  • Six Laning from existing Km. 494+410 to existing Km. 509+550 of NH-8 in the state of Gujarat on EPC Mode under NHDP Phase-V (Package- VII). - Proposal for ROW permission for laying 8” Dia Steel Gas Pipeline across NH-48 at Km 541+100 on Mota Chiloda to Nana Chiloda section of NH-48 in the state of Gujarat
  • (i). ROW permission for 39 Km laying Optical Fiber Cable in km. 320 to Km. 334 & Km. 334 to Km. 336 & Km. 377 to Km. 400 in NH-2. (ii). ROW permission for 2.350 Km laying Optical Fiber Cable from M.S. 356/800 to M.S. 359/150 in NH-2
  • NHAI-RO Kerala-4-laned Walayar-Vadakkancherry (Km.182+250-Km.240+000) section of NH-544 on BOT(Toll basis)-O&M Stage and 6 Laning of Vadakkanchery-Thrissur (Km.240+000-Km.270+000) of NH-544 on BOT(Toll) basis-Under construction-Laying of OFC on 40mm HDPE duct in between Km.235+120 to Km.237+500(LHS) of NH544 for a length of 2.080Km by M/s Telesonic Network Ltd. (Airtel)
  • Submission of proposal for laying of GAIL's 24" dia Barauni-Guwahati Natural Gas Pipeline along with 40mm dia OFC Duct/ Cable across NH-31 at km 755.256 in village Dauwaguri, Block- Mathabhanga, District- Coochbehar in the State of West Bengal- initial permission
  • NHAI – RO Hyderabad – PIU Mancherial–Proposal for laying of Optical Fiber Cable from Km.42+000 to Km.68+522 (RHS), from Km.72+000 to Km.84+650 (RHS), Km.87+570 to Km. 90+030 (RHS), from Km.91+240 to Km.92+450 (RHS), From Km.49+975 to Km.55+900 (LHS), from Km.62+960 to Km.62+980 (LHS), from Km.68+050 to Km.68+522 (LHS), Km. 71+700 to Km.72+000 (LHS), from Km.90+040 to Km.91+240 (LHS), along the NH-363 (four laning stretch), from Km.315+358 to Km.31+430, from Km. 315+358 to Km. 317+900 (RHS), from Km.317+900 to Km.319+185 (LHS) on the existing NH-363 by Open trench Methodology and Highway crossings at Km.46+350, Km.47+650, Km.49+965, Km.50+100, Km.54+200, Km.54+800, Km.55+900, Km.58+100, Km.62+950, Km.65+080, Km.67+340, Km.68+000, Km.68+522 (LHS side and RHS side), Km.69+245, Km.72+000, Km.76+300, Km.83+900, Km.84+650, Km..88+500, Km.90+030, Km.90+200, Km.91+240, Km.92+450, Km. 316+370 (existing NH-363), and Km.317+900 (existing NH-363 across the Repallewada to TS/ MH border of NH-363 using HDD method in the State of Telangana
  • NHAI – RO Hyderabad–Proposal for laying of Optical Fiber Cable from Km.12+000 to Km.19+410 (RHS), from Km.19+410 to Km.27+533 (LHS), Km.30+025 to Km.31+600 (LHS), from Km.31+660 to Km.42+000 (RHS), along the NH-363 (four laning stretch), from Km.251+900 to Km.252+600 (LHS), Km.252+606 to Km.258+418 (RHS) on the existing NH-363 by Open trench Methodology and Highway crossings at Km.11+600, Km.12+766, Km.14+240, Km.14+250, Km.17+100, Km.17+110, Km.19+410, Km.23+840, Km.30+025, Km.31+600, Km.34+465, Km.36+010, Km.38+035, Km.38+663, Km.39+150, Km.39+195, Km. 252+606 (existing NH-363), and Km.273+951 (existing NH-363) across the Repallewada to TS/ MH border of NH-363 using HDD method in the State of Telangana
