Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
21 Uttar Pradesh Permission for laying Natural Gas Pipeline with OFC along/across NH-30 from km. 262.000 to km. 341.500 at different stretches (4.36 Mb application-pdf) 03-06-2021
22 Uttar Pradesh Permission for laying Natural Gas Pipeline with OFC along/across NH-30 from km. 294.315 upto km. 330.770 at different stretches.1) 6" dia Natural Gas Pipeline along NH-24 from ch. 294.315 to ch. 324.650, 30.335km. (ii) 8" dia Natural Gas Pipeline across NH-24 at ch. 324.650, approx 0.060km. (iii) 8" dia Natural Gas Pipeline along NH-24 from ch. 324.650 to ch. 328.620, 3970km. (iv) 6" dia Natural Gas Pipeline across Nh-24 at ch. 328.620, approx.0.060km. (v) 4"/6" Dia Natural Gas Pipeline along Nh-24, (LHS) from ch. 328.620 to ch. 338.400,10900 km (4.53 Mb application-pdf) 03-06-2021
23 Uttar Pradesh Proposal for permission of laying of optical fiber cable along the route from Km 64.800 to Km. 67.200 on NH-34 (Old NH-86) ( Total Lenght 2.400Km.) in the State of Uttar Pradesh (1.40 Mb application-pdf) 03-06-2021
24 Uttar Pradesh Permission for laying along the NH- 27/44 Raksha to Bijoli left side 8" dia carbon steel pipeline for approx 13.480km ( ch. 0+00 to 13+480) & left side 8' dia carbon steel pipeline along service road for approx 0.350 ( ch. 13+480 to 13+830) and right side 8"dia (200mm) carbon steel pipeline along service road for approx 0.480 km. ( ch. 13+480 to ch. 13+960) & across at ch 13+480km. 0.006 in the State of Uttar Pradesh (3.94 Mb application-pdf) 03-06-2021
25 Uttar Pradesh Crossing permission/NOC for laying 18inch LPG Pipeline along with OFC on NH-26 ( new NH-44)at km. 33.540,Village- Mankuwa,Tehsil- Jhansi,District- Jhansi in the State of Uttar Pradesh (1.04 Mb application-pdf) 03-06-2021
26 Uttar Pradesh Permission for laying of AGL Natural Gas 200mm NB carbon Steel Pipeline along the NH-27 from Jhansi Bypass Raksha to Gwalior road Tirha section of NH-27 (LHS) for approx km. 6.800 (from ch. 1380+300 to ch. 1387+100) in the State of Uttar Pradesh (4.45 Mb application-pdf) 03-06-2021
27 Uttar Pradesh Proposal for crossing permission/NOC for laying 18inch LPG pipeline along with OFC road crossing at ch. 161.000km. on NH_25 ( new NH-27) Jhansi-Orai section,Village- Amraukh,Tehsil- Moth,District- Jhansi in the State of Uttar Pradesh (1.10 Mb application-pdf) 03-06-2021
28 Maharashtra Four laning of Solapur- Yedshi section of NH-211 from Km.0.00 to Km.100.00(Design length 98.717 Km.)in the state of Maharashtra to be executed as BOT (Toll)on DBFOT pattern under NHDP Phase IVB-Submission of proposal for laying overhead 11KV composite electrical line on existing LT line along NH-211 at Km.52/750 to Km.53/160 and Km.52/150 to Km.52/470 on LHS at village Wadgaon Siddheshwar,Tal.& Dist. Osmanabad on Solapur Yedshi section of NH-211 in the State of Maharastr (10.67 Mb application-pdf) 01-06-2021
29 Haryana Four laning of Hisar to Dabwali section of NH-10 from Km. 227.000 to 314.600 with paved shoulder in the State of Haryana on EPC mode (Pkg.-II)- NOC case of permission for laying and crossing of Sewer Water HDPE 280mm and 300mm dia pipe at km. 311.750 to 312.900 LHS along NH, crossing at km. 312.900 LHS to 312.900 RHS and Km 312.900 to 314.900 (RHS) on NH-10 (New NH-09) at village Dabwali,District Sirsa in the State of Haryana (260.70 Kb application-pdf) 01-06-2021
30 Uttar Pradesh Request for Permission for the laying of Underground Gas Pipeline of M/s(8" Dia Steel Pipe & 125 mm Dia MDPE Pipe) of M/s Indian Oil- Adani Gas Private Limited from Design Ch.10.900 to Design Ch.14.500 along left hand side of the National Highway and across the National Highway at Design Ch.11.000 (ROW-60m),Design Ch.14.500(ROW-45m).The total section length for ROW applied is 3.825 km on along Panipat-Shamli Road, National Highway,New NH-709AD(Old SH-12) in village Jhamba,Tehsil-Bapoli and district-Panipat in the State of Haryana (2.94 Mb application-pdf) 31-05-2021

Pages