along and Across on Parbhani - Gangakhed (Matpur Phata) road NH- 752K at Km, 32/200 to 34/900 total length 2.700 Km, and crossing at Km, 32/200, in the State of Maharashtra
  • Proposal for ROW permission for crossing of 110mm HDPE PLB Pipe and 11KV XLPE Cable for Electricity services of Uttar Gujarat Vij Company Limited across NH-27 at Km 603+805 in the state of Gujarat
  • Proposal for ROW permission for permission of laying 30” Dia Crude Oil Pipeline (Mundra- Gujarat to Rajasthan Refinery-Pachpada, Barmer, Rajasthan) along with OFC across to proposed NH-754K Economic Corridor (Jamnagar-Amritsar) at Km 114+777 of NH-754K in District-Patan in the state of Gujarat
  • NH final access permission to the fuel station (Retail Outlet) located on a plot of land abutting on the right hand side of boundary of NH-31 towards increasing chainage in Km 1097.375 at Kalajal in village Baihata , Mouza Madartoal, P.O. Baihata, P.S: Kamalpur, District: Kamrup (Rural), Assam, Pin-781380
  • NHAI, PIU, Krishnagiri - Laying of Underground OFC along the road from km.2/800 to km.6/000 (LHS&RHS) crossing at km.3/000, km.3/560,km.5/540, km.5/545, km.5/550 & km.6/000 on Krishnagiri - Walajahpet section of NH-48 (Old NH-46) by M/s. Jio Digital Fibre Pvt Ltd
  • Obtaining permission for laying pipelines along with National Highway no. 31 & three number of jack pushing of JICA assisted Guwahati Water Supply project
  • Proposal for grant of NOC for laying Gas Pipeline along NH-11 from Ch. 23.800 to 33.150 (RHS) and 2 nos. crossing at Ch. 23.840 & Ch. 34.600 in Tehsil-Kiraoli, Distt.-Agra in the state of Uttar Pradesh by M/s. GAIL Gas Ltd.
  • Proposal for grant of permission for lay OFC along NH-27 (Old NH-76) from Ch. 218.300 to 306.60 (Km. 218.3 to 227, Km, 229.8 to 245, Km, 259 to 267.2 and Km. 282.7 to 306.6) (Total length=56.00 Km.) in the state of Rajasthan for NFS project by M/s. Kiran Infra Engineers Ltd.
  • Permission for laying of Rural Water Supply (RWSs) Pipeline in Dunguripali & Binika Block of Sonepur District along the NH-26 from km 30/400 to 31/100 (LHS), km 32//871 to 33/271 (LHS), km 30/705 to 33/599 (RHS), km 33/915 to 35/609 (RHS), km 35/625 to 36/683 (RHS), km 34/886 to 35/609 (LHS), km 35/625 to 36/601 (LHS), km 37/100 to 38/152 (RHS), km 40/668 to 40/868 (RHS), km 38/152 to 41/338 (LHS) across the NH-26 at km 30/705, 33/871, 35/423, 35/625, 37/378, 38/152, 39/926 & 40/668
  • NHAI-RO Kerala- Four laning of Thiruvananthapuram bypass from Kazhakuttam- Mukkola (Km.0+000 to Km.26+500) section of NH-47(New NH-66) under NHDP Phase-lll in the State of Kerala- Permission for laying Optical Fibre Cable from Km.2/770 to Km.6/320 (LHS) and crossing ROW at Km.2/770 to M/s Telesonic Networks Ltd (Airtel) in Thiruvananthapuram Bypass
  • Permission for laying of 100 mm diameter sewer pipeline through casing pipe of 500 mm diameter along NH from km 299.977 to km.302.373, km 304.740 to km.306.582 and km 305.228 to km 305.346 at Km.79.045 (LHS to RHS) and crossing across NH at km 301.304, km.305.346 and km.306.582 along new NH-07 in Rajpura - Patiala section in District-Patiala in the State of Punjab by HDD method
  • Proposal for NOC permission for laying of Sewer pipeline along NH-96(330) from Km. 145.00 to km.145.845 and Km.145.900 to km.146.200 in Prayagraj - Faizabad section in the State of Uttar Pradesh
  • Proposal Rehabilitation and Up-gradation of Pune - Poud - Mulshi - Mangaon - Mhalsa - Dighi Port - Indapur (NH-66) Tala - Mandad - Agardanda - Dighi Port (SH-96 & SH-92) Section from Indapur to Agardanda total length of 42.345 Km, two lane with Paved Shoulder Configuration - in the state of Maharashtra - Jio Digital Fiber Pvt. Ltd. - Permission for laying of Optical Fiber Cable having 11.200 Km, along Kude Majgaon Ch.14/600 to 25/800 (from Mandad Police Check Post to Tala Junction Bus Stop) Applicant: M/s Jio Digital Fiber Pvt. Ltd 3rd floor, Marker Chambers IV, 222, Nariman Point, Mumbai 400021
  • Proposal for grant Permission for laying 33 KV Electrical Cable UG, OH along in between Sinnar - Ghoti - Trimak - Jawhar Road and (1 crossing) open trenching works for laying 33 KV Lelectrical Cable duct/cable along NH Jurisdiction on NH-160A, Sinnar - Ghoti - Trimbak - Jawhar road (RHS) from Ch. Km, 96/700 to Km, 97/400, total length of 750.00 Mtr, in the State of Maharashtra. Applicant: Executive Engineer, MSEDCL, Nashik Urban -II Division, Hanuman Nagar, Jail Road, Nashik Road
  • Proposal for grant of permission for laying HDPE Pipe for UG crossing of 11KV Electric line at Km. 204.265, NH-21 (Jaipur-Dausa section) in the state of Rajasthan by M/s. Sencey Trade Sohttion Pvt. Ltd.