  • Permission for laying of 12" dia Natural Gas Pipeline along with 40 mm OFC by standard HDD method across National Highway-326A at km 100/400 at Village-Kathalkaitha, Tehsil-Paralakhemundi, Dist-Gajapati in the state of Odisha
  • NHAI-PIU-Kolhapur- Four Laning of Satara - Kolhapur to Maharashtra State Border Section of NH-4 from Km 592.240 to Km 725.000 in the State of Maharashtra- Permission for Excavation, lowering, laying and jointing 11 KV, 300 Sq.mm x 3 core Aluminium armored cable parallel to service road of NH-4 from Shiroli MIDC Branch road to Noor Mohmad Masjit (near Kolhapur steel) at Km 618.950 to Km 620.120
  • NHAI-PIU-Kolhapur- Four Laning of Satara - Kolhapur to Maharashtra State Border Section of NH-4 from Km 592.240 to Km 725.000 in the State of Maharashtra- Permission for laying of 33 KV underground cable for crossing at National Highway NH-48 near Perle, Tal-Karad, Dist-Satara
  • Proposal for grant of permission for laying of GAIL’s proposed 24” dia Gas pipeline alongwith OFC Cable across NH-52 (Old NH-211) falling en-route Nagpur to Mumbai Samruddhi Expressway in Aurangabad District
  • Proposal for laying underground Telecom Cable at NH-211 LHS Chalisgaon Road at Km. 450.000 (Ex. Km 445.355) to km 457.231 (Ex. Km 452/800) total length 7.23 km and crossing at kan 450.000 (Ex. Km 445.555)
  • Permission proposal for laying of underground Optical fiber Cable Line along the National Highways from Km 0/000 to 10/825(LHS),Km 10/825 to 19/000(RHS) and crossing at Km 10/825 (New NH-42 having Chainage Km 388/000 to Km 396/175(LHS),Km 396/175 to 407/000(RHS) and crossing at Km 396/175) of NH-219 including 19 test pit of (Krishnagiri to Kuppam TN &AP Boundary) in the state of Tamil Nadu
  • Clearance for 11 KV underground cable crossing the National Highways at Km 12+450 on NH-33 in Hazaribag-Barhi.- route.
  • Proposal for laying Optical Fiber Cables (OFC) at NH-03 LHS Mumbai Agra Highway at km 289.700 to km 290.000 to total length 0.300km for Dhule city along NH-03
  • NHAI, Madurai Region - PIU, Madurai - Operation and Maintenance of Madurai – Kanyakumari section from Km.0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu – Permission for laying of Underground Sewage Pipeline along the road from Km.156+260 to Km.156+420 (LHS), Km.156+260 to Km.156+580 (RHS), Gravity Sewer – Km.156+410 to Km.156+600 (LHS), Km.157+535 to Km.157+565 (LHS), Km.157+535 to Km.157+780 (RHS), Km.159+173 to Km.160+170 (RHS), Gravity Sewer – Km.159+870 to Km.160+160 (RHS), Km.159+658 to Km.159+708 (LHS), Km.159+173 to Km.159+708 (RHS) and Across the road at Km.154+300, Km.156+260, Km.157+535 and Km.159+708 of Madurai - Kanyakumari Section of NH-44 (Old No. NH-7) – Proposal submitted
  • Proposal seeking Permission for laying of OFC cable along NH - 150A from Nagamangala Essar Petrol Pump Km 558.500 to Chinya Km 573.200 on LHS for a total length of 14.70 Kms and one NH crossing at Km 573.200 through HDD method by M/s. Telesonic Networks Ltd.
