You are here

Two laning of Chenani to Nashri Tunnel  of NH-44 in state of J&K

  • Project details:
    • Length of the project: 11 km
    • Project Cost: Rs. 4703 Cr  
    • Hon’ble Prime Minister inaugurated on 02.04.2017.

Main Features

  • Integrated Traffic Control System
  • Electrical Fire Signalling System
  • Video Surveillance System
  • Tunnel Ventilation System
  • Evacuative Broadcast System
  • FM Rebroadcast System
  • SOS call boxes at every 150 m