  • Proposal for grant of NOC for laying of Gas Pipeline of M/s. Indraprastha Gas Ltd. (IGL) (125mm dia MDPE Pipe) from Km. 86,475 to 91.530 (LHS) (length 5055m) and three nos. crossing at Km. 89.165 (length 77.10m), Km, 90.975 (length 62.10m) & Km. 91.530 (length 62.10m) and 110m length extra from Bus-bay and entry/exit (Total length 5366.30m) along NH-8 (New NH-48), Delhi-Jaipur Road in the state of Haryana
  • Proposal for grant of access permission to proposed retail outlet of M/s BPCL on Raj. Border-Fatehpur-Salasar sec. of NH-65 (New NH-52) at Km. 107+262 to 107+297.43 (RHS), in old Khasr No. 198 & new Khasra no. 360/359 of the Village-Dewas in the Taluka of Ramgarh Shekhawati, Distt-Sikar in the state of Rajasthan
  • Proposal for grant of permission for crossing for laying of water supply pipeline on Jaipur-Tonk-Deoli section of NH-52 at various locations from Km. 77.100 to 88.600 (total length 23803 mtr.) by RUIDO Package-RUIDP/Tonk04 in the state of Rajasthan
  • NOC for O/H crossing of NH-91 with 400 KV DC (Twin Moose) Khurja (STPP) - Aligarh (PG) Tr. Line at Ch.104.255 (THDCIL) near Village - Unchagaon, Tehsil - Khurja, Distt.- Bulandshahr in the State of Uttar Pradesh
  • NOC for O/H crossing of NH-91 with 400 KV DC (Twin Moose) Khurja (STPP) - Aligarh (PG) Tr. Line at Ch.101.070 (THDCIL) near Village - Jahanpur, Tehsil - Khurja, Distt.- Bulandshahr in the State of Uttar Pradesh
  • Permission for laying of 220 KV 07 x 1000 mm2 copper cable across NH-19 (Ch.468.880) length 60 mtr. at Barra gaon Chauraha near 80 ft. road Kanpur through HDPE pipe 225 mm dia submitted by U.P Power Transmission Corporation Ltd.
