Bridges across Dibang and Lohit
rivers
Approach roads between
Chowkham-Digaru and Bomjur-
Meka sections
Part of the Trans-Arunachal Highway
(TAH), the project comprises of the
following sections:
Dibang Bridge on Bomjur- Meka stretch:
Consisting of three major bridges (150 m,
2,150 m & 3,950 m) with total Bridge length
of 6,250 m.
Lohit Bridge on Chowkham – Digaru stretch:
Consisting of two major bridges (120 m &
2,100 m) at Alubari Ghat of total bridge
length of 2,220 m.
At a Glance
29.63 km
total length
Rs. 1,508.25 Cr
total
cost
5
Major Bridges
7
Minor Bridges
29
Culverts
12




