Sorry, you need to enable JavaScript to visit this website.

You are here

  • ROW Permission for laying of 26"dia (660mm) crude oil piepline along with optic fibre cable through HAB menthod across AH-02 at km 36.065 near village-Binnaguri, Rajganj Block under Jalpaiguri district, West Bengal
  • NHAI-RO Kerala- (i) Four laning of Thalassery-Mahe bypass section of NH-17 from km.170.600 (design chainage km 170.600) to km 188.000 (design chainage km 189.200) under NHDP Phase -IIl on EPC mode in the State of Kerala & (ii) Six laning of Thaliparamba to Muzhapilangad section from km 137.900 to km. 170.600 of NH-17 (New NH-66) of project length 29.948 Km in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana-Laying of 8 inch Steel and 90mm MDPE Gas pipeline by M/s Indian Oil Adani Gas Pvt.Ltd. from Km.161+020 to Km.188+700 in NH-17(New NH-66)
  • ROW permission for laying of secondary rising main across NH-34 in between km 30.875 to km 30.925 at Santoshpur more in connection with Habra-Gaighata surface water supply scheme under Barasat Division, PHE Dte. in the State of West Bengal
  • Permission applied by Summit lnfrastructure for installation of 01 telecommunication Tower at NH-33 between Ranchi-Ragamgarh, Chuttupalu
  • Two Laning with Paved shoulder of Chhapra-Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to Km 74+359 (Design Chainage), (Total Design length 73.079 Km) in the state of Bihar under NHDP- IV on EPC mode : - (A) Permission of laying steel and MDPE gas pipeline along with OFC for city Gas Distribution project along and across NH-102. (1) Along/across NH-102 from Nehru chowk, Chhapra (proposed chainage 01+300km) to Near Sarika Fuels-indian Oil pump Garkha, Saran (Proposed chainage 15+735 km) (B) Installation of isolation value chamber along road.
  • Two Laning with paved shoulder of Chhapra - Gopalganj section of NH-85 from Km 0+000 to Km 93+500 (Existing Chainage) and Km. 0+000 to Km. 94+258 (Design Chainage), (Total Design length: 94.258 Kms.) in the State of Bihar under NHDP -III on EPC mode: - (A) Permission of laying steel and MDPE gas pipeline along with OFC for city Gas Distribution project along and across NH-85. (1) Along/across NH-85 from Brahmpur, Chhapra, Saran (Proposed Chainage 0+000 km) to Kopa, Saran (Maa Petroleum-Indian Oil Pump (proposed chainage 08+556 km) (B) Installation of isolation value chamber along road.
  • Proposal for permission of underground 3C x 400 Sqmm XLPE & 3C x 300 Sqmm XLPE Cable along the NH-33 {U/G) from Chainage no. (243+690 to 248+703 Parallel to NH) on NH-33, Ranchi-Tatanagar section from PSS Kali-Mandir to GSS Baliguma of District- East Singhbhum in the state of Jharkhand
  • NHAI-PIU-Kolhapur- Four Laning of Satara - Kolhapur to Maharashtra State Border Section of NH-4 from Km 592.240 to Km 725.000 in the State of Maharashtra- Proposal for grant of permission for laying of BSNL 48 F OFC along NH-4 in section Kolhapur to Kagal at Km 603.200 to Km 607.000 in the state of Maharashtra
  • Proposal seeking Permission for laying underground Water Supply Pipeline along RHS towards increasing chainage of NH-37 in Dibrugarh from Km 592.104 to 598.579 (6.474 Km) and crossing NH-37 in 03 locations at Ch 583.464, 593.474 & 596.798 by Assam Urban Water Supply and Sewerage (AUWSS) Board under Dibrugarh NH Division, Dibrugarh, Assam.
  • Permission for laying undergrounded Optical Fibre Cable along Kurud Ms: Km 52.00 to Dhamtari Ms: Km. 77.00 (25 Km length) on NH-30 Raipur-Dhamtari-Jagdalpur section road in the State of Chhattisgarh
  • Proposal for grant of permission to carry out horizontal direct drilling and open trenching works for laying OFC telecom duct/cable (02 Nos,) along NH Jurisdiction on NH-52 (Old NH-13) Solapur - Vijapur Highway Ch. 5/500 to 13/500, total length of 8000 Mtr, in the State of Maharashtra. Applicant: Dinesh Engineering Ltd, DEPL House, Neighborhood shopping Complex, Sector-4, Navi Mumbai-400706.
  • Accordance of Permission for Laying of underground 8” dia. Steel Gas Pipeline along with 125mm MDPE Gas Pipelines across NH-766 (Khozikod — Kollegala) at KM 205/06 near Bandipalya, Mysuru in the state of Karnataka
  • Permission for laying of underground optical Fiber Cable on Jaipur Jabalpur section Jhalawar city of NH-52 from RHS Ch.328.760 to Ch.334.700=5.940 km & Two Crossing 40 mt Total Route 5940+80=6020 mt in the state of Rajasthan
  • Six Laning of Bengaluru-Nidaghatta Section of NH-275 - Issue of NH Access permission for Laying of 273.1mm dia steel gas pipeline and 125mm dia MDPE pipeline from Byramanagala circle Ch:327.200km to IOCL Petrol bunk along the Existing stretch Bengaluru-Mysuru Section of NH-275
  • Proposal for Permission for laying Optical Fibre cable (OFC) along NH-40 by M/s Telesonic Networks Limited from km 299.000 to km 299.700 (LHS) of NH-40 of Kurnool - Chittoor road for a total length of 700mtrs in Chittoor District in the State of Andhra Pradesh
  • Proposal for Permission for laying underground Optical Fibre cable (OFC) along the road NH-365BB by M/s Vindhya Telelinks Limited from km 8/400 to km 12/749 (RHS) of NH-365BB and crossing at km.8/400 (RHS-LHS) of Jeelugumilli to Jangareddygudem section land at Ankampalem to Rowthugudem villages, West Godavari District in the State of Andhra Pradesh for a total length of 4349mtrs
  • Permission for laying of Water Supply Pipeline under Mega PWS to Lepripara, Tangarpali, Sundargarh, Bargaon, Subdega, Balisankara block of Sundargarh District at km 265/450 of NH-49 in the state of Odisha
