Sorry, you need to enable JavaScript to visit this website.

You are here

  • Permission for laying 90 mm dia to 280 mm dia underground Distribution pipeline along and across NH-60 from km 207.400 to km 214.000 for underground distribution pipeline under Onda Piped Water Supply Scheme & Onda BRGF Phase-I, PHE Dte. under Bankura Division, West Bengal
  • Proposal for Permission for crossing of 132 KV DCSS Begumganj-Rahatgarh electrical transmission line on National Highways no.146 at km.159 & 160 (Ch. 0.877 km. from 159 km. stone (B/W km. stone 159-160) in Rahatgarh-Sagar section) Tower no. AP-10/0(YB+3) & AP-11/0(YDH+3) in the State of Madhya Pradesh
  • Proposal for Permission for overhead crossing of Gwalior-Etwah Road NH-92 between Ch. Milestones 161 & 162 for construction of Malanpur (220KV)-MES Gwalior 132 KV DCDS Transmission line between angle tower no. AP 8/0-YDH+3 & AP 9/O-YB+3 in the State of Madhya Pradesh
  • Proposal for permission for overhead crossing of 220 KV S/C Balotra-Boranada Line at 400 KV GSS, RVPN Pachpadra over NH-25 (Jodhpur-Pachpadra road) at Km. 108.20 to 108.60 by RVPN, Barmer in the State of Rajasthan
  • Permission of Road Crossing & Parallel laying along the Ujjain-Agar road boundary for DI and HDPE pipe laying work for Indokh MVS District Ujjain in Ujjain-Jhalawar 2-lane with paved shoulder section of NH-552G in the State of MP/Rajasthan Border
  • Four Laning Oddanchatram Bypass from Km 23.230 to Km 30.900 of NH-209 (New NH.No.83), (Design chainage from Km 23.100 to Km 33.200) under NHDP-IV in the State of Tamil Nadu on EPC Mode – Proposal for Erection of 22 KV Over Head Transmission Line and EB Poles at Km 27+800 to Km 27+500, Km 27+100 to Km 26+100 LHS & Km 26+100 to Km 26+270 RHS along the Road and Crossing the Road at Km 26+100 of Oddanchatram Bypass section of NH-209 in the State of Tamil Nadu
  • Two Laning with Paved Shoulders of Dindigul-Theni Section from Km 2/750 to Km 73/400 of NH-45E and Theni-Kumili Section from Km 215/000 to Km 273/600 of NH-220 in the State of Tamil Nadu
  • Laying of TWAD water supply pipeline along the road from Km.37/020 to Km.44/275 (LHS); Km.37/800 to Km.39/725 (RHS); Km.40/970 to Km.41/450 (RHS); Km.47/700 to Km.48/900 (LHS); Km.48/700 to Km.49/100 (RHS); Km.49/100 to Km.56/300 (RHS) & Km.55/150 to Km.55/600 (LHS) by Open Trench Method & across the road at 7 locations by Trenchless Method on Madurai–Ramanathapuram section of NH-49
  • Laying of TWAD Water pipeline along the road from Km.9/880 to Km.17/150 (RHS); Km.12/220 to Km.12/860 (LHS); Km.17/150 to Km.17/750 (LHS); Km.25/800 to Km.26/800 (RHS); Km.26/800 to Km.29/000 (LHS); Km.29/000 to Km.31/175 (RHS); Km.31/175 to Km.31/825 (LHS); Km.32/280 to Km.37/020 (RHS); by Open Trench Method & across the road at 13 locations by Trenchless Method on Madurai–Ramanathapuram section of NH-49
  • Erection of 22KV Electrical Over Head Transmission line with poles along the road from Km.148/400 to Km.152/000 (RHS) and across @ Km.152/000 in Thirumayam–Manamadurai section of NH-226 (New NH-36)
  • Operation and Maintenance of Hyderabad–Bangalore section from Km 211.000 to Km.462.164 of NH-44 (Total length 251.164 Km)–Permission for laying water pipeline along Kurnool–Ananthapur Section from Km 253/2 to 291/4 for total length of 46.160 Km.