  • NHAI, Madurai Region - PIU, Madurai - Operation and Maintenance of Madurai - Kanyakumari section from Km.0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu - Permission for laying of Water Pipeline along the road from Km.50+450 to Km.50+850 (RHS), Km.77+500 to Km.79+130 (RHS), Km.78+100 to Km.79+130 (LHS) & Km.80+500 to Km.80+800 (LHS) and Across the road at Km.50+450, Km.78+100, Km.78+250 & Km.78+710 of Madurai - Kanyakumari Section of NH-44 (Old No. NH-7) - Proposal submitted
  • Permission for laying of Optical Fiber Cable (OFC) of M/s. Bharat Sanchar Nigam Ltd from Ch. 0.000 to 23.500 (LHS) along ROW on NH-24 (Delhi Ghaziabad Hapur Road) in the state of Delhi & Uttar Pradesh
  • NHAI, Madurai Region - PIU, Madurai - Four laning of Melur (Design Km.0+000 / Existing Km.99+920 of NH-38) to Karaikudi (Design Km.45+855 / Existing Km.12+900 of NH-383 Ext) on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu - Permission for laying of Water Pipeline from Km.37+950 to Km.39+750 (LHS) and from Km.6+700 to Km.7+200 (LHS) of Existing SH-191A (Kummangudi to Koviloor road) of Melur to Karaikudi Section of NH-338, 383 & 38 in the State of Tamil Nadu - Proposal submitted
  • NHAI, Madurai Region - PIU, Madurai - Four laning of Thirumangalam - Rajapalayam section from Km.0/000 to Km.71/600 of NH-744 in the State of Tamil Nadu - Permission for laying of Sewerage Pipeline from Km.63+400 to Km.67+600 (RHS), Km.63+600 to Km.67+600 (LHS) and across at Km.67+000, Km.66+650, Km.65+900, Km.64+600 and Km.63+600 of Thirumangalam - Rajapalayam section of NH-744 in the State of Tamil Nadu - Proposal submitted
  • Permission proposal for laying underground Water pipe line along the National Highways from Km 276/320 to 277/235,Km 277/700 to 280/010(LHS), Km 281/825 to 282/218(LHS) Km 290/970 to 292/080(LHS),Km292/136 to Km 299/136(LHS)Km 280/776 to 282/000(RHS),Km 295/300 to Km 295/333(RHS),Km 295/800 to 296/044(RHS) and crossing at Km 276/320,Km 277/820,Km 279/333,Km 281/825,Km 295/333,Km 295/800, Km 297/614 & Km 298/684 of NH-948 in the state of Tamil Nadu
  • NHAI, Madurai Region - PIU, Madurai - Operation and Maintenance of Madurai - Kanyakumari section from Km.0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu - Permission for Erection of 230 KV Over Head Electrical line crossing at Km.195/300 in Vagaikulam village in Madurai - Kanyakumari section of NH-44 - Proposal submitted
  • Permission for the install/crossing of Overhead 66K V S/C Transmission line of M/s Gujarat Energy Transmission Corporation Limited across NH-58 at km 128/100 to km 128/200 for the Total Project Length as 30.00 m, in the State of Gujarat
  • NHAI, Madurai Region - Highway Administration - Permission for laying of water Pipe line under PIU, Karaikudi - laying Water pipe line by TWAD Board, Project Division, Sivagangai Along the Road at from Km.148/380 to Km152/600 (RHS); Km 152/600 to Km. 153/330(BHS); Km. 153/330 to Km.153/480(RHS) and Across the road at Km. 151/530; Km. 153/020 & Km.153/330 by open trench & HDD method in Thirumayam - Manamadurai section of NH-226 in the state of Tamilnadu
  • NHAI, Madurai Region - Highway Administration - Permission for laying of water Pipe line under PIU, Karaikudi - laying Water pipe line by TWAD Board, Project Division, Karaikudi Along the Road at Km86/800 to 91/054 (RHS) by open trench method in Trichy - karaikudi section of NH-210 in the state of Tamilnadu
  • NHAI, Madurai Region - Highway Administration - Permission for laying of water Pipe line under PIU, Karaikudi - laying Water pipe line by TWAD Board, Project Division, Karaikudi Along the Road at Km.71/899 to Km.91/054 (RHS) & Km.76/286 Km. 76/686 (LHS) by open trench method & across at 10 locations by trenchless method in Trichy - Karaikudi section of NH-210 (New NH 336, 36 & 536) in the state of Tamilnadu
  • NHAI, Madurai Region – Highway Administration – Permission for laying of water Pipe line under PIU, Karaikudi - laying Water pipe line by TWAD Board, Project Division, Karaikudi 63mm dia HDPE pipe line along the road from Km. 94/400 to Km.95/900 (RHS); 140mm dia HDPE pipe along the road from Km.105/200 to Km.110/000 (RHS) by open trench method & across the road at Km.94/400; Km.96/000; Km.97/300; Km.106/700; Km.109/400 & Km.110/000 by trenchless method in Thirumayam - Manamadurai section of NH-226 in the state of Tamilnadu
