Sorry, you need to enable JavaScript to visit this website.

You are here

  • Proposal for laying of water pipe line in Madurai-Ramanathapuram Section of NH-85 & 87 (old NH-49) along the road from Km 81+064 to Km 83+100 (LHS & RHS), Km 84+200 to Km 84+300 (LHS), Km 84+200 to Km 85+900 (RHS), Km 88+500 to Km 89+100 (RHS), Km 91+800 to Km 93+400 (RHS), Km 94+600 to Km 97+600 (RHS), Km 100+500 to Km 101+100 (RHS), Km 107+700 to Km 109+700 (RHS), Km 116+800 to Km 117+200 (RHS) & Km 118+600 to Km 120+484 (RHS) and crossing @ Km 84+285, Km 96+820 & Km 108+800 for a total length of 16.057 Kms (along the road length=15,956m open trench method & across length=101m HDD method)
  • Proposal for grant of permission for crossing of sewer pipeline at Km. 25.570 of NH-19 (Old NH- 02) in Faridabad District in the State of Haryana
  • Proposal for use of ROW for laying of water pipeline in the area of Sunder Pahari and Godda along & across the four Laning of Mehgama-Hansdiha section of NH-133 from Km. 00+000 (existing Km. 41+900 to Km. 51+825 (existing Km. 93+000) in the State of Jharkhand on Hybrid Annuity Mode
  • Widening/developing of Existing NH-85 from Km0+000 to Km 124+636 to 2L/2L+PS in the State of Kerala–Laying/Crossing of 3 nos. 110mm dia 11KV U.G. cable from 16+560 to Km 19+860 by M/s KSEBL
  • Laying of 33KV 3CX300 SQMM XLPE UG cable through 150mm dia HDPE pipe along NH-66 from Ch. Km 280+277 to Ch. 280+557(RHS) and across at Ch. Km 280+557 in Ramanattukara-Valanchery stretch by M/s KSEBL
  • Rehabilitation and up gradation of Jharpokharia-Baripada-Baleshwar section of NH-5 from Km.0+000 to Km.80+600 in the State of Odisha under NHDP Phase-IV on EPC Mode-Proposal for laying of 11 KV cable (2 run) near Panchabanda at Km.35+560 of NH-18
  • Application for Access permission for laying of 12" dia CS & 125mm MDPE Natural Gas Pipeline along the road for development of city gas distribution network in the Geographical Area (GA-11.33) of Nagpur District from km 14.585 to km 25.200 (length 10615m) through open trench method (RHS) and 8 nos. of crossings through HDD Method on Nagpur-Hyderabad section of NH-44 in the State of Maharashtra
  • Submission of proposal for laying/crossing at Near Forest Office, Deori, village of Sixteen (3) locations of 11 KV Deori Electrical Feeders XLPE Cable of 300 sqmm 3 core across the NH-6 under Deori Division of Gondia Circle
  • Proposal for permission for laying of 33KV Overhead line crossing at Ch. Km 08.500 at village Takwiki, ta. & Dist. Dharashiv & Chi. Km 13.700 at village Wadgaon Lakh, Ta. Tuljapur & District-Dharashiv of Tuljapur-Ausa section of NH-361
  • Four laning of Nagpur-Saoner-Betul section of NH-69 (New NH-47) from kms. 3.000 to kms. 59.300 in the State of Maharashtra and from kms 137.000 to kms 257.400 in the State of Madhya Pradesh on DBFOT(Annuity) Basis-Permission for grant of approval for laying of utilities across NH-353J under Saoner Division
  • Proposal of M/s Jamnagar Municipal Corporation for permission for laying (300 mm & 900 mm dia) and crossing (900 mm dia) of Water Supply Pipeline (Und Dam to Jamnagar Pumping Station) at NH-927D Jamnagar-Kalawad road at km 4/700 to km 10/900 having route length of 6.2 km) in the State of Gujarat
  • Proposal for laying Over Head 11KV ACSR & Weasel Conductor Cable from Km 165+847 to Km 168+805 (2958m) LHS & Km 168+805 to Km 168+817 (12m) RHS & crossing by HDD Method at Km. 165+847, Km 168+805 & Km 168+817 on NH-09 (Old NH-24) (Delhi-Moradabad Section) at District-Moradabad in the State of Uttar Pradesh
  • Improvement, Operation and Maintenance including strengthening; ans widening and existing 2 lane carriageway to 4/6 lane adivided carriageway configuration for Kondhali-Talegaon section (50.000 to 100.000) of NH-53 in the State of Maharashtra on BoT basis-Laying of 11 KV underground HT cable across NH-53 at km 87.320 in Mouza Parola, Ta. Karanja, District-Wardha