  • Proposal of M/s GAIL Gas limited for Seeking Permission/NOC for proposal of laying of 4”dia Steel Gas Pipeline in 3 locations with OFC/DUCT in Dehradun district in the State of Uttarakhand at following locations by Open Trench Method: i) From Chainage 171+150 (Bhaniyawala VUP) to Km.179+200 (Forest Fire Stattion Lal Tappad) (RHS) with 3 crossings at Chainage 171+150, Km.173+720 & Km.174+295 on NH-07 for total length of 8220 meters. ii) From Chainage 208+625 (Tirupati Bala JI dham) to Km.209+150 (MJ Fuels) on NH-34 for total length of 525 meters. iii) From Chainage 160+675 to Km.160+750 & one crossing at Km.160+750 near Lok Pujiya filling station on NH-07 for total length of 120 meters
  • Six laning of Chilakaluripet-Nellore section of NH-16 from Km.1182.802 to Km.1366.547 (length 183.620 Km) in the State of Andhra Pradesh-Permission for laying of 90mm dia HDPE pipeline along NH-16 from Km.1335/520 to Km.1337/460 LHS crossing at Km.1335.520 with 300 dia MS casing pipe
  • Request of Right of Way permission for laying of Electrical Cable/ HDPE Pipe at National Highways NH-34 Road Crossing at Km. 20.204, 40.249, 54.173 & at Km. 54.175 on Kanpur–Kabrai Section in the State of Uttar Pradesh
  • Proposal seeking ROW permission for crossing of 400KV Amreli-Vadinar Line on D/C ACSR Moose Conductor Tower Overhead Line to NH151-A between km 68+000 and Km 69+000, 863+65mr from Km 68+000 and 136+36mr from Km 69+000, Village-Vadaliya Sinhan, Talika-Khambhaliya, District-Devbhoomi Dwarka in the State of Gujarat
  • Six Laning of Ahmedabad to Vadodara section of NH-8 from Km.6.400 to Km.108.700 (Length 102.300 Km) and Improvement of Ahmedabad-Vadodara Expressway from Km.0.000 to Km. 93.302 in the State of Gujarat Length (93.302 Km.) under NHDP Phase-V on Design, Build, Finance, Operate & transfer (DBFOT) Toll Basis
  • Proposal seeking ROW Permission for overhead crossing of 66KV Line across NH-48 at Km 46+100, Village-Sandhana, Taluka-Matar, District-Kheda on Ahmedabad-Vadodara section of NH-48 in the State of Gujarat
  • Proposal seeking ROW Permission for laying of 300mm Dia (Casing Pipe 500mm Dia) Water Pipeline across NH-751 at Km 1+060 on Ahmedabad-Dholera section of NH-751 in the State of Gujarat
  • Permission of laying steel and MDPE gas pipeline along with OFC for city Gas Distribution project along and across NH-77. (1) Along/across NH-77-from Turki (Near Ashutosh Petroleum-Indian Oil Petrol pump), Muzaffarpur (proposed chainage 37+000 km) to Ramdayalu Nagar, Muzaffarpur (proposed chainage 46+300 km). (B) Installation of isolation value chamber along road
  • Balance work of 4-laning of Fagne- Maharashtra/Gujarat Border Section of NH-6 from Km.510.000 to Km.650.794 in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojna-Under Jal Jivan Mission-Permission for laying water supply line for Vadjai water supply scheme Tal/Dist. Dhule crossing at Ch. 520.220 of NH-6
  • Proposal for permission to M/s Uttarakhand Peyjal Nigam for laying for following Water Pipelines in Roorkee-Haridwar stretch of NH-58 in District-Haridwar in the State of Uttarakhand
  • Permission for laying 24" Dia underground Natural Gas Pipeline along with OFC across NHIDCL Guide Bund A1 and A2 for proposed Guwahati-Numaligarh-Itanagar-Dimapur Pipeline Project (along with OFC) in the State of Assam
