Two laning of Chenani to Nashri Tunnel of NH-44 in state of J&K
- Project details:
- Length of the project: 11 km
- Project Cost: Rs. 4703 Cr
- Hon’ble Prime Minister inaugurated on 02.04.2017.
Main Features
- Integrated Traffic Control System
- Electrical Fire Signalling System
- Video Surveillance System
- Tunnel Ventilation System
- Evacuative Broadcast System
- FM Rebroadcast System
- SOS call boxes at every 150 m