  • Proposal for laying Over Head 11KV ACSR & Weasel Conductor Cable from Km 140+360 to Km 142+375 (2015m) RHS & Km 140+360 to Km 140+435 (75m) LHS & Km 142+120 to Km 142+300 (180m) LHS & crossing by HDD Method at Km. 138+720, Km 140+435 & Km 142+120 on NH-09 (Old NH-24) (Delhi-Moradabad Section) at District-Moradabad in the State of Uttar Pradesh
  • Proposal to lay underground electrical cable crossing National Highway at 11 KV XLPE cable 185 sqm National Highway at crossing 20.779 on NH-53 from Gondkhairi Ta. Kamlmeshwar, District-Nagpur in Nagpur-Kondhali section of NH-6
  • Proposal of M/s Sarjan Realities Pvt. Ltd. regarding crossing of 33 KV S/C overhead line from solar plant to PSS of ECO panther conductor on Kalavad to Junagadh road NH-927-D crossing at km 61/00 to km 62/00 near Bharat Petroleum Fuel Station village Toda, Taluka Kalavad, District-Jamnagar in the State of Gujarat
  • Permission for crossing of canal under the Amiliki distributory at Ch. 213+200 on the project highway Rewa to Hanumana section of NH-30
  • Proposal seeking ROW permission for laying of 4" Dia Steel Pipeline along NH-27 from Km 477+920 to Km 482+260 Km and across NH-27 at Km 477+920 from M/s. Radhanpur LCNG Station to M/s. Bharat Petroleum CNG Station Pipeline Project in Patan District in the State of Gujarat
  • Proposal for permission for laying of 33 KV 300 sqmm UG cable across the highway NH-44 (Nagpur-Chandrapur Highway) near Satgaon Fata under Tender T-02 (OH-UG) Scheme under Butibori divisional-Approval
  • NOC for laying of 400MM Día Water Pipeline through HDD Method of Delhi Jal Board from Km. 16.544 to 17.172, RHS (Total Length 628m) on along NH-02 (New NH-19), (Delhi to Faridabad road), in the Badarpur and State of Delhi
  • Permission for laying of 450mm dia HDPE pipe for sewer line across the D.M. road by Trenchless technology from TATA motors cars showroom to super auto electrical (p) Ltd. at Km 32.770 (crossing)
  • Proposal of Application for grant of permission for execution of RAW Water Transport System in Sahibganj District
  • Proposal for laying of Electrical Power Cable between Km.374+800 to Km. 385+090 on NH-16 alongwith two nos. of crossing at Km.374+800 and Km.385+090 at Bharat Petroleum Corporation Limited Retail outlet M/s Annapurna Filling Station and Kurudhamala Bypass Bridge
  • Rehabilitation and Upgradation of Chandikhole-Bhadrak section of NH-5 (New NH-16) from Km.62+000 to Km.136+500 in the State of Odisha under NHDP Phase-V on HAM Mode-ROW permission for laying of underground gas pipelines along/across NH-16 near Bhadrak City between Km.118+800 to Km.122+400 by M/s Adani Total Gas Limited
  • Four laning of Panikoili-Rimuli section of NH-215 from Km.0.000 to Km.163.000 (Design Chainage Km0+000 to Km166+173) in the State of Odisha—Permission/NOC for laying of 11 KV Cable (2 nos. crossing @ 4 runs) near Biragobindapur at Km.50+600 & Km.50+800 on NH-20
  • Proposal of laying 914 mm dia MS & 300 mm dia DI portable drinking water pipeline along NH-47 for providing basic utility service from (i) km 45/275 to km 45/750, (ii) km 46/234 to km 46/644 total length 885 mt near Sayala, Tal. Sayala, District-Surendranagar in the State of Gujarat
  • Proposal for permission for NH-351-G crossing Overhead Transmission line of 66KV S/C Ghughrala-Charkha Overhead Transmission line having route of 50 km to NH-351G between km 126 to km 127 near Charkha village, Tal. Babra, District-Amreli in the State of Gujarat
  • Proposal of laying 914 mm dia MS & 300 mm dia DI portable drinking water pipeline along NH-47 for providing basic utility service from (i) km 47/140 to km 47/180, (ii) km 49/650 to km 49/650 total length 340 mt near Sayala, Tal. Sayala, District-Surendranagar in the State of Gujarat
  • Proposal for laying of 33 KV cable (4 run) at one location for independent line Karanjia GSS to Jashipur PSS under Mayurbhanj District through NH-49 near Angarapada village for providing uninterrupted power supply for Karanjia Grid to Jashipur PSS
  • Permission to lay Optical Fiber Cable on NH-44 at Gwalior Bypass road from kms. 26+000 to kms 34+500 Total section length ROW applied for 8+500 kms.