  • Proposal for laying underground water pipeline on NH-45 Extn. Crossing at 04 places Ch. 42.90, 50.70, 54.40, 59.05 Jabalpur-Kundam-Shahpura section at different location under Chhitakhudri complex pressurized pipeline Irrigation project in the State of Madhya Pradesh
  • Proposal for Right of Way regarding Permission of crossing of 1300 mm dia. water supply pipe line across NH-146 at 137.05 KM village-Merkhedi, Teh- Rahatgarh, District-Sagar, under Bina pressrized pipeline Irrigation project Phase-1 in the State of Madhya Pradesh
  • Two Laning with Paved shoulder of Chhapra-Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to Km 74+359 (Design Chainage), (Total Design length 73.079 Km) in the State of Bihar under NHDP-IV on EPC mode
  • Permission for laying proposed 18" dia Gas Pipeline with OFC along and across NH-34 (Old NH-119) to develop CGD Network in Bijnor District of Uttar Pradesh
  • Permission for laying of HPCL's underground Natural Gas Supply Pipeline along NH-16 (Old NH-6) from Uluberia (Ch 52.430) to Barunda (Ch 67.695) (4" dia. of pipe) RHS in Howrah District in the State of West Bengal
  • Proposal for permission for laying 660 mm dia Crude Oil pipelines across (i) NH-333A at km 21.270,(ii) NH-133 at km 14.115 & km 42.927 and (iii) NH-114A at km 38.745
  • Proposal for Construction of Overhead 11 KV Electricity Line along NH-09 from Km 142+440 to Km 144+300 from Lodhipur to Chaudharpur (33/11 KV Electricity Sub-station Chaudharpur to A.D.B. ) under F.S.P. Project
  • Permisison for laying of MS Pipe 300mm in casing with 400mm MS Pipe for water line purpose at Butibori across Nagpur-Hyderabad section of NH-44 in the State of Maharashtra
  • Permission for laying of Underground 8” dia steel and 125mm MDPE Natural Gas along with 40mm duct Pipeline from Km.362/310 to Km 363/320 for the length of 1010 mts along NH-44
  • NHAI,PIU,TRICHY-Padalur-Trichy section of NH-45 (New NH-38) –TWAD Board–CWSS to 109 habitations in Lalgudi and Pullambadi Unions of Trichy District under Jal Jeevan Mission for laying of water pipe line along the road from km.310/100 to km.310/480 (LHS), km.310/100 to km.310/330 (RHS) for a total length of 610m and crossing at km.310/100 (73.5m) by open trench & HDD method
  • Proposal for grant of permission for laying and crossing of Irrigation Water Pipeline of WRD, Kota at Ch. 431+840 to 442+010 of NH-148N (New NH no. NE-4) (Pkg-16) of Delhi-Vadodra greenfield expressway in the State of Rajasthan
  • Construction of Khetri-Narela 765 KV transmission line (Zebra AL-59) associated with transmission scheme for evacuation of Power from Solar Energy Zones in Rajasthan (8.1) GW under phase-ll, Part-G through Tariff Based Competitive Bidding (TBCB) route-Proposal for Power Line Crossing
  • Permission for laying of water supply pipeline along Hyderabad-Bangalore section of NH-44 from Km 415.500 to Km 441.000 (RHS) (From KIA Motors to Palasamudram junction) totalling to a length of 25500m
  • Proposal seeking ROW permission for laying 90mm Gas Pipeline along NH-48 from Km 46+930 to Km 47+140 (Total Length 210m) on Ahmedabad–Vadodara section of NH-48 in the State of Gujarat
  • NHAI-RO-Madurai-PIU-TRICHY-Trichy–Madurai section of NH-45B (New NH-38)–Laying of API 5L GR X 52, 8” X 6.4MM Thickness of CS underground Gas Pipeline along the road from Km.21/200 to km.26/890 (RHS) (5690m), km.26/890 to km.27/290 (LHS) (400m) and across at km.26/890 for a total length of 6158.17 meters