  • Permission for laying of GAIL's proposed 24" dia Gas pipeline alongwith OFC Cable across National Highway-752I at village Hadas Pimpalgaon, Tal. Vijapur, Dist. Aurangabad at Ch. km. 281.700 in District falling en- route Mumbai to Nagpur Pipeline in Aurangabad District
  • Request for final NOC of fuel station Retail Outlet on a plot of land abutting on the left hand side boundary of NH-6 towards increasing chainage in Km, 8.431 at Location/village: Pahammawlein, PO& PS:Byrnihat, Dist: Ri Bhoi, Meghalaya
  • Permission for laying of crossing underground Electric line on Jaisalmer-Barmer section of NH-68 on Ch.MS 126/885 (25.978205,71.363138) Village Bothia Jageer Tehsil-Barmer, District-Barmer in the state of Rajasthan
  • NHAI, PIU, Krishnagiri- Laying of water pipeline along the road from km.69/928 to km.70/132 (LHS) for a total length of 204m and one road crossing at km.70/132 by trenchless technology of Krishnagiri - Walajahpet section of NH-48 (Old NH-46) by Executive Engineer, TWAD Board, Vellore
  • Proposal for grant of permission for laying of electrical HT Power Cable form Pagalkhana Chowk to NADT Main Gate for length of 350m. in the NH-69 (New NH-47) Nagpur - Saoner - Betul in the State of Maharashtra
  • Rehabilitation and up gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388.376 to Km.428.074) of NH-200 (New NH-53) in the state of Odisha under NHDP-III - ROW permission to lay and road crossing of 50mm dia Oxygen pipeline (Steel) with Casing Pipe (HDPE) of 160mm dia through HDD methodology at chainage 391+400
  • NHAI, Madurai Region - PIU, Madurai - Four laning of Melur (Design Km.0+000 / Existing Km.99+920 of NH-38) to Karaikudi (Design Km.45+855 / Existing Km.12+900 of NH-383 Ext) on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu - Permission for laying of Water Pipeline across the road at Km.14+331 of Melur to Karaikudi section of NH-338, 383 & 38 in the State of Tamil Nadu - Proposal submitted
  • Proposal for ROW permission for laying proposal 8"/6" dia Steel Gas Pipeline from GSPL DJPL SV-5 to JOCL Petrol Pump along NH-8E (NH-51) from Km 52+017 to Km 514425 (LHS)= 592m) and Km 514425 to Km 51+970 (RHS)=545m) and across at NH-51 Km 514425) (60m) bypass NH Road at Talaja of Taluka-Talaja, District Bhavnagar of Bhavnagar GA in the state of Gujarat
  • Proposal for ROW Permission for laying Water Supply Pipeline parallel laying from Km 442+800 to Km 445+500 and Km 463+000 to Km 463+600 and 8 Nos. of Crossing i.e. (1) at Km 453+350, (2) at Km 427+750, (3) at Km 435+350, (4) at Km 448+650, (5) at Km 445+500, (6) at Km 442+800, (7) at Km 463+700 and (8) at Km 435+150 on NH-27, Palanpur to Samakhiyali NH (Radhanpur-Santalpur Pipeline Project) under missing link of Narmada Canal based BK-3, P-2 Regional Water Supply Scheme, Taluka-Santalpur, Dist- Patan in the state of Gujarat
  • Proposal for ROW permission for laying 12” dia Steel Natural Gas Pipeline across NH-27 (Morbi-Samakhiyali Road) at Km 264+926 to supply natural gas to Village Khirai from our existing pipeline near Finstone Granito in Village-Gala, Taluka & District Morbi, Near Village-Vadharva, Taluka Maliya Miyana, Dist.Morbi in the state of Gujarat
  • Proposal for ROW permission for crossing of 66KV LILO Shikarpur line with ACSR Panther Conductor crossing on NH-8A(Extn) at Km 289+910 (between Km 289 to Km 290) Electric Line crossing NH-8A in the state of Gujarat