  • NHAI, Madurai Region – Highway Administration – Permission for laying of water Pipe line under PIU, Karaikudi - laying Water pipe line by TWAD Board, Project Division, Karaikudi 63mm dia HDPE pipe Along the Road at Km 113/850 to 114/600 (LHS), 50mm dia HDPE pipe from Km.114/600 to km.114/780 (LHS) by open trench method & across the road at Km.114/600 by trenchless method in Thanjavur - Manamadurai road of NH-226 in the state of Tamilnadu
  • NHAI, Madurai Region – Highway Administration – Permission for laying of water Pipe line under PIU, Thanjavur - laying Water pipe line by M/s. EE, TWAD Board, RWD Division, Cuddalore Along the Road at from Km.49+700 to Km50+900 (LHS); Km 52+000 to Km.54+800(RHS) and Across the road at Km.50+400; Km.54+450 & Km.54+650 by open trench & HDD method in Vikravandi - Sethiyathope section of NH-45C in the state of Tamilnadu
  • NHAI - PIU, Salem - Proposal for laying of underground Optical Fiber Cable (OFC) by HDD Method along 3the NH-68 from Km 81/200 to km 81/800 (RHS) - 600m, Km 92/600 to Km 92/900 (RHS) - 300m, Km 97/200 to 97/400 (RHS) - 200m and across the road by HDD Method at Km 81/800 - 60m, Km 92/600 - 60m by M/s Telesonic Networks Limited, Chennai - Approval requested
  • NHAI - PIU, Salem - Proposal for laying of underground Optical Fiber Cable (OFC) by open excavation of 40mm Dia pipe along the NH-7 from Km 228/100 to Km 230/200 (RHS) and across the road by HDD Method at Km 230/200 - 60m by M/s Telesonic Networks Limited, Chennai - Approval requested
  • Proposal Karla and 7 villages regional rural water supply scheme Tal. Maval, Dist Pune. Location of the proposed DI water pipeline is along NH-48 from Km, 57/00 to 61/00, in the State of Maharashtra. Applicant; Executive Engineer, Maharashtra Jeevan Pradhikaran - Divi-02 - Pune-1.
  • Proposal Permission for trenching and PLB duct for laying of Optical Fiber Cable from Km, 63/405 to Km, 75/500 and 79/300 to 112/000 for Lonavala - Panvel OFC route under NOFN Project - Reg. Applicant: M/s Division Engineer, Bharat Sanchar Nigam Limited, Tele., OFC, Dn - ll, Administrative Bldg., 4 th floor, B- Wing, Juhu Danda, Juhu road, Santacruz (W) Mumbai: 400054.
  • Proposal for ROW Permission for Wankaner City & Surrounding Area Gas Distribution Network-Wankaner City PE Pipeline Extension (Wankaner Overbridge to Wankner City Connectivity) of NH-27 from Km 210+403 to Km 210/640 in (LHS) (Length 237 Mtr) along the pipeline route in District Morbi in the state of Gujarat.
  • Proposal for ROW Permission for laying 125mm Dia PE Pipeline on NH-27 (Morbi- Samakhiyali Road) from Km 254+315 to Km 254+537 (RHS) (Length=0/222 Km) along the pipeline route in District Morbi to supply Natural Gas (Gas Distribution Network in Morbi District- Marquina Ceramic Connectivity) from existing pipeline near Finstone Granito in Village-Gala in Taluka/District Morbi in the state of Gujarat.
  • Proposal for ROW Permission for laying 6” Dia Steel Pipeline to connect Bhakti Fuels, near Village-Dhoraji City, Tal-Dhoraji, Dist-Rajkot for Dhoraji Taluka & Surrounding Area Gas Distribution Network in Rajkot District (Bhakti Fuel - |IOCL OMC- CNG Connectivity) across to NH-27 (Rajkot-Porbandar Section) at Km 99+430 along the pipeline route in Taluka Dhoraji District Rajkot in the state of Gujarat.
  • Proposal for ROW Permission for laying 125mm Dia PE Natural Gas Pipeline at NH-27 (Morbi-Samakhiyali) from Km 241+500 to Km 244+815 (LHS) (3315m) (Looping of Oasis Vitrified to Bharatnagar Village (Fonic Colour Connectivity) along the pipeline route in District Morbi for supply of Natural Gas to various en-route village/industries situated in Taluka Morbi & Surrounding area in District Morbi in the state of Gujarat.
  • Projects comprising of 9 NH stretches (Bundle-1) Bamanbore-Garamore (Km 182+600 to Km 254+537) section of NH-27 in the state of Gujarat on Toll, Operate, Maintain & Transfer Mode. Reg. Proposal seeking ROW permission for laying OFC Cable (4G Project) along the route Km 196+450 to Km 198+652 (Total Length 2202 Mtrs) on LHS, near Jodhpur Village on Bamanbore-Morbi section of NH-27 in the state of Gujarat.
