Sorry, you need to enable JavaScript to visit this website.
Archive of Circulars and Other Notifications
S.No. Subject Circulars Category दिनांक
61 Remuneration of professional staff claimed by the consultancy firms (960.71 Kb application-pdf) National Highways 20-09-2022
62 Memorandum of Understanding (MOU) for proposed implementation of ROBs/ RUBs on State Roads under CRIF Scheme under “SETU BANDHAN” Programme – Signing of Tripartite MOU - Standard Operating Procedure (SOP) (23.73 Mb application-pdf) National Highways 15-09-2022
63 Consultancy services for Authority's Engineer for supervision of following two Projects. (i) Widening of Pachpadra-Bagundi section to 4 lane of NH-25 on EPC Mode and (ii) 4 lane divided carriageway from km 0.000 (km 144.200 of NH-15 (New NH-68) to km 21.042 (km 160.700 of NH-15 (New NH-68) barmer Bypass of NH-15 (New NH-68) on EPC Mode in the state of Rajasthan-Intimation regarding adverse action/ debarment/ blacklisted/ non-performance of the firms/ Key Personnel (1.69 Mb application-pdf) Debarment 15-09-2022
64 Construction of Subway/FOB/Footpath along with ROB for closure of Level Crossing (3.97 Mb application-pdf) National Highways 14-09-2022
65 G.S.R. 695(E) regarding RVSF amendment rules, to amend G.S.R. 653(E) (1.74 Mb application-pdf) Vehicle Scrapping Policy 13-09-2022
66 Department-related Parliamentary Standing Committee on Transport, Tourism and Culture-Action taken Notes on Recommendations/Observations contained (Para19.8 of the 301st Report) - Necessary Direction/advisory for ensuring regular trimming of the shrubs and trees on NHs (674.23 Kb application-pdf) National Highways 06-09-2022
67 Seeking additional performance security for the bidders who have quoted abnormally low bid price (501.33 Kb application-pdf) National Highways 31-08-2022
68 Value Engineering Practices for the Design, Construction & Maintenance of National Highways Projects (3.74 Mb application-pdf) National Highways 30-08-2022
69 Mandatory training courses requirement for Personnel of DPR Consultants (2.02 Mb application-pdf) National Highways 29-08-2022
70 Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 (existing km 150.00) to Neechli oden (Nathdwara) at Design ch. Km 88.800 (existing km 55.950) of NH-162E on EPC mode.Intimation regarding adverse action/ debarment/ blacklisted/ nonperformanceof the firms/ key Personnel (2.82 Mb application-pdf) Debarment 26-08-2022

Pages