  • Six Laning of Surat-Dahisar Section of NH-8 from Km 263.000 to Km 502.000 (Length Km 239.000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V. Proposal for ROW Permission for Laying of 11Kv U/G Cable Line with 185 Sqmm XLPE Power Cable Crossing at Km 365+852 of NH-48, Near Amidhara Complex, GIDC Char Rasta, Vapi, District-Valsad for Erection of New 11KV Lav-Kush Feeder by DGVCL in the state of Gujarat
  • Proposal for laying of underground Gas Pipeline along the road from Km 19/710 to Km 22/000 and Km 22/400 to Km 23/350 on RHS by Open Trench Method and Km 22/000 to Km 22/400 on RHS by HDD Method and across the road at two locations at Km 19/710 and Km 23/350 by HDD Method in Inner Ring Road (SH-02)
  • Submission of Proposal towards permission of laying DI water pipeline along km 19.960 to km 20.350 & across km 19.960 (Dia 350mm) of NH-35 at Mouza-Maniknagar, P.S.- Ashoknagar & District- North 24 Parganas in the State of West Bengal
  • Submission of National Highway crossing proposal of "132 KV D/C Jarauda Nara- Sakoti Transmission Line” village-Sakoti, Km. 84+220 at new NH-234 (Old NH- 58) District-Meerut in the State of Uttar Pradesh
  • Submission of National Highway crossing proposal of "132 KV D/C Sakoti-Hapur overhead High Tension Transmission Line" village-Sadikpur, Km. 40+400 at NH- 235 (New NH-334) (Meerut-Bulandshahr Road) District-Hapur in the State of Uttar Pradesh
  • Submission of National Highway crossing proposal of "132 KV D/C Jarauda Nara- Sakoti Transmission Line” village-Sakoti, Km. 84+460 at new NH-234 (Old NH- 58) District-Meerut in the State of Uttar Pradesh
  • Submission of National Highway crossing proposal of "132 KV D/C Sakoti-Hapur Transmission Line" village-Masuri, Km. 19+230 at NH-119 (Meerut-Pauri Garhwal Road) District-Meerut in the State of Uttar Pradesh
  • Submission of National Highway crossing proposal of "132 KV D/C Talheri- Jarauda Nara-Sakoti Transmission Line" village-Bahadurpur, Km. 109+540 at new NH-234 (Old NH-58) District-Muzaffarnagar in the State of Uttar Pradesh
  • Permission for laying of optical fibre cable on NH-19 (towards Kanpur Ch. 394.260 to Ch.396.760 & Ch.398.560 to Ch.403.320) Total section length ROW applied for 7.26 km. and one crossing at ch.398.560 in the State of Uttar Pradesh
  • Permission for laying of optical fibre cable on NH-19 from Ch.423+400 to Ch.425+200 Kanpur (Section 1.820 Km.) & Ch.428+760 to Ch.437+800 towards Etawah side (Section 9.120 Km.) total and 02 nos. of crossing at Ch.423.760 Km. and Ch.432.240 Km. across NH-19 total 2 section length ROW applied for 10.940 Km. the State of Uttar Pradesh
  • Permission for laying of 33KV Electrical Line crossing at Chaiange 21+400 on NH-248BB (Dwarka Expressway) in the State of Haryana
  • Four laning of Amravati - Chikhali section from 166.000 to km 360.000 section of NH-6 in the State of Maharashtra to be executed on DBFOT Pattern under NHDP Phase-IV -Proposal for laying Overhand Optical Fiber Cable from km 277.100 (Shegaon T Point) to km 290.750 (Khamgaon Bypass) & crossing Chainage (i) km 277.100 (ii) km 284.950 (iii) km 288.000 & Khamgaon City (i) Ch. 001.300 Total length = 13.65 km by M/s Maharashtra Information Technology Corporation Ltd
  • Upgradation of four laning Khamgaon of Old NH-6 from km 296.000 to 304.000 (Design length 7.300km) on EPC Mode in the State of Maharashtra - Permission of installation of OFC cable on existing MSEDCL Pole and or erecting new poles along NH-53 of total length = 8.00 km. by M/s Maharashtra Information Technology Corporation Ltd (1) Temburna Fata (293.000- to Balapur Phata (296.000) for 3 kms (2) Khamgaon City Road from km 0.100 to km 5.200 and 3 nos of crossings at (i) km 0.800 (ii) km 1.200 (iii) 1.630
  • Proposal for installation of Overhead Optical Fiber Cable on existing MSEDCL Pole and / or erecting new poles along NH-753C from km 31.800 to 62.900 total length of ROW for 31.1km
  • Rehabilitation & Up gradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the State of Odisha under NHDP-IIl on EPC Mode Package-II- ROW permission of 1.5m wide corridor for laying of iron ore slurry pipeline and return water pipe line along with 02 nos. of OFC in NH- 55 utility corridor from Km.85.800 to Km.89.600 (TSL ROB to Angul bypass) to facilitate the iron ore slurry pipeline project to TSL
  • Permission to lay optical fiber cable on NH-30 from Jabalpur Km. 8784000 to Lakhnadon Km. 892+000 on Jabalpur Bypass Road. Total section length ROW applied for 14+000 Kms.
  • Four laning of Sambalpur Bargarh — Orissa / Chhattisgarh Border Section af NH-06 from Km.0.000 to 88.000 in the State of Orissa to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase-lll - Permission to laying water pipeline along NH-53 at the chainage 14.15km to 61.15km RHS from Silver moon Hotel, A. Katapali, Sambalpur to Chakarkend, Bargarh, towards Raipur and 12 nos. crossing each at chainage 14.15km, 21.85km, 25.24km, 28.21km, 28,21km, 33.55km, 37.00km, 43.60km, 51.67km, 54.25km, 57,20km, 61.15(RHS to LHS) In the District of Bargarh
  • Permission for laying of Sewerage pipeline on Patiala - Rajpura road section of NH-07 (old NH-64, Ch.50.616) at km.293.534 at village Chaura in the State of Punjab by HDD method
  • Proposal seeking permission for laying of OFC cable along NH-169 from Maluru Km 43+400 to Theerthahalli Km 58+400 on LHS for a total length of 15.00 Kms through HDD method by Ms. Telesonic Networks Ltd.
  • Proposal seeking permission for laying of OFC cable along NH 548B from Honwad Km 30.000 to Telsang Cross Km 34.000 on LHS for a total length of 4.00 Kms and 2 nos. crossings through HDD method by M/s. Jio Digital Fibre Pvt. Ltd.