  • Proposal for ROW Permission for parallel laying of GWSSB 200mm Dia DI Water Pipeline from Km 52+750 to Km 54+990 (Total Length=2240m) by Gujarat Water Supply & Sewerage Board-Bhavnagar (GWSSB) Talaja to Pasvi, Taluka-Talaja, Dist-Bhavnagar in state of Gujarat.
  • Proposal for ROW permission for laying proposal 8“dia Steel Gas Pipeline from GSPL DJPL SV-5 to IOCL Petrol Pump along NH-8E (NH-51) (From Km 50+986 to Km 52+210 (LHS)= 1223.50 m) and across NH-8E(NH-51) Km 51+425 (13.82m) bypass NH Road at Talaja of Taluka-Talaja, District Bhavnagar of Bhavnagar GA in the state of Gujarat.
  • Proposal for ROW permission for laying 66 KV 1Cx630 sqmm Power Cable along NH-48 from Km 81+780 to Km 82+365 (LHS) and Across NH-48 between Km 82+365 and Km 82+425, near Village-Mogar, Taluka & District-Anand on Ahmedabad-Vadodara section of NH-48 in the state of Gujarat.
  • Six Laning from existing Km. 494+410 to existing Km. 509+550 of NH-8 in the state of Gujarat on EPC Mode under NHDP Phase-V (Package- VII): Reg. Proposal for ROW permission for laying 8” Dia Steel Gas Pipeline across NH-48 at Km 555+250 on Mota Chiloda to Nana Chiloda section of NH-48 in the state of Gujarat.
  • RoW permission for installation of Smart Elements (CCTV Cameras, Traffic Signals, SVDS, etc) on cantilever pole and Gantry at Puri Road- Daya River Bridge· Lingipur Chowk JKm.11+450) on NH·316 and Palasuni Chhak (Km.3+275) on NH·16 under smart solutions project Of Bhubaneswar Smart City Limited
  • NH access permission to the proposal Fuel station (retail outlet) located on a plot of land abutting on the Left hand side boundary of NH-31(old)/27 (New) towards increasing chainage in Km. 1026.0228 at location village/ town : Rajakhat in the Taluka / Mouza of Bhawanipur Revenue circle : Sarupeta, PO: Bhawanipur, PS: Barpeta, District: Barpeta, Assam Pin-781352.
  • Permission for laying of 200 mm diameter sewerage pipe from km 53.440 to km 55.000 (LHS) and km 53.700 to km 54.500 (RHS) along NH-503 A in Amritsar Tanda section at Tehsil Batala , District-Gurdaspur in the State of Punjab by open cut method.
  • Laying of OFC (Aerial) on valley side from Km 85.500 (Chakori) to Km 66.000 (Raiagar) along NH-309A for Total length of ROW is 19.500 Kms in Pithoragarh District in the State of Uttrakhand
  • NHAI - RO Hyderabad - PIU Nirmal- Proposal for laying of Optical Fiber Cable for a total length of 7.540 Km from Km.447+700 to Km.448+680 (RHS),from Km.449+210 to Km.450+475 (RHS), from Km.452+225 to Km.453+500 (LHS), and from Km.457+240 to Km.461+140 (RHS) along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.453+500, & Km.458+200 on Nagpur to Hyderabad section of NH-44 in the State of Telangana
  • NHAI-RO Kerala- Six Laning of Thaliparambha- Muzhapilangad section from Km 137.900 to Km. 170.600 of NH-17 (New NH-66) (project length 29.948 km) in the State of Kerala on Hybrid annuity Mode under BharatmalaPariyojana-Laying of OFC cable of M/s Kerala State IT Infrastructure Ltd for KFON Project along Valapattanam Bridge for 450 m on existing NH-66 in Kannur District , etc.
  • Application for Granting the permission to lay various sizes of HDPE pile (each pipe carry 11 KV electric cable line) and 40 mm dia PLB Duct (carry optical fiber cable) for the project of M/s L&T Ltd. along NH-8 (New NH- 48) in District Gurugram.
  • Proposal for grant permission for laying Steel Gas Pipeline along on Pune - Nashik Road NH-60 Km,190/200 to Km, 198/200, Km, 177/000 to 185/500 Right side going towards Nashik and Crossing at Km, 197/500 Total length 16.5 Km, in the state of Maharashtra. Applicant: M/s GA, Maharashtra Natural Gas Ltd, A-Block, Plot No.27, Narveer Tanajiwadi, PMPML Commercial Building Shivajinagar Pune-411005.