  • Laying of APL 5L GR X 52, 6” X 6.4mm Thickness of CS Underground Gas Pipeline along the road Km.28/893 to Km.33/600 (RHS) of NH-336 Pudukkottai–Trichy Section (Erstwhile Trichy–Karaikudi section of NH-210) for a length of 4707 meters
  • Laying of APL 5L GR X 52, 6” X 6.4mm Thickness of CS Underground Gas Pipeline along the road from Km.118/000 to Km.124/650 (LHS) of Trichy Bypass on NH-67 (New NH-83) connecting (Thuvakudi-Mathur-Panchappur road) for a length of 6650 meters
  • Proposal for Permission for crossing of 400 KV D/C (Overhead) electrical power transmission line NH-752C at km.15+0.306, Near Village-Talen,Tehsil-Sarangpur, District-Rajgarh in the State of Madhya Pradesh
  • NHAI,PIU,TRICHY–Ulundurpet–Padalur section of NH-45 (New NH-38)–Issue of NOC permission for Laying of APL 5L GR X 52, 10’’x6.4MM Thickness of CS underground Gas Pipeline along the road from Km.259/000 to Km.269/000(RHS), Km.268/150 to KM.278/270(LHS) and Crossing @Km.269/000 &Km.278/270 of NH-38 in Tamil Nadu State
  • Proposal for grant of permission for underground crossing of 11 KV Electric Cable (3 Core 185 Sqmm XLPE Cable) on Chittorgarh-Udaipur road section of NH-48 (old NH-27) at Km. 302+695, Village-Tulsidas Ji Ki Sarai in the State of Rajasthan by AVVNL
  • Proposal for grant of permission for overhead crossing LILO of 132 KV S/C Dausa-Bassi Transmission Line to 132 KV GSS RVPNL Chordi Line on NH-NE-4C (Bandikui to Jaipur 4-lane Green Field exp.) from Ch. 25.530 to 25.540 with one road crossing ROW applied in the State of Rajasthan by RVPNL
  • Proposal for grant of NOC for laying underground electric cable (Cable with 200 HDPE WS Pipe, IS-14930, 4 Inch dia) from Route-1, Ch.123+485 to 123+660 (LHS) and crossing at Ch. 123+490 on Delhi-Jaipur road section of NH-8 (New NH-48) at Neemrana, District-Alwar in the State of Rajasthan by JVVNL
  • Application for the Permission to lay optical fiber cable on NH-547 at Chhindwara-Amarwada-Narsinghpur Road from Chhindwara Km. 97+444 to Amarwada Km. 129+750 to Harrai Km. 165+720 & Harrai Km. 170+120 to Narsinghpur Km. 210+010. Total section length ROW applied for 103+166 Km. in the State of Madhya Pradesh
  • Proposal for laying proposed 24” dia Steel Gas pipeline with OFC Duct along the road on NH-44 from Km 140/170 to Km 156/712 (LHS), Km 164/900 to Km 170/200 (RHS) & Km 170/200 to Km 180/000 (LHS) and acrossing at Km 140/170 & Km 170/200 for a total length of 31.72 km (Krishnagiri to Thumbipadi section) by Open Trench Method in the limit of NHAI, Salem
  • Permission for laying of 10" OD x 0.281" WT MS Natural Gas Pipilene alng with 40mm OFC and 125mm MDPE pipe across NH-53 at chainge 567+450 km at Ainthapalli Chowk
  • NOC proposal for crossing of 4” Dia Steel Gas Pipeline NH-5 at km.126.150, km.126.200, km.126.645, km. 129.700 and km.134.800 Ludhiana-Moga Road in the State of Punjab by HDD method
  • Permission for overhead crossing of 33 KV XLPE cable along NH-53 from Ainthapalli chowk i.e km.567+500 to Remand Chowk i.e 4.6 km. (LHS) and three numbers of crossing at km.4+600 near Remed km. 567+500 near Ainthapalli Chowk & km. 5+200 (Near Railway LC)
  • Proposal for laying OFC Cable from Ch. km 23.950 to 24.500 (LHS) along National Highway No.48 of Delhi Gurgaon Section in the State of Haryana