  • Permission for overhead crossing NH-232A (Unnao - Lalganj) 132 KV Sareni - Raghuraj Singh TSS Line at Ch.54.184
  • NHAI, PlU, Krishnagiri- Laying of Underground OFC existing chainage along the road from km.35/500 to km.381500(LHS), km.50/400 to km.52i430 (LHS) and New Design Chainage along the road from km.49/900 to km.50/170 (LHS) of Thorapalli Agraharam - Jittandahalli section of NH-844 (Package ll) by M/s. Telesonic Networks Limited
  • NHAI, PlU, Krishnagiri- Laying of Underground OFC along the road from km48/700 to km.50/400(RHS) and one road crossing at km.50/400 of Thorapalli Agraharam - Jittandahalli section of NH-844 (Package ll) by M/s Telesonic Networks Limited
  • NHAI, Madurai Region - PIU, Madurai - Four laning of Melur (Design Km.0+000 / Existing Km.99+920 of NH-38) to Karaikudi (Design Km.45+855 / Existing Km.12+900 of NH-383 Ext) on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu - Permission for laying of Water Pipeline across the road at Km.19+130 of Melur to Karaikudi section of NH-338, 383 & 38 in the State of Tamil Nadu - Proposal submitted
  • Proposal for grant of ROW permission for crossing of Optical Fibre Cable (4G project) at Km 304+870 (Total Length 45mtr), near Ashirwad Hotel on NH-27 on Garamore- Samakhiyali section of NH-27 in the state of Gujarat
  • Development of Six-Lane Eastern Peripheral Expressway (NH No. NE- II) Package-I from Km. 1.000 to Km. 22.000 in the State of Uttar Pradesh on EPC Basis-NOC for Overhead Crossing of Eastern Peripheral Expressway of 132KV 2-PH KhekraAhera TSS line in between EPE Km. 20+400 to Km. 20+600
  • Rehabilitation & Up gradation to four laning of Singara to Binjabahal section of NH-6 from Ch. km. 310.806 to km, 414.982 in the state of Odisha under Hybrid Annuity Mode under PIU -NHAI, Keonjhar, NOC proposal for ROW access permission for laying of 1 no. Iron ore slurry pipeline of Steel of dia 800mm for Iron ore transportation & 50mm dia OFC to Pallet plant at Paradip, Jagatsinghpur District from Ch.Km.373+340 at Bayapandadhar to Ch.Km,.377+990 at Kuanar (RHS) with total as 4.650Km within the Utility Corridor along the road & 1 no. of Crossing from LHS to RHS at Km.373+340 across the road of NH-6 in Keonjhar District of Odisha State as sought by the Authorised Signatory, M/s. Thriveni Earth Movers Private Limited, At Unchabali, P.O:- Bamebari, Keonjhar District, Odisha
  • NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable from Km.282+960 to Km.283+100 (LHS), from Km.288+980 to Km.289+863 (LHS), from Km.282+655 to Km.286+860 (RHS), from Km.286+863 to Km.288+980 (RHS), along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.283+100, Km.286+860, Km.286+863, Km.288+980, on Nagpur to Hyderabad section of NH-44 in the State of Telangana
  • NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable from Km.260+500 to km,.261+180 (RHS), from Km.263+120 to Km.263+210 (RHS), from Km.263+980 to Km.272+400 (RHS), from Km.272+400 to Km.278+230 (RHS), from Km.261+180 to Km.261+220 (LHS), from km.263+120 to Km.264+020 (LHS), from Km.271+895 to Km.271+925 (LHS) along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.261+180, Km.263+120, Km.265+515, Km.265+525, Km:271+025, Km.271+925, Km.272+950, Km.278+230, Km.279+590 on Nagpur to Hyderabad section of NH-44 in the State of Telangana