  • Proposal for grant permission for laying Steel Gas Pipeline along on Pune - Nashik Road NH-60 Km,202/350 to Km, 204/500, Km, left side going and 204/500 to 205/000 RHS side and Crossing at Km, 202/350, 204/500 Total length 7.120 Km, in the state of Maharashtra. Applicant: M/s GA, Maharashtra Natural Gas Ltd, A-Block, Plot No.27, Narveer Tanajiwadi, PMPML Commercial Building Shivajinagar Pune-411005.
  • NOC case for laying of Electrical Cable (25 KV U/G 4 Copper Cables) outer ⌀ of 1 cable 240 Sq. mm. of M/s Delhi Metro Rail Corporation Ltd., from Exist Ch. 11.238 (Design Ch. - 00.178 (LHS) to Exist. Ch. - 11.390 (Design Ch. - 00.330 (LHS) (Total length 152 m) on NH-8 (new NH-48 ) Delhi to Gurugram road, in the State of Delhi.
  • Laying of underground of OFC pipeline (40 mm dia) and OFC pipeline of [M/s Railtel Corporation of India Ltd.] from (Ch. 13+951 to Ch. 20+025) total section length for ROW applied is 6074 on along [Delhi Gurgaon road] National Highway No. NH-48 [old NH-8] in the State of Haryana.
  • NHAI, PIU, Coimbatore - Permission to lay underground 750mm dia Drainage Pipe Line in the stretch 6-laning from Km 102.035 to Km 144.680 on the Chengapalli to start of Coimbatore Bypass and 4-laning from Km 170.880 to Km 183.010 on end of Coimbatore bypass to TN/Kerala Border section of NH-47 (New No.NH-544) along the road from Km 126/955 to Km127/255 (RHS) for a total length of 300 m in the limits of National Highways by the Block Development Officer, Avinashi
  • (R&B) NH Circle, ATP - (R&B) NH Division, Kadapa - Proposal for laying APTRANSCO EHV UG cables by HDD method (Horizontal Directional drilling of (1) (i) 220 KV Renigunta - GD Nellore DC line and (ii) 132 KV Renigunta - Chittoor SC line crossing on NH-71 at km 122/8 near Yellamma Temple by APTRASCO in the State of Andhra Pradesh
  • Permission for laying of GAIL's proposed 24" Gas pipeline along with OFC Cable across National Highways-548A at 4.145 Km, NH Chainage &.25.576 Km pipeline chainage in District fatting enroot Mumbai to Nagpur Pipeline in Thane District, in the state of Maharashtra
  • Permission proposal for laying underground 200mm dia GI treated waste water pipe line along the extreme end of National Highways boundary from Km 156/300 to 157/636(RHS) and crossing at Km 156/300 of NH-544 in the state of Tamil Nadu
  • Permission for laying of proposed 6”dia. Steel & 125 mm dia. MDPE Gas Pipeline in the same trench along NH-734 from km.0.00 to km.2.350 and crossing at ch.0.190, ch.0.490, ch.0.830, ch.1.150, ch.1.680 & ch.2.250 to develop CGD network in Moradabad district in the State of Uttar Pradesh
  • NHAI, RO-Kerala - Laying / Crossing of OFC cable of M/s Kerala State IT Infrastructure Ltd. for KFON Project in the state of Kerala
  • Crossing of 220 KV D/C line from 765 KV substation PGCIL Bhiwani to 220KV substation Bhiwani (Against Risk Purhcase) against contract no. HDP-2417/REC-248/XEN/WB dated 09.07.2019 NH-148B crossing profile between TL No. 31-32 for approval- crossing thereof
  • NHAI - RO Hyderabad - PIU Sangareddy-Proposal for laying of Optical Fiber Cable for a total length of 34.142 Km from Km.5+632 to Km.8+520 (LHS), from Km.8+520 to Km.11+830 (LHS), from Km.11+820 to Km.12+590 (RHS), from Km.12+590 to Km.17+257 (RHS), from Km.12+590 to Km,12+618(LHS), from Km.15+000 to Km.15+119 (LHS), from Km. 17+060 to Km.18+400 (LHS), from Km.18+510 to Km.20+510 (LHS), from Km.21+080 to Km.22+880 (LHS), from Km.22+880 to Km.28+580 (LHS), from Km.28+580 to Km.29+930 (LHS & RHS), from Km.29+930 to Km.32+930 (RHS), from Km,.32+930 to Km.38+030 (LHS), along NH-161 by Open trench Methodology and Highway crossings by HDD methodolo-gy at Km. 7+132, Km. 11+830, Km.12+590, Km.15+119, Km.17+257, Km.24+280, Kim.28+580, Km.29+930, Km.38+030 & Km.39+900 on Kandi lu Ramsanpalle section of NH-161 in the State of Telangana
