4310.1/4110 |
Monetary Limits up to which expenditure on Petty & Misc. Item of Works Pertaining to NHs Ordinary called as New works Can be Charged to Repairs |
10-04-1969 |
NHI.40(2)/68 |
|
|
4310.2/4210 |
Report Regarding Damages to NHs |
14-09-1971 |
NHI-41(11)/71 |
|
|
4310.3 |
Repairs to Asphaltic Wearing Coat |
08-03-1972 |
LR-16(150)/66 |
|
|
4310.4 |
Maintenance of Bridges |
13-04-1973 |
NHVI-8(46)/72 |
|
|
4310.5/4110 |
Acceptance of Central Financial Liability for the Development/Maintenance of Urban Road Links of NHs |
17-03-1976 |
NHIII/P 16/76 |
|
|
4310.6/4110 |
Acceptance of Central Financial Liability for the Development/Maintenance of Urban Road Links of NHs |
10-08-1976 |
NHIII/P/13/75 |
|
|
4310.7 |
Maintenance of Bearings |
26-03-1977 |
PL.67(20)/76 |
|
|
4310.8 |
Removal of Stains from Concrete Surfaces |
27-04-1977 |
PL-30(28)/77 |
|
|
4310.9 |
Close Watch on Bridge During Post Construction Period |
08-01-1979 |
NHIII/P/2/79 |
|
|
4310.10 |
Need for Ensuring Safety of Completed Bridges |
02-05-1979 |
NHIII/P/2/79 |
|
|
4310.11/4210 |
Measure to Mitigate Adverse Effects of Rains and Floods on traffic Operation and performance of Highways |
28-06-1979 |
PL-67(29)/76-NHVI |
|
|
4310.12 |
Removal of Vegetational Growth Obstructing waterway |
04-08-1979 |
NH-VI-67(3)/79 |
|
|
4310.13/1980 |
Damage of NHs due to heavy rains, Flood/water-logging-Need for proper, Permanent Remedial Measures |
08-08-1979 |
NH-VI-67(3)/79 |
|
|
4310.14/1980 |
Maintenance of Existing Concrete Bridge Susceptible to Corrosion |
31-03-1981 |
PL-17(14)/76 Vol. II |
|
|
4310.15/4210 |
Flood Damages to NHs-Instructions Regarding Mitigation, Reporting and Remedial Measures |
04-08-1981 |
NHIII/P/13/79 |
|
|
4310.16 |
Records to be kept with Maintenance Engineer |
21-04-1983 |
NH-VI-50(3)/83 |
|
|
4310.17 |
Repairs of Bridges by Shotcreting |
16-06-1983 |
RW/PL-17(14)/76-Vol. II |
|
|
4310.18 |
Clearance of Drift Wood Entangled in Box/Pipe Structures |
18-11-1983 |
NHVI-50(3)/83 |
|
|
4310.19 |
Periodic Inspection and Maintenance of Bridges |
03-12-1983 |
NH-VI-67(29)/76 |
|
|
4310.20/608 |
Load Restrictions on Weak Bridges and Culverts |
27-06-1985 |
RW/NHIII/P/13/85 |
|
|
4310.21 |
Periodic inspection and maintenance of bridges on NHs |
13-01-1989 |
RW/33044/2/88-DO II |
|
|
4310.22 |
Panel of Independent consultants for repairs/rehabilitation of bridges |
13-01-1989 |
RW/NH/34020/1/90-DO II |
|
|
4310.23 |
Investigations, Analysis & repairs/rehabilitation of bridges-engaging of an agency for carrying out the entire work as a turn key job |
12-09-1990 |
RW/NH/34020/1/90-DO II |
|
|
4310.24 |
Maintenance of wearing coat bridges and culverts vis-a-vis strengthening of approaches thereof |
01-06-2000 |
RW/NH-33044/10/2000-S&R |
|
|
4310.25 |
Normal Maintenance of Bridges on National Highways |
31-01-2003 |
RW/NH-34059/2/2001-S&R(B) |
|
|
4310.26 |
Four Laning & Strengthening of the existing Two Lane stretches on NH-6 from km 17.600 to km 136.00 in the State of West Bengal |
12-04-2004 |
RW/NH-34066/11/2004-S7R(B) |
|
|
4310.27 |
Use of Micro-surfacing for the renewal course, maintenance and repair on National Highways |
28-09-2016 |
RW/NH- 33044/68/2016/S&R (R)
|
|
|