  • Rehabilitation & Up gradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the State of Odisha under NHDP-III on EPC Mode- Proposal for providing ROW permission for laying of Raw water, clear water and distribution pipeline along and across the NH-55 for the work "Execution of Mega PWS to 63 GPs of Odopoda and Hindol Block in Dhenkanal District"
  • Permission to lay Optical Fiber Cable on NH-45 (old NH-12) from Suatala to Tendukheda to Koda Jamuniya road from Km. 100+000 to Km. 130+000 (Map attached) along LHS Total section length ROW applied for 30 Km.
  • Proposal Request for grant of permission for laying GAIL’s proposed 24” dia. Gas pipeline along with OFC Cable across NH 753-F at Km, 140/099 for Gas Distribution Network Mumbai to Nagpur in Aurangabad District., in the State of Maharashtra. M/s GAIL (India) Ltd, Jubilee Tower, B-35 & 36, Sector - 1, Noida (UP)-201301
  • Proposal for Permission for laying underground Optical Fibre Cable (OFC) along the NH-67 road from design ch. km. 375/740 to km 396/600 (RHS) and across the NH-67 road at km 390/400 (New chainge km. 396/600) of AP Karnataka Border to Gooty section and thereafter continuous in left over reach i.e. from km 390/400 to km 393/850 (old Chainage) for a total length of 24310mtrs in Ananthapuramu District, in the State of Andhra Pradesh
  • Grant of NOC for overhead road crossing of 132KV D/C transmission line (Barhi-Itkhori) of JUSNL on NH-33
  • Design Build Operate water Supply System for Khunti Nagar Panchayat-Laying of Public Utility service along and pipeline laying across NH-75E at four locations and along NH-75E on both sides from km 34.228 to km 42.701
  • NHAI-PIU-Kolhapur - Proposed Four laning of Ratnagiri - Kolhapur section of NH - 166 from Km 0/000 to Km 137/285 in Ratnagiri and Kolhapur Districts - Proposal for grant of permission for laying of OFC cable along NH-166 from Kerli Phata to Rajputwadi Phata area for the total length of 1.300 Km in the state of Maharashtra
  • NHAI-PIU-Kolhapur - Proposed Four laning of Ratnagiri - Kolhapur section of NH - 166 from Km 0/000 to Km 137/285 in Ratnagiri and Kolhapur Districts - Proposal for grant of permission for laying of OFC cable along NH-166 from Waghbil HP Pump to Ambawade for the total length of 2.600 Km in the state of Maharashtra
  • Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length 102.300 Km.) and Improvement of Anmedabad-Vadodara Expressway from Km. 0.000 to Km, 93.302 in the State of Gujarat (Length 93.302 Kms) under NHDP Phase V on Desi, Build, Finance, Operate & transfer (DBFOT) Toll Basis. Proposal for ROW Permission for laying of 66KV underground cable line along NH-8 between Km 102+010 to Km 105+470, on RHS (From Fertilizer Nagar Sub-station to Ranoli substation) at Village Ranoli of Taluka & District Vadodara on Ahmedabad - Vadodara Section of NH-48 in the state of Gujarat
  • Laying of underground water pipe line on valley side from Km Ch. 139.900 to 145.500, Ch. 146.000 to 146.125, Ch. 147.100 to 147.425, Ch. 153.000 to 153.825, Ch. 156.475 to 156.708 & Ch. 159.950 to 160.025 (between Ghasti Bend to Zero Point Mussoorie) along NH-707A for Total length of ROW applied for 7.183 Kms in Mussoorie, Distt.- Dehradun in the State of Uttrakhand
  • Proposal seeking permission for canal crossing near Kadaravalli village at Chainage 478.900 of NH -373 of Belur -Bilikere section by Cauvery Niravari Nigam Ltd., through open trench method by Hemavathy Dam Division, Gorur
  • Road cutting permission for laying of 250 mm dia raising main at km 64/500 on NH-316 (Puri Konark link) at Baliguali Chhaka for water supply to Shree Jagannath Medical College, Puri
  • Rehabilitation and Up gradation of Jharpokharia - Baripada — Baleshwar Section of NH-5 (From Km. 0.000 to Km. 80.600) in the State of Odisha under NHDP Phase — IV on EPC mode — Application for seeking permission for laying of GAIL’s proposed 18" OD x 0.281” WT MS Natural Gas Pipeline along with 40 MM OFC across NH-18 at chainage 73.861
  • 6- laning of Chandikhole- Jagatpur- Bhubaneswar section of NH-16 from Km.413+000 to Km.418+000 and Km.0+000 to Km.624000 (Length 67 Kms) in the State of Odisha to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase-V- Permission for laying 8" diameter carrier steel gas pipeline for supply of gas to various consumers / customers in route of proposed steel gas pipeline for Cuttack City Gas Distribution project along with 40mm dia HDPE duct for OFC along the service road from Km.21.310 to Km.21.430 (RHS) and across at Km.21.034 on NH-16
  • Proposal of grant of permission of laying OFC cables (along 2 ducts) of Mfs Jio Digital Fiber Private Limited in between NH-52 (old NH-211) from Beed bypass T-point km 184.000 to Padalsingi km 197.400 length 13.400 km and Beed bypass T-point km 184.000 to Beed bus stand km. 179.400 length 4.600 km for total length of 18 km. in the State of Maharashtra
  • Construction of 8 Lane Dwarka Expressway (NH-248BB Package-IV) from Rail Over Bridge (RoB) till end point Km.40-H-SPR intersection near Kherki Daula of 8.76 Km length from Km 19.700 to 28.460 in the State of Haryana on EPC mode-Permission for laying of 33 KV Electrical line crossing at Chainage 21+400 on the NH- 248BB (Dwarka Expressway) in the State of Haryana
  • Accordance of Permission for Laying of 4” dia. Steel & 125 mm dia. MDPE Gas Pipelines and installation of Sectionalizing Valve Chamber along NH-766 (Khozikod — Kollegala) from Km 203.800 to 205.920 on RHS, Km 198.085 to 199.950 on LHS and road crossing at Km 198.189, near Mysuru in the state of Karnataka
  • Permission to lay Optical Fibre Cable along Abhanpur MS:Kms 28.00 to Kurud MS: Kms 53.00 on NH-30 Raipur-Dhamtari-Jagdalpur length ROW applied section road in the state of Chhattisgarh. (Total for 25.00 Kms.)