  • Proposal for ROW Permission for laying parallel of Water Supply Pipeline from Km 430+200 to Km 491+200 on NH-27 in Deesa to Samakhiyali National Highway (Radhanpur and Santalpur Regional Water Project-RAS) in the state of Gujarat
  • Proposal for ROW Permission for crossing of Water Supply Pipeline at Km 478+450 on NH-27 in Deesa to Samakhiyali National Highway (Radhanpur and Santalpur Regional Water Project-RAS) in the state of Gujarat
  • Proposal for ROW Permission for laying parallel of Water Supply Pipeline from Km 485+900 to Km 486+400 on NH-27 in Deesa to Samakhiyali National Highway (Radhanpur and Santalpur Regional Water Project-RAS) in the state of Gujarat
  • Proposal for ROW Permission for laying parallel of Water Supply Pipeline from Km 477+500 to Km 478+500 on NH-27 in Deesa to Samakhiyali National Highway (Radhanpur and Santalpur Regional Water Project-RAS) in the state of Gujarat
  • Proposal for ROW Permission (Hadamtala Industry Connectivity-Option-Il) for laying 8” Dia Steel pipeline parallel to NH-27 (Old NH-8B) (Rajkot-Gondal Section) from Km 165+535 to Km 152+710 Km. (L=12/825 Kms) to set up a Gas Distribution Network in Rajkot & Surrounding Area in Rajkot District- Pipeline laying along the pipeline route in Taluka Kotada Sangani & Gondal in District: Rajkot in the state of Gujarat
  • Proposal for Re-Routing & Extending permission for laying 4” dia Steel Natural Gas Pipeline along to NH-48 from Km 206+946 to Km 206+198 in Between Kapodara & GIDC Ankleshwar in Dist.: Bharuch in the State of Gujarat
  • Proposal for ROW permission for laying of 350 mm Dia pipeline parallel to NH-48 from Km 366+620 to Km 367+030 on RHS and Crossing of 900 mm Dia Pipeline at Km 367+030 of NH-48 under the scheme of Underground Sewerage Line in District-Vapi in the state of Gujarat
  • Proposal for ROW Permission for Right of way for laying of 450mm Dia Sewer Pipeline along the NH-48 from Km 271+010 to Km 271+700 on LHS and Crossing at Km 271+010 & Km 271+770 at Village-Makhinga, Taluka-Palsana, District-Surat in the State of Gujarat
  • Proposal for RoW permission for laying of OFC through underground(HDD) method from km 57.40 Telipara Chowpathi to km 88.66 near Hashimara bypass via Birpara Chowpathi on AH-48, Total length-31.260km of Telesonic Networks Ltd., Block- DN, Salt Lake, Kolkata
  • Proposal for RoW permission for laying of OFC through underground(HDD) method from km 45.150 to km 50.145 near Angara Bhasa Bridge on AH-48, Total length- 4.995 km of Telesonic Networks Ltd., Block-DN, Salt Lake, Kolkata
  • Crossing of 220 KV D/C line from 765 KV substation PGCIL Bhiwani to 220KV substation Isherwal against contract no. HDP-2417/REC-248/XEN/WB dated 09.07.2019 NH-148B crossing profile between Old TL No. 26-27 for approval- crossing thereof
  • Permission for laying of OFC cable on NH-316 (Puri - Konark link) from km 60/000 to 74/600 (LHS) Matiapada Square - RailTel Manhole Chamber to DRDO Center, Govt. of India, Gadabangar, Puri, Odisha
  • NHAI - RO-Madurai - PIU, Trichy – Proposal for laying of Water supply pipeline along NH from Km 1/775 to Km 2/017 (LHS), Km 3/750 to Km 3/972 (LHS), Km 3/972 to Km 4/270 (LHS), Km 4/991 to Km 5/250 (RHS) & across the NH at Km 2/017, Km 3/870 & Km 5/250 at Trichy – Madurai Section of NH-45B for a length of 1288.50m for providing Under Ground Sewerage Scheme to Tiruchirappalli City Corporation under Phase-III works in the State of Tamil Nadu - Proposal submitted
