Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Permission proposal for laying of underground Optical fiber Cable Line along the NH-181 a crossing at Km 24/240(LHS) of length 50m in limits of National Highway, Coimbatore-Mettupalayam road in the state of Tamil Nadu

    Upload Document File:  181-nh-per(1).pdf Language English Document Date:  ...

    morthadmin - 12/07/2021 - 10:23 - 0 comments

  2. Proposal for permission of overhead crossing of NH-709A (Garhmukteshwar- Meerut Road) at Chainage 8.765 km Near Village- Lodhipur Sobhan, Tehsil- Garhmukteshwar, District-Hapur for construction of 400KV D/C Meerut- Simbhawali Transmission Line

    ... no 1080 dated 06.12.2021 OC 709A Lodhipur Sobhan Moradabad(1).pdf Language English Document Date:  ...

    morthadmin - 12/07/2021 - 10:08 - 0 comments

  3. Proposal for laying of OFC by M/s Vindhya Telelinks Ltd, Secunderabad from Km 164/800 to 167/200, Km 167/200 to Km 168/400(RHS) & Road crossing at Km 167/200 (RHS-LHS) for a Total length of 3.6 Km along Rudrampur-Bhadrachalam Section of NH-30 in the state of Telangana

    Upload Document File:  uploading NH-30 OFC(1).pdf Language English Document Date:  ...

    morthadmin - 12/06/2021 - 14:13 - 0 comments

  4. Automotive Vehicles- Retreaded Pneumatic Tyres for Commercial Vehicles

    ... Final Upload Document:  5_15_2008_1_07_58_PM60 AIS-064(Part 1).pdf ASI Date:  Wednesday, November 2, 2005 ...

    morthadmin - 06/14/2019 - 16:19 - 0 comments

  5. NHAI - RO Hyderabad - PIU Hyderabad- Krishnapatnam-Hyderabad pipeline project of M/s BPCL- Proposal for Permission for laying of 16 inch dia underground multi-product petroleum pipeline encased in 22 inch dia steel casing pipe along with 40mm dia HDPE ducts for Optical Fiber Cable across National Highway at Km. 65+785 by HDD method on Hyderabad -Vijayawada section of NH- 65 in the State of Telangana

    ... Document File:  2172 dated 23.11.2021- PD(1).pdf Language English Document Date:  ...

    morthadmin - 11/29/2021 - 17:34 - 0 comments

  6. NHAI, Madurai Region - PIU, Trichy - Permission for erection of 22 KV AC Over Head Power Supply line across NH road at Km 290/000 in Padalur - Trichy section of NH-45 for M/s Sree Balaji Crusher, Sanamangalam Road, Nedungur Village, Lalgudi Taluk, Trichy District in the State of Tamil Nadu

    ... dt 17-11-21 Invitation of Public Comments - EB line Crossing(1).pdf Language English Document Date:  ...

    morthadmin - 11/22/2021 - 10:52 - 0 comments

  7. NHAI, Madurai Region - PIU, Trichy - Permission for the proposal of laying water supply pipeline along and across NH at Ulundurpet - Padalur Section of NH-45 for providing CWSS to Thittakudi, Pennadam, Mangalampettai, Gangaikondan, Vadalur and Kurinjipadi Town Panchayats and 625 rural habitations in Mangalore, Nallur and Vridhachalam Unions in Cuddalore District with NLC Mine water as source under Package-IV - Proposal submitted

    ... 2290 dt 18-11-21 Invitation of Public Comments - WSPL - CWSS(1).pdf Language English Document Date:  ...

    morthadmin - 11/21/2021 - 14:07 - 0 comments

  8. Proposal seeking permission for laying of pipeline for filling of tanks in Yelaburga and Koppal taluks of Koppal District by lifting water from Tungabhadra river for drinking purpose along NH-367 from Km. 1.450 to Km. 26.00 and crossing at Km. 1.450 & Km. 26.00 by Minor Irrigation & Ground Water Development Department, Division Koppal

    Upload Document File:  NH-367 Km 1.450 to Km 26.00 MI&GWD Koppal(1).pdf Language English Document Date:  ...

    morthadmin - 11/18/2021 - 23:27 - 0 comments

  9. Proposal for Permission for laying Optical Fibre cable (OFC) along the road Nh-42 by M/s Vindhya Telelinks Limited from km 234/900 to km 236/730 (LHS) of NH-42 (Uravakonda-Krishnagiri section) and a crossing (along the road) on (Rayachoti - Angallu section) NH-340 length of 30.00mts, for a total length of 1.830 kms in Chittoor District in the State of Andhra Pradesh

    ... for laying OFC-Sr.no_.93-Vindhya Telelinks Ltd(1).pdf Language English Document Date:  ...

    morthadmin - 11/16/2021 - 18:18 - 0 comments

  10. NHAI-PIU-NSK-Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape-Gonde (Km 539.500-Km 440.000) section of NH-3 in the State of Maharashtra - M/s. Jio Digital Fibre Pvt. Ltd.’s Proposal for laying OFC from Km. 532.550 to Km. 537.00 Total Length 4.45 Km. (LHS) on NH-3

    ... - Invitation of Public Comments M-s Jio Digital Fibre(1).pdf Language English Document Date:  ...

    morthadmin - 11/14/2021 - 13:04 - 0 comments

Pages