Sorry, you need to enable JavaScript to visit this website.
  1. About 1,120 km approved length [aggregate length- 1,087 km at an revised cost of Rs. 6,461 km] of NHs are to be improved to 2-lane NH standards following corridor development approach under the World Bank Loan Assistance in Phase-I.  Loan Agreement for Phase-I (1,120 km under first tranches of Loan Assistance of US$ 500 Million) was signed with World Bank on 1 July, 2014. 
  2. For the proposed execution of projects under World Bank Loan Assistance as mentioned above, the cost of LA and utility shifting are to be borne by the Government of India as per the policy of the World Bank. Till March, 2019, 857 km of length has been completed with total expenditure of Rs. 4,190 crore.
  1. About 7 projects having NH length of about 738 km are to be improved under the Loan Assistance from JICA at the cost of about Rs. 18,172 crore. For the proposed execution of projects the cost of LA and utility shifting are to be borne by the Government of India. Out of these 7 projects, 5 projects are to be executed by NHIDCL, 1 project each is being executed by the Ministry through State PWD (BSRDCL) and by NHAI.
  2. The Ministry has awarded 92.935 km, Gaya- Rajgir - Nalanda – Bihar Sharif section of NH 82 in the State of Bihar at cost of Rs. 925.87 crore. The loan component of this project is JP¥ 21.426 billion. About 39 km of length has already been completed of this stretch. The Project is likely to be completed by 2020-21.
  3. NHAI awarded 127 km, Patna – Gaya - Dhobi section of NH 22 in the State of Bihar at cost of Rs. 1,231.98 crore. The loan component of this project is JP¥ 22.903 billion. About 14.5 km of length has been completed so far. However due to poor performance of the Company as well as Company going to NCLT, the project has been foreclosed. Re-award is in process.
  4. Remaining 5 projects are with NHIDCL. One project has started and bids for one project has been invited. Bids for another one project are to be invited. Remaining 2 projects are in pre-construction phase and are yet to be awarded.

The Ministry has awarded 2 projects of about 127.84 km length in the State of West Bengal at revised cost of Rs. 1,658.73 crore. The loan component of this project is US$ 145 Million. Works on 125.60 km has been completed at an expenditure of Rs. 1,301.48 crore as on April, 2019.


Externally Aided Projects (EAP) Documents
S. No. Category Subject Date
11 Green National Highways Corridor Project (GNHCP) Resettlement Action Plan For Rehabilitation and Upgradation to 2-lane configuration of Hamirpur-Mandi section (Km 141.000 to Km 250.592) of NH-70 in the State of Himachal Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of World Bank (5.79 Mb application-pdf)
31-05-2022
12 Green National Highways Corridor Project (GNHCP) Tribal Development Plan (TDP) for Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bowdara to Vizianagaram section (Km 0+000 to Km 26+937) of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of World Bank on EPC mode (4.26 Mb application-pdf)
05-04-2022
13 Green National Highways Corridor Project (GNHCP) Revised RAP for Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Paderu to Araku (Upto Bhalluguda) section (Km 2.400 to Km 51.772) of NH-516E in the State of Andhra Pradesh under GNHCP (3.20 Mb application-pdf)
21-02-2022
14 Green National Highways Corridor Project (GNHCP) Resettlement Action Plan for Rehabilitation and up gradation of Bewar-Pilibhit Section (km 0.000 to km 183.380) of NH 730 C (Package I, II, III) and 731 K(Package IV) State of Uttar Pradesh (12.71 Mb application-pdf)
02-02-2022
15 Green National Highways Corridor Project (GNHCP) Revised draft RAP for Rehabilitation and Upgradation to Intermediate lane/2-lane/2-lane with paved shoulders/4-lane configuration of Paonta-Gumma section (Km 0.000 to Km 94.900) of NH-707 in the State of Himachal Pradesh under GNHCP (3.24 Mb application-pdf)
18-01-2022
16 Green National Highways Corridor Project (GNHCP) RAP for Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bowdara to Vizianagaram section (Km 0+000 to Km 26+937) of NH-516E in the State of Andhra Pradesh under GNHCP (12.16 Mb application-pdf)
24-09-2021
17 Green National Highways Corridor Project (GNHCP) Environmental Assessment Report including Environmental Management Plan for upgrading of Bewar-Pilibhit Section (km 0.000 to km 183.380) of NH 730 C and 731 K (Package I, II, III and IV) in the state of Uttar Pradesh under GNHCP (9.44 Mb application-pdf)
15-09-2021
18 Green National Highways Corridor Project (GNHCP) Draft SIA/RAP for Rehabilitation & Upgradation of NH-730C & 731K in the State of Uttar Pradesh under GNHCP (8.62 Mb application-pdf)
09-09-2021
19 Green National Highways Corridor Project (GNHCP) Resettlement Policy Framework (RPF) for Green National Highways Corridor Project (GNHCP) (3.72 Mb application-pdf)
24-08-2021
20 Green National Highways Corridor Project (GNHCP) SIA/RAP of NH-707 (Gumma-Fediz) in the State of Himachal Pradesh under GNHCP (2.92 Mb application-pdf)
16-04-2021