  • Permission in respect of laying 8 (eight) nos. underground cable along the NH-34 (new NH-12) on the west side of Jessore road from Bankra More at km 16.780 to B.T. College More at km 18.640 to facilitate WBSEDCL’s utility shifting work for the facilitation of Metro corridor
  • Permission for laying of IOCL's CGD pipeline network in NHAI corridor along the NH-6 (New NH-16) from Km 76.00 to Km 112.245 and also 2 nos crossing on NH-6 (New NH-16) under City Gas Distribution Project Haldia in the State of West Bengal
  • Permission for laying of water pipeline along Kurnool-Kadapa section of NH-40 from Orvakal at Km 336+830 to Pudicherla at Km 341+430 (RHS) for a length of 4660m in the State of Andhra Pradesh
  • Permission for laying of DI water pipelines by crossing NH-565 at 6 locations in between Km 452+930 to 497+240 on Penchalakona–Yerpedu Section of NH-565 for a total length of 235m by M/s. APIIC in the State of Andhra Pradesh
  • Permission for laying of gas pipeline of 12”(305 mm) Carbon Steel pipe & 40 mm OFC duct along the road from Km 134/890 to Km 135/550(LHS) & from Km 135/550 to Km 136/300(RHS) & from Km 136/300 to Km 136/360(LHS) & from Km 136/360 to Km 137/000(RHS), from Km 137/000 to Km 141/000(LHS) from Km 141/000 to Km 155/860(RHS) from Km 155/860 to Km 158/170(LHS) for a total length of 23.280 Kms and crossings at Km 135/550, Km 136/300, Km 136/360, Km 137/000, Km 141/000 & Km 155/860 along AP/TN Border-Nalagampalli Section of NH-4 by M/s. AG&P Gas Pvt. Ltd. for a total length of 23.280 Kms in the State of Andhra Pradesh
  • Permission for laying of gas pipeline of 12” dia. Steel pipeline, 125 mm dia MDPE Gas pipeline & 40mm HDPE Duct for OFC Cable along Renigunta–Naidupeta section of NH-71 from Km 124/600 to Km 128/200 LHS (from KLM Circle near NH-205 to Renigunta Circle) for a total length of 3400m and crossings at Km 124/600 & Km 128/000 by M/s. AG&P Gas Pvt. Ltd., in the State of Andhra Pradesh
  • NHAI, PIU, TRICHY–Trichy–Madurai section of NH-38 (Old NH-45B)–TWAD Board–CWSS to 174 habitations in Manikandam and Anthanallur unions of Trichy District under Jal Jeevan Mission for laying of water pipe line along the road from km.14/950 to km.15/000 (50m), km.11/200 to km.11/690 (490m), km.11/690 to km.11/940 (250m), km.11/980 to km.12/800 (820m) km.12/800 to km.12/830 (30m HDD method) on LHS & km.14/950 to km.15/000 (50m), km.11/200 to km.11/690 (490m), km.11/940 to km.11/980 (40m) on RHS and across at km.15/000,11/690, km.11/940, km.11/980 for a total length of 2400m by open trench & HDD method
  • Laying of TWAD Water pipeline along the road from Km.115/000 to Km.118/500 (LHS); Km.118/500 to Km.118/750 (RHS) for a length of 3.750Kms by Open Trench method & across the road in 3 locations at Km.115/000, Km.117/650 & Km.118/550 by Trenchless Method on Karaikudi–Ramanathapuram section of NH-210 (New NH-536)
  • Erection of 33KV Over Head Transmission Line by crossing the NH road at Km.135/550 of Trichy Bypass (connecting Thuvakudi–Mathur–Panjappur) on NH-83 (Old NH-No.67)
  • Providing water supply to Prioritized Industrial Clusters in the State of Andhra Pradesh–Southern region (APIIC-VICDP-05)–Laying of DI Water Pipeline across Tada-Nellore Section of NH-16
  • Proposal for laying proposed 16" dia multi product pipeline with OFC Duct along the road on NH-44 from Km 142.074 to Km 156.000 (RHS) & Km 164.900 to Km 180.000 (RHS) for a total length of 29.026 Km (Krishnagiri to Thumbipadi section) by Open Trench Method in the limit of NHAIL Salem by M/s Bharat Petroleum Corporation Limited, Chennai