  • Proposal for grant of permission for laying Optical Fiber Cable along / across Mantha Lonar road NH-548-C from Km, 20/000 to Km, 33/300 for a total length of 13.300 Km, in the State of Maharashtra Applicant: M/s Reliance Jio Infocomm Ltd, at RO, 3d Floor, Marker Chambers IV, 222, Nariman Point, Mumbai-400021
  • Four/Six Laning of Gujarat/ Maharashtra Border - Surat - Hazira Port Section of NH-6 (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Proposal for ROW Permission for crossing of 7 Nos. D/C (6+1) of Single Core 66KV_XLPE U/G Cable along (b/n Km 39+550 and Km 41+670) & Across at Km 39+550 in Premises of NH-53 from 220KV Popda 5/5 to 66KV S/S Under Kinshan Sarvoda Yojana in the state of Gujarat
  • Proposal for grant of permission for laying Optical Fiber Cable along /across Watur - Mantha - Devgaon - (Watur to Jlni Phata) NH 752 |, Section from Km, 0/000 Km, 9/000 for the total length 9.00 Km, in the State of Maharashtra. Applicant: M/s Reliance Jio Infocomm Ltd, at RO, 3" Floor, Marker Chambers IV, 222, Nariman Point, Mumbai-400021
  • Proposal for permission of crossing pipeline of National Highway road Katghora to Ambikapur on NH-130 at Ch.116.1 (Village Lamna) and Ch.122.085 (Village Kapanawapara) in the State of Chhattisgarh
  • Grant of Permission for laying and crossing of OFC by MahaIT across National Highways -06 in Jalgaon district in the State of Maharashtra
  • Four laning of Rohtak to Hisar section of NH-10 (from km 87+000 to km 170+000) including connecting link from Km 87+000 (NH-10) to Km 348+000 (NH-71) to be executed as BOT (Toll) laying Project on DBFOT Pattern under NHDP Phase III in the state of Haryana-NOC for Permission for S/STM. of 33KV Line double circuit (1 no. overhead and 1 no. underground) for new 33 KV DHBVN, Airport, Hisar for 220KV S/STN. Industrial Area Hisar within the Jurisdiction of Hisar on Rohtak to Hisar Section of NH-10 (New NH-09), at Km. 173.300 to 177.600 (RHS) in District Hisar
  • Proposal for grant of permission to carry out horizontal direct drilling and open trenching works for laying OFC telecom duct/cable (02 Nos,) along NH Jurisdiction on NH-166-E, Solapur - Mangalwedha - Jat Highway from Ch. Km, 18/980 to 31/254 and Crossing 22 Mtr total length of 12.296. Mtr. in the State of Maharashtra. Applicant: Telesonic Networks Ltd, 4th Floor D Building Vega Center Shankarsheth Road, Swargate Pune
  • Proposal for grant of permission to carry out horizontal direct drilling and open trenching works for laying OFC telecom duct/cable (02 Nos,) along NH Jurisdiction on NH-753-B, Shewali - Nizampur - Nandurbar - Taloda - Akklikuva - Gujrat Border Highway from Km, 58/200 to 67/700, total length of 9500 Mtr, in the State of Maharashtra. Applicant: M/s Vodaphone/Idea Infrastructure Ltd, Vodaphone House, Corporate Road, Prahlad Nagar, SG Highway, Ahmedabad- 380051.
  • Puintola to Ichhapuram Section from (km.419,600 to km.484.000) of NH-5 in the State of Odisha- Proposal for National Highway Crossing at Km.442+800 on NH-16 for laying of 33 KV Power Supply of IISER, Berhampur
  • RO - Vijayawada - Permission for laying of OFC Cable (M/s.Vodafone Idea Telecom Infrastructure Limited) using HDD Method along the road on LHS & RHS from Km. 430/140 to Km. 430/600 and across the road from LHS to RHS at Km. 430/140 and Km. 430/600 on Chilakaluripet - Vijayawada section of NH-16 at Vaddeswaram Village | & Tadepalli Mandal, Guntur District, Andhra Pradesh
  • NHAI, PIU, Chennai — Permission for laying of underground Gas pipeline along the road from Km 286/870 to Km 338/030 (51160 m) on LHS by Open Trench Method and HDD Method in the State of Andhra Pradesh and from Km 0/000 to Km 03/770 (3770 m) on LHS by Open Trench Method and HDD Method in the State of Tamil Nadu in Tirupathi -Tiruttani - Chennai section of NH-205
  • Proposal for ROW clearance for NH crossings and laying along NH road from Km.3.83 to Km.63.95 (LHS & RHS) on NH-53 in connection with Mega Piped Water Supply Project to Mahakalpada and Marshaghai Blocks in Kendrapada District
  • NHAI, PIU, Chennai — Permission for laying of underground Gas pipeline along the road from Km 03/770 to Km 16/000 (12230 m) on LHS by Open Trench Method and HDD Method in the State of Tamil Nadu in Tirupathi -Tiruttani - Chennai section of NH-205
  • Permission for the proposal to lay OFC along NH-766 (Old NH-212, Khozikod - Kollegala) from Forest Check post Km 136.600 to Maddur Km 138.000 on LHS for total length of 1.40 Kms, near Gundlupet Taluk, Chamarajanagara District in the state of Karnataka
  • Proposal seeking permission for laying of underground 12”/8”" dia steel Gas pipeline along with 125mm MDPE Gas pipelines and installation of sectionalizing valve of chamber (Size 1.00M X 2.5 M) along NH-275K- 41.535 through open trench method and 5 nos crossings at km. 1.87, Km. 23.920, Km. 28.260, Km 29.080, Km. 34.857 through HDD method by AGP City gas private limited, Mysuru
  • Underground National Highway (NH-30) Crossing of our 33KV HT Transmission Line
  • NHAI - PIU, Salem - Proposal for laying of Water Pipe Line along the NH-7 from Km 206/295 to Km 206/385 - 90m (RHS), Km 207/825 to km 210/240 - 2415m (LHS), Km 210/240 to Km 211/745 - 3130m (LHS & RHS) by open trench and across the road by HDD Method at Km 206/295 - 29.50m, Km 210/240 - 58m & Km 210/250 - 58m, by the Executive Engineer, Tamilnadu Water Supply and Drainage Board, RWS Division, Salem - Approval requested
  • NHAI - PIU, Salem - Proposal for laying of Water Pipe Line along NH-47 from Km 4/890 to Km 7/400 - 2510m (RHS) by open trench by the Executive Engineer, Tamilnadu Water Supply and Drainage Board, RWS Division, Salem - Approval requested
  • NHAI - RO Hyderabad - PIU Hyderabad- Proposal for crossing of 400KV QMDC line from 400/220KV Veltoor SS to 400/11KV Yedula LISS under Palamoor-Crossing of 400KV line between km.125+200 to Km.125+400 near Kanimetta Village on Hyderabad to Bangalore section of NH-44 in the State of Telangana
  • NHAI - RO Hyderabad - PIU Hyderabad- Proposal for crossing of 765KV D/C Hyderabad Kurnool Transmission line - Crossing of 765 KV D/C line at Km.45+896 on Hyderabad to Srisailam section of NH-765 in the State of Telangana