  • NHAI, Madurai Region - PIU, Trichy – Permission for the proposal of laying of Water Supply Pipeline along NH from Km 45/321 to Km 45/400 (RHS), Km 45/288 to Km 45/400 (LHS) by Open Trench Method & across the NH at Km 45/400 by HDD method near Kallamedu junction at Trichy – Madurai Section of NH-45B (New NH- 38) in the State of Tamil Nadu - Proposal submitted
  • NHAI, Madurai Region - PIU, Trichy – Permission for the proposal of laying of Water Supply Pipeline along NH from Km 357/865 to Km 358/025 (RHS) by Open Trench Method & across the NH at Km 358/025 by HDD method near Muthapudaiyanpatti Village at Trichy – Dindigul Section of NH-45 in the State of Tamil Nadu - Proposal submitted
  • 4-laning of Warora- Wani section of NH-930 from km 313+850 to km 332+160 in the state of Maharashtra on EPC mode - Permission for proposed Warora- Warangal and Chilakpuripeta - Hyderabad Kurnool 765kV EHV line crossing the project highway NH-930 at km 328+740 near Village Naigaon, Tah. Wani, Dlst. Yavatmal
  • Paradip - Siliguri - Numaligarh Crude Oil Pipeline Project: Permission for laying NRL's 26" Dia (660mm) Crude Oil Pipeline along with Optic Fibre Cable through HAB Method across NR-31D & NH-31in the following chainage: between Km 22.490 and 22.510 of NH-31D, between Km 66.900 and Km 66.920 of NH-31D, between Km 10.550 and Km 10.570 of NH-31D & between Km 533.190 and Km Km 533.210 of NH-31
  • Proposal of BSNL for laying of OFC from DVC More ( Km 499.300) to the new 6-lane / Old 4-lane crossing point near Kingstar resort (Km 514.430) for total length of 15.130 Kms Approximately along NH-2 in the district of Paschim Bardhaman
  • Proposal for laying of underground 2 nos Natural Gas Supply Pipeline of Indian Oil Adani Gas Pvt Ltd along NH-19 (old NH-2) in the following stretches from Km 477.450 to Km 480.375 (RHS), Km 480.375 to Km 482.500 (LHS), from Km 482.500 to Km 489.150 (RHS) & crossing at Km 480.375, Km 482.500, Km 488.400 & Km 489.150, Dist - Paschim Bardhaman, West Bengal
  • Proposal of Indial Oil - Adani Gas Pvt Ltd for laying of underground 2 nos Natural Gas Supply Pipeline along NH-2 in the stertches - i) from Km 489.150 to Km 490.450 (LHS), ii) from Km 490.450 to Km 492.2800 (RHS), iii) from Km 501.345 to Km 502.013 (RHS), iv) from Km 505.600 to Km 506.888 (LHS) and across NH-19 (Old NH-2) at Km 490.450, Km 492.280, Km 501.345 & Km 505.600 in District - Paschim Burdwan, West Bengal
  • Laying of underground of OFC pipeline (40 mm dia) and OFC pipeline of [M/s Railtel Corporation of India Ltd.] from (Ch. 13+951 to Ch. 20+025) total section length for ROW applied is 6074 on along [Delhi Gurgaon road] National Highway No. NH-48 [old NH-8] in the State of Haryana
  • Proposal for Permission for laying Gas pipeline of 12” dia steel pipeline by M/s AGP Gas Pvt. Ltd. along the NH-544E road from km 26/939 to km 58/539 (LHS) of Kodikonda - Madakasira - Sira road of NH-544E for a total length of 31.60kms in Ananthapur District in the State of Andhra Pradesh
  • NHAI-PIU-Kolhapur - Proposed Four laning of Ratnagiri - Kolhapur section of NH - 166 from Km 0/000 to Km 137/285 in Ratnagiri and Kolhapur Districts - Permission for laying of Optical Fibre Cable along & across on NH-166 at Km 19.000 to Km 19.500 (LHS), Km 19.000 to Km 19.500 (RHS) & crossing at Km 19.000 and 19.500
  • Four laning of Goa-Karnataka Border to Kundapur section of NH-66 (formerly NH-17) from Km. 93.700 to Km. 283.300 in the State of Karnataka to be executed as BOT Project on DBFO Pattern under NHDP-IV: Proposal for laying water supply pipeline parallel & Crossing to NH-66 from Panjim to Mangalore road at several lovations between Km.108+560 to Km.133+810 of NH-66 in Karwar-Ankola town under providing dedicated water supply scheme(21.0MLD) to seabird, Naval Base, Karwar in the state of Karnataka