  • NHAI-PIU-NSK-Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape-Gonde (Km 539.500-Km 440.000) section of NH-3 in the State of Maharashtra - M/s. Jio Digital Fibre Pvt. Ltd.’s Proposal for laying OFC from Km. 532.550 to Km. 537.00 Total Length 4.45 Km. (LHS) on NH-3
  • NHAI-RO Kerala-KL-01-Request for laying of Natural Gas pipeline from Km.294+300-Km.319+410 and crossing at Km.300+200, Km.301+100, Km.302+200, Km.303+750 and Km.307+750 of NH-544 by M/s IOAGPL
  • Rehabilitation and up gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388.376 to Km.428.074) of NH-200 (New NH-53) in the state of Odisha under NHDP-III - ROW permission to lay and road crossing of 50mm dia Oxygen pipeline (Steel) with Casing Pipe (HDPE) of 160mm dia through HDD methodology at chainage 391+400
  • Proposal for Permission for laying Optical Fibre cable (OFC) along the road Nh-42 by M/s Vindhya Telelinks Limited from km 234/900 to km 236/730 (LHS) of NH-42 (Uravakonda-Krishnagiri section) and a crossing (along the road) on (Rayachoti - Angallu section) NH-340 length of 30.00mts, for a total length of 1.830 kms in Chittoor District in the State of Andhra Pradesh
  • Permission for ROW Permission for Water Pipeline Crossing of NH-113 (New NH-56) at (i) Km 196+400, (ii) Km 200+450, (iii) Km_200+750, (iv) Km 204+750, (v) Km 206+500 & (vi) Km 208+780 Sagwa to Godda Section under the work of Cluster Distribution System for 150 Villages of Sajjangarh Block (Pkg-02) under Water Supply Project for 399 Villages and 395 Dhanies of Blocks Kushalgarh and Sajjangarh Dist-Banswara with operation and maintenance for 10 years on single point responsibility turnkey basis in the state of Rajasthan
  • Proposal for ROW permission for Overhead Crossing of Highway by 66KV S/C Palanpur to Hebatpur Line CKT-2 with ACSR Panther Conductor under KISAN SURYODAYA YOJNA at Km 603+610 (between Km 603+000 and Km 604+000) in the state of Gujarat
  • Proposal for ROW Permission for laying optical fiber cable on NH-27 from Km 562+500 to Km 565+000 and One Crossing at Km 562+500 for total section of 2.5 Kms (Banas Diesel Pump Service Akhol circle to Banas River) in state of Gujarat
  • Rehabilitation & Up gradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the State of Odisha under NHDP-IIl on EPC Mode Package-ll- ROW permission for laying Optical Fiber Cable by HDD from CPP GATE (Kulad) to CPP Wall near Ambika Bhaban through old road (LHS)
  • Laying of OFC (Underground) on hill side from Km 100.600 (Majkhali) to Km 120.600 (Gagas) and Km 71.850 (Hotel Management) to Km 72.400 (Pandeykhola Bypass) along NH-87(New NH-109) for Total length of ROW is 20.550 Kms in Champawat & Pithoragarh Districts in the State of Uttrakhand
  • Proposal for NOC for overhead crossing of 132 KV S/C in Pilibhit to Pilibhit TSS (Traction Sub Station) overhead line on NH-730 at km.6.300, near town Pilibhit in the State of Uttar Pradesh
  • Permission for Laying of Optical Fiber Cable from Km 00 to Km 12.274 on NH-13 for OFC link-Tezu to Chowkham in the state of Arunachal Pradesh
  • Proposal seeking permission for laying of pipeline for filling of tanks in Yelaburga and Koppal taluks of Koppal District by lifting water from Tungabhadra river for drinking purpose along NH-367 from Km. 1.450 to Km. 26.00 and crossing at Km. 1.450 & Km. 26.00 by Minor Irrigation & Ground Water Development Department, Division Koppal