  • Proposal for grant of permission for laying Optical Fiber along Pune to Male Village NH-753-F, Ch. Km, 1/275 to 31/400 Km, in the following stretches, a) From Ch. Km, 04/850 to 05//50, (from Bhugaon Internal road to Reliance Jio OFC Chamber) total length 1000 Mtrs. b) From Ch. Km, 8/130 to 9/130, (from Hariram Ashray Math to Reliance Jio OFC Chamber) total length 1000 Mtrs. c) From Ch. Km, 11/000 to 13/150, (from Lavale Phata to Ghotawade Phata) & Km, 13/150 to 13/825 for the total length of 2825 Mtrs. d) From Ch. Km, 1/275 to 19/950 (from Lavale Phata to Paud Bus Stand) for the total length of 18675 Mtsr. Total length of 23500 Mtrs., in the State of Maharashtra Applicant: Jio Digital Fibre Pvt Ltd, 9th Floor, Maker Chambers IV, 222, Nariman Point, Mumbai-400021
  • Four laning of Solapur - Yedshi Section of NH-211 from Km. 0.00 to Km. 100.00 (Design length 98.717 km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase IVB - Submission of proposal for permission of laying of 11 KV underground electric cable work through the utility duct at Ch.89/800 near Chorakhali, Tal. Kalamb, Dist. Osmanabad on Solapur Yedshi Section of NH-211 in the State of Maharashtra
  • Permission for laying Optical Fiber cables from Bijwanpar to Devi Sarai Chowk MS- 118+000 to MS-122+000 along 4 Km of NH-31 section in the state of Bihar
  • Permission for laying sewer pipe along and across NH-113 for work of “Construction of Sewerage system includes sewerage Network, sewage treatment plant, sewage pumping station and house sewer connection along with all allied works and operation services of the entire system 10 years at Pratapgarh Town Contract Package No.RSTDIP PRT 01 in the state of Rajasthan
  • Proposal for NOC permission for crossing of water supply pipeline in Km.01.50 to km.04.85 of NH-235 (Hapur road) in the state of Uttar Pradesh
  • Operation & Maintenance Period for Palanpur Swaroopganj Section of (Km 340.00 to 264.00) on NH-14 in the State of Gujarat and Rajasthan Four-lane Highway Constructed on BOT (Annuity) Basis under NHDP Phase-Ill. - Proposal seeking ROW permission for crossing of Highway by 66KV S/C Palanpur to Chandisar Line CKT-2 with ACSR Panther Conduct or under “KISAN SURYODAYA YOJNA” between Km 598+000 & Km 599+000 of NH-27 in the state of Gujarat
  • Proposal for grant of ROW permission for laying OFC Cable parallel along the NH-27 from Km 616+650 to Km 616+950 and Crossing at Km 616+650 (Total Length=350m) in Palanpur-Abu Road District-Banaskantha in the state of Gujarat
  • Proposal for ROW Permission for laying Optical Fibre Cable parallel along the NH-27 from Km 478+000 to Km 481+000 (Total Length=3000m) on LHS, in Palanpur-Radhanpur-Samakhiali section of NH-27 in the state of Gujarat
  • Six-laning of Samakhiali-Gandhidham (Km 306.000 to Km 362+160) section of NH-8A in the state of Gujarat to be executed as BOT (Toll) on DBFOT under NHDP Phase V. - Proposal for ROW permission to issue NOC for proposed 220KV S$/C (2-Phase) Line on D/C Tower with ACSR Zebra Conductor with OPGW laying and 220KV (2+1) 1CX800 Sqmm AL corrugated XLPE U/G Cable laying from existing 220KV Vondh S/S to Proposed Bhachau TSS for crossing of NH-8A(New NH-41) at Km 319+770 near Village-Vondh, Tal-Bhachau, Dist-Kutch in the state of Gujarat
  • Proposal for ROW Permission for laying Optical Fibre Cable parallel along the NH-27 from Km 624+550 to Km 624+800 and Across at Km 624+550 in Palanpur-Abu Road (Total Length=300m) District-Banaskantha in the state of Gujarat
  • Upgradation to 4-lane with paved shoulder of Bhimasar Junction of NH-41 to Anjar-Bhuj to Airport junction (Km 0+000 to Km 65+478) of NH-341 in the state of Gujarat. - Proposal for ROW Permission for crossing to NH-68 (Gojariya-Mahesana-Chanasama- Patan Road) Near Village-Aloda at Km 85+350 to Km 85+380 of NH-341, Taluka Mehasana of 914mm Dia MS Water Main & 1200mm Dia MS Casing Pipe for Dharoi Aug. RWSS (Phase-2), Talula-Unjha & Visnagar, Dist.-Mehasana in the state of Gujarat
  • NHAI, PIU — Viluppuram — Proposal seeking NOC and Permission for laying of Sewerage Pipeline across the road at Km.164/000 of NH-45 at Ellis Chathiram Junction (Tindivanam to Ulundurpet section) in Viluppuram District in the state of Tamilnadu — by the Executive Engineer, TWAD Board RWS Division, Viluppuram — Approval Requested
  • Proposal for laying of OFC cable by M/s Telangana Fiber Grid Corporation Limited between from km 90/800 to 94/140(RHS), km96/270 to 107/600 to 108/520(LHS), km 108/520 to 109/450(R/S), 114/800 to 123/300(RHS) and km 125/100 to 125/700(RHS} and across the road at km 93/250, 99/760, 104/600, 107/600, 109/320, 110/500, 118/300 & 123/300 on Manneguda- Ravulapalli road section of NH-163 [Total length=26,020m] in the state of Telangana
  • Proposal for laying of OFC by M/s Telesonic Network Ltd from km 39.800 to 40.800(RHS) & Km 47.900 to Km 53.900(LHS) [Total length=9000m] of NH- 365 in the state of Telangana
  • Proposal for laying of OFC cable by M/s Telesonic Network Ltd from Km.64/000 to Km.67/500 (RHS), Km.67/500 to Km.73/800 (LHS) and across the road at Km.64/000, Km.65/100, Km.67/500 & at Km.73/800 along Nizamabad-Jagdalpur Section of NH-63 road for the [Total Length=9,920m] in the state of Telangana
  • Proposal Request for grant of permission for laying proposed OFC Line of M/s Airtel/Telesonic Networks Ltd, Mumbai, along with Ducts (02 Ducts) on Yeola Vaijapur Shivur Bungalow Road NH-752-H Km,29/200 (Dr B.R.Ambedkar Chock) to 56/700 (Shivur Bunglow) for total length of 27.500 Km, in the State of Maharashtra. Applicant: Airtel/Telesonic Networks Ltd, Malad, Mumbai
  • Proposal Request for grant of permission for laying proposed OFC Line of M/s Airtel/Telesonic Networks Ltd, Mumbai, along with Ducts (02 Ducts) on Jafrabad Chaufuti to Rajur Phata on Road NH 752-H Km,202/240 (Jafrabad Chaufuti) to 212/240 (Rajur Phata) for total tength of 10.00 Km, in the State of Maharashtra. Applicant: Airtel/Telesonic Networks Ltd, Malad, Mumbai.