  • Proposal for laying of Pipeline from (1) km 184.700 to km 186.000 (LHS) (2) km 194.000 to km 195.800 (RHS) (3) km 206.600 to km 214.800 (RHS) and crossing at (1) km 184.800, (2) 194.000 (3) 206.400, (4) 206.600, (5) km 212.200, (6) 212.500 on Amravati Chikhali section of NH-53
  • Proposal for permission for laying underground MDPE Natural Gas Pipeline for city Gas Distribution Network in Latur Municipal Corporation Area by M/s Unison Enviro Private Limited (UEPL) along from Ch. Km 72.466 to km 72.589 and across at Ch. km. 72.466, km 74.133 of Ausa-Chakur section of NH-361
  • Proposal for laying of Pipeline from (1) km 226.100 to km 229.100 (2) km 261.950 to km 262.100 and crossing at (1) km 226.160, (2) 254.800 (3) 261 .950, (4) 267.450 on Amravati Chikhali section of NH-53
  • Proposal for grant of permission for laying PHED Pipeline with 4 nos. road crossing for drinking water pipeline between Mitrapura, Sikndra, Balahedi Mode, Mahua on Agra-Jaipur road section of NH-21 laying from Km. 117+670 to 169+600, Km.171+600 to 172+280(LHS) & 172+280 to 178+840(RHS)& 4no.crossing at Km. 118+720,124+465, 154+480 & 172+800 by HDD (Total length 59370 mtr.) under water supply project for work of transmission main from Isarda Dam to WTP, IPS Bagri and CWRs for various clusters of Distt-Dausa, construction of WTP, Pump house and CWR under Isarda Dam water supply project under Jal Jeevan Mission (JJM) Distt-Dausa Pkg-Ist) by PHED
  • Proposal seeking ROW permission for Overhead Crossing of 66KV S/C on D/C Sevaliya (Thermal tower)–Fagwel Transmission Line across Ahmedabad–Indore NH-47 between Km 66+000 and Km 67+000 in the State of Gujarat
  • Proposal seeking ROW permission for laying of pipeline on NH-53 Songadh to Uchhal road crossing at Km 122+970 for Purva Songadh Juth Paani Purvatha Yojna, Talula- Songadh, District-Vyara in the State of Gujarat
  • Proposal seeking ROW permission for road crossing between on NH-53 between Songadh to Vyara for laying of pipeline at Km 108+385 under East Songadh Juth Paani Purvatha Yojana, Taluka-Songadh, District-Tapi in the State of Gujarat
  • Proposal for laying of water supply pipeline along and across the road on section of National Highways-44 at village Patan Bori and 18 village Rural Regional Water Supply Scheme under (Jal Jeevan Mission) Ta.-Kelapur, District-Yawatmal
  • Proposal seeking ROW permission for laying of underground 315mm Dia HDPE Pipeline across NH-47 (Godhra to Gujarat/MP Border section) at Km 154+300, Near-Village-Piplod, Taluka-Devgadh Baria, District-Dahod in the State of Gujarat
  • Widening of existing 2 lane carriageway to 4/6 lane carriageway configuration for Dhule–Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra - Proposal of Maharashtra Jeevan Pradhikaran, Nashik for Crossing Water Supply Pipeline at Km. 330.070 across NH-3
  • NHAI, PIU-Chengalpattu–Highway Administration Tambaram to Tindivanam section of NH-45 from Km.28/000 to Km.121/000 in the State of Tamil Nadu-Construction of New Storm Water Drain by CMDA in Kilambakkam Village
  • Permission for laying water pipeline along Hyderabad–Bangalore section of NH-44 from Km.439.600 to Km. 452.100 (RHS) (from IP Gudipalli to Kambalapalli Cross road)