  • Permission/NOC to lay 6.1km. of 6" dia CS & 125mm dia MDPE Natural Gas Pipeline on Bareilly-Shahjahanpur Road along RHS of NH-30 from chainage 262.000 (Tata Motors) to Chainage No. 268.100 (KEO, Bareilly) in the State of Uttar Pradesh
  • NHAI, Madurai Region - PIU, Trichy - Permission for the proposal of laying water supply pipeline along and across NH at Ulundurpet - Padalur Section of NH-45 for providing CWSS to Thittakudi, Pennadam, Mangalampettai, Gangaikondan, Vadalur and Kurinjipadi Town Panchayats and 625 rural habitations in Mangalore, Nallur and Vridhachalam Unions in Cuddalore District with NLC Mine water as source under Package-IV - Proposal submitted
  • Permission for laying optical fiber cable from Km.290.00 to Km.332.00 along NH-24 (New-30). Total section length ROW applied for 42.00 Kms. in the State of Uttar Pradesh
  • NHAI, Madurai Region – Highway Administration – Permission for laying of underground OFC under PIU, Thanjavur - laying underground OFC by M/s. Telosonic Networks Ltd (Airtel), Chennai Along the Road at from Km 91/400 to Km 93/200 RHS and across at Km 93/200 on Thanjavur - Trichy section of NH67 in the state of Tamil Nadu
  • NHAI, Madurai Region – Highway Administration – Permission for laying of underground OFC under PIU, Thanjavur - laying underground OFC by M/s. Telosonic Networks Ltd (Airtel), Chennai Along the Road at from Km.57/100 to Km.65.960 (LHS) Total Length of 8860Mts on Vikravandi - Sethiyathope section of NH45C in the state of Tamil Nadu
  • NHAI, Madurai Region - PIU, Madurai - Operation and Maintenance of Madurai - Kanyakumari section from Km.0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu - Permission for laying of Under Ground Electrical Cable across the road at Km.18/626, Km.18/650 and Km.19/718 of Madurai - Kanyakumari section of NH-44 (Old No.NH-7) - Proposal submitted
  • NHAI, Madurai Region – Highway Administration – Permission for laying of underground OFC under PIU, Thanjavur - laying underground Optical Fiber Cable by M/s. Telosonic Networks Ltd (Airtel), Chennai Along the Road at from Km.60/250 to Km.69/505 (LHS) Total Length of 9255Mts (Existing Chainage) & from Km.65/960 to Km.66/000 (LHS), Km.74/650 to Km.75/000 (LHS), Km.74/670 to Km.95/000 (RHS), Km.75/500 to Km.75/690 (LHS), Km.90/100 to Km.90/540 (LHS), Km.95/000 to Km.95/435 (LHS) (Design Chainage) Crossing at across the road at Km. 75/000, Km. 75/500, Km. 90/100, Km. 95/000 on Sethiyathope – Cholapuram section of NH45C in the state of Tamil Nadu
  • NHAI – Madurai Region – Highway Administration – Access Persmission to Retail Outlets under PIU Karaikudi – Proposal for granting NOC and Construction of approach road & culvert in front of MS/HSD Retail Outlet by M/s IOCL from Km164/615 to Km164/655 on RHS of Karaikudi – Ramanathapuram section of NH 210 in Survey No. 408/4A & 408/4B2 of Devipattinam village, Ramanathapuram Taluk & District – Proposal for Issue of Extension of Time for In-Principle Approval/Provisional NOC - Requested upto 31.12.2021
  • NHAI, Madurai Region - PIU, Trichy - Permission for erection of 22 KV AC Over Head Power Supply line across NH road at Km 290/000 in Padalur - Trichy section of NH-45 for M/s Sree Balaji Crusher, Sanamangalam Road, Nedungur Village, Lalgudi Taluk, Trichy District in the State of Tamil Nadu
  • Permission for laying of 160 mm diameter sewerage pipe from km 295.473 to km 296.173 (RHS) along NH-07 in section of Zirakpur-Patiala section at Village Karheri, District-Rajpura in the State of Punjab by HDD method