  • Proposal for grant of permission for laying Optical Fiber Cable along Jahirabad to Latur NH 752 K, Section from Km, 0/000 Km, 1/200 for the total length 1.200 Km, in the State of Maharashtra. Applicant: M/s Telesonic Networks Ltd, 6th floor Airtel center, plot No,16, udyog vihar, phase-lV Gurugram, 122015 Haryana
  • Proposal for grant of permission for laying Optical Fiber Cabte along Kharadkhed to Tivatyal along Ashtamode to Tivatyal NH 63, Section from Km, 50/700 to 62/000 for the total tength 11.300 Km, in the State of Maharashtra. Applicant: M/s Telesonic Networks Ltd,6th floor Airtel center, Plot No,16, Udyog Vihar, Phase-lV Gurugram, 122015 Haryana.
  • Projects Comprising of 9 NH Stretches (Bundle-1) on Toll Operate Transfer Mode for Garamore to Samakhiyali section in the State of Gujarat. - Proposal for ROW permission for Pipeline laying parallel to NH-27 (Morbi-Samakhiyali Road) from Km 254+537 to Km 254+817 (RHS) for a Length of (L=280m) along the pipeline route in District Morbi in the state of Gujarat
  • Operation & Maintenance Period for Palanpur Swaroopganj Section of (Km 340.00 to 264.00) on NH-14 in the State of Gujarat and Rajasthan four-lane Highway Constructed on BOT (Annuity) Basis under NHDP Phase-II. - Proposal seeking ROW permission for crossing of Highway by 66KV S/C Palanpur to Chandisar_ Line CKT-2 with ACSR Panther Conduct or under “KISAN SURYODAYA YOJNA” between Km 580+000 & Km 581+000 of NH-27 in the state of Gujarat
  • O&M Period of Palanpur-Radhanpur Section of (Km 340.000 to 458.000) of NH-14 and Radhanpur-Samakhiyali Section of (Km 138.800 to 281.000) of NH-15 on OMT basis. - Proposal for ROW permission for laying proposed 8” Dia Steel & 125mm Dia MDPE Gas Pipeline (in same trench) along Km 595+791 to Km 596+152 (RHS) and from Km 596+138 to Km 596+031 (LHS) and across NH-27 at Km 596+138 (Palanpur- Abu Road) to extend City Gas Distribution Network from RTO Circle to Lokaniketan Vidhyalaya Connectivity in Palanpur Taluka, Banaskantha District area of BK GA
  • Proposal for ROW permission to lay Underground Water Pipeline along service road on NH-27(New) between Km 181+500 and Km 181+800 and Km 182+380 to Km 182+780 of NH-27 in the state of Gujarat
  • Project comprising of 9 National Highway Stretches (Bundle-1) on toll operate Transfer Garamore to Samakhiyali section (From Km 204+000 to Km 306+000) of NH-8A in the state of Gujarat. Reg. Proposal seeking ROW permission for crossing 700mm Dia GWSSB Pipeline, at Km 304+750 of NH-27 in the state of Gujarat
  • Project comprising of 9 NH Stretches (Bundle-1) on Toll Operate Transfer Garamore- Samakhiyali section (Km 354+537 to Km 306+000) of NH-8A in the state of Gujarat. - Proposal of ROW permission for laying 12" Dia Gas Pipeline parallel to NH-27 from Km 271+850 to Km 264+750 (LHS) for a length of 7100Mtr along the pipeline route in Taluka-Maliya, District-Morbi in the state of Gujarat
  • Six-laning of Surat-Dahisar section of NH-8 from Km 263+000 to Km 502+000 (Length Km 239+000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase-V. Reg. Proposal seeking ROW permission for pushing and laying RCC Hume Pipe crossing at (i) Km 500+210 near Sai Palace Hote! and (ii), Km 498+210, Sahyadri_ Hotel, Village-Varsova, for delivering Water from Rajiv Gandhi National Park Mira-Bhayandar Municipal Corporation for fast discharge purpose, so that in heavy rainfall, water logging not occurs in the state of Maharashtra
  • Four/ix Laning of Surat-Dahisar Section of NH-8 from Km 263+000 to Km 502+000 (Length Km 239+000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V. Reg. Proposal for ROW Permission for laying of 11KV Underground Cable Line with 185Sqmm, 3-Core KV Crossing from RHS Bhagwada at Km 356+600 to LHS Tigra at Km_356+600 NH-48, Near Village-Bhaswada to Tighra, Taluka-Pardi, District-Valsad in the state of Gujarat
  • Proposal for grant of permission for NH overhead crossing of 220 KV D/C Transmission line at Km. 156.550 of Khajuwala-Poogal sec. of NH-911 from PSS3 to PSS4 from Tower Loc. AP2 (DD+9) to Loc, AP3 (DD+9) by M/s. Rajasthan Solarpark Development Company Ltd. (RSDCL)
  • Proposal for laying of OFC cable by M/s Telangana Fiber Grid Corporation Limited between from km 493/800 to 506/680 (LHS), and across the road (HDD method) at Km 496/000 and 498/600 at 2 locations across the road [Total length=6980m] on Pune-Hyderabad road section of NH-65 in the state of Telangana
