Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal for grant of ROW permission for crossing of Optical Fibre Cable (4G project) at Km 304+870 (Total Length 45mtr), near Ashirwad Hotel on NH-27 on Garamore- Samakhiyali section of NH-27 in the state of Gujarat

    ... Digital_Across at Km 304+840_PD-Palanpur-107355 (1).pdf Language English Document Date:  ...

    morthadmin - 11/12/2021 - 17:27 - 0 comments

  2. NHAI, Madurai Region - PIU, Madurai - Four laning of Melur (Design Km.0+000 / Existing Km.99+920 of NH-38) to Karaikudi (Design Km.45+855 / Existing Km.12+900 of NH-383 Ext) on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu - Permission for laying of Water Pipeline across the road at Km.19+130 of Melur to Karaikudi section of NH-338, 383 & 38 in the State of Tamil Nadu - Proposal submitted

    ... File:  RO MDU Lr No 2251 dt 11 11 2021 (1).pdf Language English Document Date:  ...

    morthadmin - 11/12/2021 - 16:51 - 0 comments

  3. NHAI, PlU, Krishnagiri- Laying of Underground OFC existing chainage along the road from km.35/500 to km.381500(LHS), km.50/400 to km.52i430 (LHS) and New Design Chainage along the road from km.49/900 to km.50/170 (LHS) of Thorapalli Agraharam - Jittandahalli section of NH-844 (Package ll) by M/s. Telesonic Networks Limited

    Upload Document File:  1517 (1).pdf Language English Document Date:  ...

    morthadmin - 11/12/2021 - 16:39 - 0 comments

  4. Permission for overhead crossing NH-232A (Unnao - Lalganj) 132 KV Sareni - Raghuraj Singh TSS Line at Ch.54.184

    ... 11.11.2021 OC Sareni- Raghuraj Singh TSS line KAnpur PC (1).pdf Language English Document Date:  ...

    morthadmin - 11/12/2021 - 16:36 - 0 comments

  5. Proposal for ROW permission for crossing of 66KV LILO Shikarpur line with ACSR Panther Conductor crossing on NH-8A(Extn) at Km 289+910 (between Km 289 to Km 290) Electric Line crossing NH-8A in the state of Gujarat

    ... dt. 11.11.2021_GETCO-Anjar_Across Km 289+910_107341 (1).pdf Language English Document Date:  ...

    morthadmin - 11/12/2021 - 10:49 - 0 comments

  6. Proposal for ROW permission for laying 12” dia Steel Natural Gas Pipeline across NH-27 (Morbi-Samakhiyali Road) at Km 264+926 to supply natural gas to Village Khirai from our existing pipeline near Finstone Granito in Village-Gala, Taluka & District Morbi, Near Village-Vadharva, Taluka Maliya Miyana, Dist.Morbi in the state of Gujarat

    ... dt. 11.11.2021_Gujarat Gas_Across Km 264+926_108414 (1).pdf Language English Document Date:  ...

    morthadmin - 11/12/2021 - 10:47 - 0 comments

  7. Proposal for ROW permission for laying proposal 8"/6" dia Steel Gas Pipeline from GSPL DJPL SV-5 to JOCL Petrol Pump along NH-8E (NH-51) from Km 52+017 to Km 514425 (LHS)= 592m) and Km 514425 to Km 51+970 (RHS)=545m) and across at NH-51 Km 514425) (60m) bypass NH Road at Talaja of Taluka-Talaja, District Bhavnagar of Bhavnagar GA in the state of Gujarat

    ... dt. 11.11.2021_Gujarat Gas_Km 52+017 to Km 51+425_108023 (1).pdf Language English Document Date:  ...

    morthadmin - 11/12/2021 - 10:43 - 0 comments

  8. NHAI, Madurai Region - PIU, Madurai - Operation and Maintenance of Madurai – Kanyakumari section from Km.0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu – Permission for laying of Underground Sewage Pipeline along the road from Km.156+260 to Km.156+420 (LHS), Km.156+260 to Km.156+580 (RHS), Gravity Sewer – Km.156+410 to Km.156+600 (LHS), Km.157+535 to Km.157+565 (LHS), Km.157+535 to Km.157+780 (RHS), Km.159+173 to Km.160+170 (RHS), Gravity Sewer – Km.159+870 to Km.160+160 (RHS), Km.159+658 to Km.159+708 (LHS), Km.159+173 to Km.159+708 (RHS) and Across the road at Km.154+300, Km.156+260, Km.157+535 and Km.159+708 of Madurai - Kanyakumari Section of NH-44 (Old No. NH-7) – Proposal submitted

    ... File:  RO MDU Lr NO 2207 Public Comments(1).pdf Language English Document Date:  ...

    morthadmin - 11/09/2021 - 09:56 - 0 comments

  9. Permission for laying of underground Gas Pipeline (8" dia of Steel Pipe) and 125mm dia MDPE Gas Pipeline by HDD/Trenching Method of M/s Indraprastha Gas Limited from Old Ch. 31+700 to Old Ch. 37+200 along Right Hand Side (RHS) of the National Highway. The total section length for ROW applied is 5.5km on along Panipat-Shamli Road, National Highway, New NH-709AD (Old SH-12) in the State of Uttar Pradesh

    ... Letter no 1001 dated 29.10.2021 IGL UG Baghapt PC(1).pdf Language English Document Date:  ...

    morthadmin - 10/30/2021 - 20:24 - 0 comments

  10. NOC for laying of Electrical Cable (11KV U/G CLPE Cable) outer dia of HDPE Pipe 300mm with Connectivity on through the Electric Poles (SP 55 Steel Tubular Double pole 1.0m long with Pit (size 600mm dia and 2.0m depth) of Uttar Pradesh Housing & Development Board from km. 118.630 (RHS) to km. 119.300 (RHS) length 670m) and one crossing at km. 119.300 (length 30m) (total length 700m) on NH-534 (Najibabad to Kotdwar Road) in the State of Uttar Pradesh

    ... no 999 dated 28.10.2021 Electrical Cable NH-534 Meerut PC(1).pdf Language English Document Date:  ...

    morthadmin - 10/28/2021 - 17:36 - 0 comments

Pages