  • Laying of fiber cable from km 363.300 to km 384.700 (LHS) on old NH-71 in Rohtak -Jajjhar section by HDD method in the State of Haryana
  • Laying of water pipeline along the road from from Km 26/850 to Km 27/230 (LHS) & KM 26/960 to KM 27/260 (RHS) , KM 30/600 to KM 30/700 (RHS), KM 31/830 to KM 32/010 (LHS), KM40/480 to KM 40/110 (LHS), KM |42/600 to KM 42/750 (LHS) & KM 42/600 to KM 42/810(RHS), KM |43/570 to KM 43/850 (RHS), KM 44/950 to Km 45/330 (LHS) & Km |44/840 to Km 45/125 (RHS), KM 45/840 to Km 46/080 (LHS) & Km |45/660 to 46/080 (RHS) for a total length of 2.955 Kms by open trench technology and across the road @ Km 27/230 , KM 30/600, KM 31/985, KM 38/440,KM 40/080, KM 142/600, KM 43/850, KM 45/125, KM 46/080 by trenchless technology of Krishnagiri – Walajahpet section of NH-48 (Old NH-46) by Executive Engineer, TWAD, RWS Division, Tirupattur
  • Proposal for laying of 200mm dia CI pipeline from Km 4+300 to Km 5+400 on RHS at the edge/beyond service road of Ennore Expressway Phase-IT by Open Trench Method
  • NOC for proposal for permission for laying optical fiber cable (OFC) along NH- 727(Old NH-28B)(Narayanpur - Valmiki Bazar Section). from Km. 91+500 to Km.97+500 (6000Mt) and crossing by HDD Method at Km. 97+500 at District-West Champaran, Bihar
  • NOC for proposal for permission for laying optical fiber cable (OFC) along NH- 727(Old NH-28B)(Narayanpur - Valmiki Bazar Section) from Km. 91+500 to Km.97+500 (6000Mt) and crossing by HDD Method at Km. 97+500 at District-West Champaran, Bihar
  • Four laning of Solapur to Yedshi Section of NH-211 from Km. 0/000 to 100/000 (Design Length - 98.717 Km.) in the State of Maharashtra to be executed as BOT (Tall) on DBFOT Pattern under NHDP Phase - IVB - Submission of Permission for laying optical fiber from Km.34/000 to Km.35/200(1200 meter) on NH-211 (Working OFC which is damaged during the construction of NH / MH State HW / PWD / ZP) laid under National Optical Fiber Network Project (NOFN)
  • NHAI, Madurai Region – Highway Administration – Laying of Water supply pipeline under PIU, Karaikudi - Permission for laying Water supply pipeline by TWAD Board, Sivagangai along highway from Km 95/900 to Km 98/200 Thanjavur - Manamadurai section of NH 226
  • Proposal for grant Permission for Optical Fiber Cable (OFC) along in between Pune - Nashik NH -60 from Ch. 203/600 to Km, 205/00 to 206/200 to Km, 206/350 to 206/650 (Road crossing at Km, 204/900, 206/200, 206/600) Total Length 3.140 Km, in the State of Maharashtra. Applicant: M/s Jio Digital Fiber Pvt Ltd, Ahmadabad
  • Proposal for grant Permission for Optical Fiber Cable (OFC) along in between Jalgaon-Pachora-Bhadgaon-Nandgaon-Manmad NH -753 J from Ch. 168/125 to Km, 168/800 (Road crossing at Km, 168/221) Total Length 0.675 Km, in the state of Maharashtra. Applicant: M/s Jio Digital Fiber Pvt Ltd, Ahmadabad
  • Four-Laning of Chutmalpur-Ganeshpur Section of NH-72A from Km.0.000 (Km.22.825 of NH-73) to Km.16.000 (Design Km.17.900) & Roorkee-Chutmalpur-Gagalheri section of NH-73 from Km.0.000 (Km.167.800 of NH-58) to Km.33.000 (Design Km.35.400) in the State of Uttarakhand & Uttar Pradesh under NHDP-IV on Hybrid Annuity Mode