  • Proposal for laying of OFC cable by M/s Telangana Fiber Grid Corporation Limited between from Km 23/132 to 23/882(RHS), Km 23/292 to 25/632(LHS), Km 25/632 to 26/022(RHS), Km 27/0 to 28/6(RHS), Km 24/200 to 36/680(LHS), Km 36/968 to 46/364(LHS), Km 37/910 to 39/739(RHS), Km 43/639 to 43/819(RHS), Km 58/369 to 59/619(RHS), Km 59/619 to 62/920(RHS) and Km 62/069 to 62/920(LHS) and crossing at 19 locations [Total length=36,917m] on ORR to Medak road section of NH-765D in the state of Telangana
  • Proposal for grant of permission for NH overhead crossing of 220 KV D/C Transmission line at Km. 162.580 of Khajuwala-Poogal sec. of NH-911 from PSS1 to PGCIL 765 KV GSS Bhadala-Il from Tower Loc. AP3 (DD+9) to Loc. AP4 (DD+6) by M/s. Rajasthan Solarpark Development Company Ltd. (RSDCL)
  • NHAI-RO Kerala- Four laning of Thiruvananthapuram bypass from Kazhakuttam-Mukkola (Km.0+000 to Km.26+500) section of NH-47(New NH-66) under NHDP Phase-ll! in the State of Kerala- Permission for Laying 11 KV UG cable from Paruthikuzhy RMU to Paruthikuzhy new RMU for replacing the faulty cable by HDD method across NH bypass under Electrical section, Poonthura in Thiruvananthapuram Bypass
  • Permission for laying water pipe line from km.24.40 to km 33.80 on NH-60A and crossing at different Chainage under Bankura Dsitrict pipe water supply project (Phase-ll) assisted by ADB under PIU-Bankura, WBDWSIP, P.H.E. Dte. in the State of West Bengal
  • Proposal for permission for laying Optical Fibre cable (OFC) on NH along the NH- 42 road by M/s Vindhya Telelinks Limited from km 165/960 to km 164/748 (RHS) and from km 164/748 to km 164/734 (LHS) and a crossing at km 164/748 (RHS- LHS) of Madanapalli - Ananthapuramu section of NH 42 for a total length of 1.256 kms in Ananthapuramu District in the State of Andhra Pradesh
  • Laying of underground 12" NB Casing Pipe (8" NB Crude Oil Carrier Pipeline) & 20" NB Dia Casing Pipe (16" NB Natural Gas Carrier Pipeline) through Horizontal Boring Method for the from Kumchal EPC in Changlang District of Arunachal Pradesh-Kusijan FGGS in Tinukia District of Assam: Application for Grant of crossing permission at Km 21.760 of NH-3
  • Proposals for laying 16 inch dia underground multiple product petroleum pipeline along with 40mm HDPE duct for Optical fiber cable (OFC) across NH-565 at km 33.957 of Nakrekal to Nagarjunasagar section in the State of Telangana
  • NHAI, PIU, Krishnagiri- Laying of underground Sewerage pipe line along the road from km.119/320 to km.120/350(RHS), km.120/950 to km.121/194(RHS), km.122/300 to km.122/935(RHS), km.122/900 to km.125/250(RHS), km.120/556 to km.120/646(LHS), km.122/300 to km.122/430(LHS), km.124/725 to km.125/150(LHS) and road crossing at km.120/080, km.122/300 & 125/150 and 179 nos of Machine holes on Krishnagiri — Walahpet section of NH-48 (Old NH-46) by Executive Engineer, Vellore City Municipality Corporation, Vellore
  • NHAI, PIU, Krishnagiri- Laying of underground sewerage pipe line along the road from km.115/500 to km.116/089(RHS), km.116/832.5 to km.116/950(RHS),km.117/520 to km.117/559.3(RHS), km.119/320 to km.120/080 (RHS) & km.116/961 to km.117/630(LHS) and road crossing at km.117/520, km.120/080 and 51 nos of Machine holes on Krishnagiri — Walahpet section of NH-48 (Old NH-46) by Executive Engineer, Vellore City Municipality Corporation, Vellore
  • Operation & Maintenance Period for Palanpur Swaroopganj Section of (Km 340.00 to 264.00) on NH-14 in the State of Gujarat and Rajasthan four-lane Highway Constructed on BOT (Annuity) Basis under NHDP Phase-lll. Reg. Proposal for ROW permission for laying of Pipeline Along & Across of NH-27 for “Construction of works of water supply production and distribution network, improvements with house service connection for nonrevenue water reduction and continuous water supply and providing sewer network with house connections, and construction of sewer treatment plant and all allied works and operation services of the entire system for 10 years at Abu Road” (RSTDIP/ABR/01) in the state of Rajasthan
  • Submission of Proposal towards ROW permission for laying OFC through underground (HDD) method from (i) km 613.700 to km 634.00 (Oodlabari to Chalsa) of length 20.300 km of NH-31 (Il) KM 105.000 to km 107.910 (chalsa square to essar petrol Pump) of length 2.190 km on NH-31C (iii) km 115.545 to km 123.700 (Jaldhaka bridge to Kuchi Diana Bridge) of length 8.125 km on NH-31C (iv) km 124.080 to km 125.500 (Kuchi Diana bridge to Changmari TG) of length 1.420 km on NH-31C & (v) km 127.430 to km 145.632 (Diana bridge to Telipara more) of length 18.202 km on NH-31C in total length of 50.237 km in West Bengal
  • Permission for laying of OFC from Km 107.500 to Km 128.500 (LHS) totaling 21.00 kms of NH 63 Ankhola - Gooty section through open trench method by M/s. Jio Digital Fibre Pvt. Ltd.
