Sorry, you need to enable JavaScript to visit this website.
Archive of Circulars and Other Notifications
S.No. Subject Circulars Category दिनांक
151 Constitution of Road Tunnels Advisory Committee (RTAC) (3.05 Mb application-pdf) Road Transport 27-01-2022
152 Revision of Normative Cost Norms for the National Highways in Plain and Rolling Terrain - Project Cost Analysis Tool for Normative Cost (642.37 Kb application-pdf) National Highways 19-01-2022
153 System of Regular Monthly Reviews and close monitoring of NH projects (14.81 Mb application-pdf) National Highways 19-01-2022
154 Standard operating procedure to debar/penalize/declare the Contractor/Concessionaire as Non-performer in National Highways and other centrally sponsored road projects (1.50 Mb application-pdf) Debarment 04-01-2022
155 Minutes of the Meeting for meeting held on 22.12.2021 at 04:30 PM under the Chairmanship of Secretary (RT&H) for a presentation and demonstration of the Annual Maintenance programming Tool (AMT) in Road Asset Management System (RAMS) (1.52 Mb application-pdf) National Highways 28-12-2021
156 Scheme/Guidelines for proposals on setting up of Inspection & Certification (I&C) centre during 15th Finance Commission Cycle (16.38 Mb application-pdf) Road Safety 22-12-2021
157 Scheme/Guidelines for proposals for setting up of Institute of Driving Training & Research (IDTRs), Regional Driving Training Centres (RDTCs) and Driving Training Centres (DTCs) during 15th Finance Commission Cycle (8.76 Mb application-pdf) Road Safety 22-12-2021
158 OM regarding (i) Changes in standard RFP & MCA of EPC, BOT(Toll) and HAM project in order to ensure compliance of PPP-MII Order, 2017 and Rule 144 (xi) of GFR, 2017 & (ii) Change in the clause no. 2.2.2.1 of the standard RFP of EPC to include all awarded works for determination of available BID Capacity. (9.08 Mb application-pdf) National Highways 16-12-2021
159 Collection of NSV Data for all NHs Stretches, which are not covered under any Ongoing Work / Defect Liability Period (DLP) of the completed work / Medium Term (3 years or more) Contract Maintenance (1.69 Mb application-pdf) National Highways 15-12-2021
160 Construction of ROB at km 116 of NH-99 (new NH-22) at Chandwa (LC No.12A/T) in the state of Jharkhand on EPC mode for the year of 2019-20. Suspension of M/s MVV Satyanarayana, Hyderabad (1.28 Mb application-pdf) Debarment 02-12-2021

Pages