  • NHAI - PIU, Salem - Proposal for laying of a Public Utility - City Gas Distribution (CGD) : Carbon Steel and MDPE Pipelines with OFC along NH- 44 (Sri Nagar - Kanyakumari Highway) in between highway of increasing Chainage Km 207/650 to Km 210/100 (LHS) by M/s Indian Oil Corporation Limited, Chennai
  • NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 22.232 Km from Km.616+803 to Km.621+549 (RHS), from Km.631+200 to Km.631+240 (RHS), from Km.621+549 to Km.626+500 (LHS), from Km.627+500 to Km.639+500 (LHS), along NH-61 by Open trench Methodology and Highway crossings by HDD methodology at Km.616+803, Km.619+435, Km.620+707, Km.621+549, Km.628+150, Km.628+905, Km.631+200, Km.631+904, Km.635+850, and Km.636+000 on Kalyan to Nirmal section of NH-61 in the State of Telangana
  • Four laning of Nagpur -Saoner-Betul section of NH-69 from km 3.000 to kms 59.300 in the State of Maharashtra and from kms. 137.000 to kms 257.400 in the State of Madhya Pradesh on DBFOT (Annuity) basis- Permission for crossing of underground HT electric line by HDD Method
  • NHAI - RO Hyderabad - PIU Hyderabad- Krishnapatnam-Hyderabad pipeline project of M/s BPCL- Proposal for Permission for laying of 16 inch dia underground multi-product petroleum pipeline encased in 22 inch dia steel casing pipe along with 40mm dia HDPE ducts for Optical Fiber Cable across National Highway at Km. 65+785 by HDD method on Hyderabad -Vijayawada section of NH- 65 in the State of Telangana
  • Proposal for Permission to Optical Fibre Cable OFC laying along with Ducts (2 Ducts) on Akot - Anjangaon - Baitul - MP State Border road, section of NH-548-C @ Ch. ln Km, 108/630 (Mishra Chowk T point) to Km, 115/550 (Kharpi T-point) Length 6.92 Km, (Along) & Length 0.044 Km, (Across), Total Length 6.964, in the State of Maharashtra
  • Application for Granting permission for laying GAIL’s 4" dia Natural Gas Pipeline as an Integral Part of Gas Pipeline across/along NH-33
  • NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 26.528 Km from Km.667+640 to Km.668+315 (RHS), from Km.640+965 to Km.641+005 (LHS), from Km.642+300 to Km.658+400 (LHS), from Km.658+500 to Km.667+640 (LHS), along NH-61 by Open trench Methodology and Highway crossings by HDD methodology at Km.642+300, Km.647+810, Km.647+820, Km,648+039, Km.648+041, Km.652+100, Km,.654+500, Km.655+967, Km.658+400, Km,658+500, Km.661+665, Km.663+300, and Km.667+640 on Kalyan to Nirmal section of NH-61 in the State of Telangana
  • NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 82.731 Km from Km.176+200 to Km.260+400 along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at km.176+200, Km.183+000, Km.186+160, Km.188+480, Km.193+770, Km.199+680, Km.200+720, Km.206+420, Km,211+650, Km.213+700, Km.215+330, Km.218+150, Km.220+900m, Km..226+120, Km.226+720, Km.232+990, Km.233+720, Km.235+360, Km.240+200, Km,240+700, Km.241+460, Km.244+800, Km.245+750, Km.248+700, Km.253+800, and Km.255+080 on Nagpur to Hyderabad section of NH-44 in the State of Telangana
  • Permission proposal for laying of underground Optical fiber Cable Line along the NH-181 a crossing at Km 24/240(LHS) of length 50m in limits of National Highway, Coimbatore-Mettupalayam road in the state of Tamil Nadu
  • Operation & Maintenance for Hyderabad - Bangalore section from Km.211.000 to Km. 462.164 of NH-44 (Old NH-7) on OMT basis in the State of Andhra Pradesh - Permission for laying of drinking water pipeline across NH-44 at Km 256.115 (Udumulapadu), 275.110 (Yenugumarri), 280.800 (Venglamapalli)