  • Four laning of Hisar to Dabwali section of NH-10 from Km, 227.000 to 314.600 with paved shoulder in the State of Haryana on EPC mode (Pkg.-II)- Permission for laying of Raw Water Pipe Line 700mm diameter of M/s Public Health Engineering Department, Division-II, Sirsa from Km. 80.005 to 81.705 (LHS) (total length 1700m) on Hisar-Dabwali Section of NH-10 (New NH-9) in District Sirsa in the State of Haryana
  • 4/6 laning of Delhi/Haryana border to Rohtak section of NH-10 from Km 29.700 to Km 87.000 including construction of Bahadurgarh and Rohtak bypasses in the State of Haryana under NHDP Phase INA on BOT Basis — Proposal for crossing of 4 inch diameter steel natural Gas pipeline across old NH-10 (New NH-9) at Km. 62+030 and Km. 67+175 for CGD Projects of M/s BPCL in Rohtak in the State of Haryana by HDD Method-Provisional Approval
  • NHAI-RO Kerala- Six Laning of Kodunagllur to Edapally section of NH- 66(old NH-17) from Des.Ch.397+750(Ex.Ch.411+850) to Des.Ch.423+780(Ex.Ch.343+330) in the State of Kerala on HAM under Bharatmala Pariyojana -Laying of PLB pipes/OFC cable through HDD by M/s BSNL from Km 413+700 to Km 414+600 (RHS) of NH-17(New NH-66) in the State of Kerala
  • NHAI-RO Kerala- Operation & Maintenance of Edappally – Vyttila – Aroor section from Km 342.000 to Km 358.750 on NH -66 (formerly NH 47) in the State of Kerala on OMT basis (Package OMT 23) in the State of Kerala-Laying of 3CX300 SQMM XLPE 11KV UG Cable through HDD by KSEB from Km 344.275 to Km 345.965(LHS) of NH-47(New NH-66)
  • Rehabilitation and up-gradation to 4- laning from Km.240+250 i.e. Brahmani Bypass end beside BNR Weigh Bridge to Km.287+200 i.e Rajamunda Section of NH-23 (New NH-143) in the state of Odisha under NHDP-IV Pkg-l-B- Proposal for Laying of Clear Water Rising Main and Distribution Network Pipeline Along! Across the NH-143 by RWS&S, Rourkela
  • Four Laning of Jabalpur-Lakhnadon Section of NH-7 from Km 465.500 to Km 546.425 (Package- JL) in the state of Madhya Pradesh under NHDP Phase-IV on EPC mode - Proposal for Permission to Road crossing for Sewerage Pipelineat NH-34, Under Flyover at Ch. 466+260 near Andhmukh Bypass
  • Permission proposal for laying underground Optical Fibre Cable (OFC) along the road from Km 7/826 to 13/150(RHS), Km 12/990 to Km 14/140(LHS) & crossing at Km 13/150 of Coimbatore-Trichirappalli-Chidambaram Road of NH-81 in the state of Tamil Nadu
  • Proposal for grant of permission for laying/road crossing of Electric Cable along NH27 (Old NH-76) from MS 285.920 to 289.350 and one road crossing at MS 286.100 (Total length=3.43 Km.), Village- Bhatewar on Chittorgarh-Udaipur section in the State of Rajasthan by AVVNL
  • Four laning of Arnravati - Chikhali section from km 166.000 to km 360.000 section of NH-6 in the State of Maharashtra to be executed on DBFOT Pattern under NHDP Phase-IV-Proposal for laying of OFC cabie along with HDD upon stretch clamping and other suitable method from Balapur Naka to Ridhora from km 250.700 to km 253.600 (RHS) along with proposed line & 2 crossing from (1) km 250.700 (2) km 253.600 along the NH-6 (New NH-53) in the State of Maharashtra by M/s Airtel Telephonic Network Ltd. Total length 2.900 km
  • NHAI - RO Hyderabad - PIU Hyderabad- Proposal for laying of Optical Fiber Cabte for a total length of 8.63 Km from Km.52+400 to Km,.53+600 (RHS), from Km.56+500 to Km.60+000 (RHS)}, from Km.60+000 to Km.62+370 (RHS), from Km.59+740 ta Km.59+990 (LHS), & from Km.62+370 to Km.63+590 (LHS) along NH-765 and Highway crossings at Km. 52+400, km.59+700, & Km.62+370 by HDD methodology on Hyderabad to Srisailam section of NH-765 in the State of Telangana
  • Proposal Request for grant of permission for laying proposed OFC Line of M/s Jio Fibre Pvt Ltd, Mumbai, along and Across on Kalyan - Ahmednagar - Pathardi - Parbhani - Nanded - Bhokar Road NH-61, Ch. Km, 432/00 to 434/00 (Manwat Bypass) for total length of 2.03 Km, in the State of Maharashtra. Applicant: M/s Jio Digital Fibre Pvt Ltd, 101- Saffron, Nr. Centre Point, Panchwati 5 Rasta, Ambawadi Ahmedabad-380006
  • Four Lanning of Solapur - Mah /Kar Border Section of NH-9 from Km 249+000 to 348+800 in the state of Maharashtra on Design, Build, Finance, Operate and Transfer (DBFOT) Basis under NHDP Phase - Laying of 11 KV Electric underground cable work on NH-65 at Ch. 314+664 near Dalimb, Tal. Omerga, Dist. Osmanabad
  • Proposal for permission for laying of 125mm MDPE Gas Pipeline across NH-27 at Ch.78.680 (Near JK Colony underpass) for approx. 0.080 km. in the State of Uttar Pradesh
  • NHAI - PIU - Puducherry - Four laning of Sattanathapuram (Km.123/800) to Nagapattinam (Km.179/555) Section of NH-45A on HAM under NHDP Phase-IV in the state of Tamil Nadu - Request for permission to lay Ennore - Thiruvallur- Bengaluru-Puducherry-Nagapattinam-Madurai-Tuticorin R-LNG Pipeline alongwith Optical Fiber Cable (OFC) across NH-45A by Horizontal Directional Drilling Method (HDD)
  • NHAI - RO Hyderabad - PIU Hyderabad- Proposal for laying of Optical Fiber Cable for a total length of 14.90 Km from Km.77+700 to Km.86+600 (RHS), & from Km.115+000 to Km.121+000(LHS) along NH-161AA by HDD methodology on Sangareddy- Narsapur- Toopran- Gajwel- Jagdevpur- Bongir- Choutuppal road of NH-161AA in the State of Telangana
  • Four laning of Solapur - Yedshi Section of NH-211 from Km. 0.00 to Km. 100.00 (Design length 98.717 km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase IVB - Submission of proposal for permission of laying of 11 KV underground electric cable work through the utility duct at Ch.89/800 near Chorakhali, Tal. Kalamb, Dist. Osmanabad on Solapur Yedshi Section of NH-211 in the State of Maharashtra