  • Request for granting permission for laying proposed 8" Dia Carbon steel Gas Pipeline with OFC along the NH-43 from Prajapati Chowk of District/ State Boundary of Chhatisgarh approx length 36.365 Km. in two locations
  • Proposal seeking ROW permission for MS Water Pipeline across NH-341 at Km 28+550 of proposed Carrier Pipe of OD 2476 mm x 13 mm Thick Twin Line & OD 1922mm x 11mm Thick Single Line in MS Casing pipe of OD 2990mm x 20mm Thick Twin Line & OD 2224mm x 12mm Thick Single line from MPS-2 Rata Talav to Darasdi Dam & Jamara Dam crossing NH-341(Anjar-Bhuj) in Kutch District in the State of Gujarat
  • NOC case for permission for crossing of 500mm dia DI Raw water pipeline on Narwana to Jind Highway of NH-71 at km 278.975, in District-Jind in the State of Haryana
  • Proposal for grant of permission for underground water supply pipeline crossing by HDD method at Km. 68+600 on NH-27 (Old NH-25) (Lucknow-Kanpur Section) at District-Unnao in the State of Uttar Pradesh
  • Proposal for grant of permission for underground water supply pipeline crossing by HDD method at Km. 56+350 on NH-27 (Old NH-25) (Lucknow-Kanpur Section) at District-Unnao in the State of Uttar Pradesh
  • Proposal for grant of permission for underground water supply pipeline crossing by HDD method at Km. 36+600 on NH-27 (Old NH-25) (Lucknow-Kanpur Section) at District-Unnao in the State of Uttar Pradesh
  • Permission for laying of 457mm dia MS pipe from Nanjanagudu Km 187.420 to Gundlupete Km 150.720 by Open Excavation method & 10nos. of road Crossing by HDD method
  • Proposal for right of way permission for laying underground road crossing of 11KV line by Trenchless (HDD Method) on NH-46, Ch.426+954 at village Simrai, Goharganj District Raisen in the State of Madhya Pradesh
  • Proposal for Permission for laying water pipeline under Nal Se Jal scheme at Anand by Anand Nagarpalika (across NH-64 at km 85/950 and km 87/005 and along between km 85/954 to km 85/974 and km 87/005 to km 87/235) in the State of Gujarat
  • Proposal to lay 2x3 C 95sq. mm 11KV U/G XLP Electric Cable across road crossing between ch. 297+680 km. location near Hangarga Pati Jalkot, Hangarga Pati to Jalkot village & Ch. 309+500 km. location near Yenegur substation to Yenegur village road under RDSS Feeder Separation Scheme at Tuljapur Division on NH-65
  • Six Laning of Pimpalgaon–Nashik–Gonde section of NH-3 from Km 380.000 to 440. 000 in the State of Maharashtra-MJP, Nashik’s proposal for laying 300 mm dia. Water Supply Pipeline from Km. 385.200 to Km. 386.800 (RHS) along NH-3 & crossing at Km. 386+800 across NH-3
  • Proposal for Grant of Permission proposed 4' Steel (600 Class, AP15Lx42, 6.4mm wall thickness) Gas Pipeline along OFC cable along & across National Highays-48 (Chittorgarh to Hamirgarh) in length 760.03m & in ROW 60m from SV-01 Kunwalia to M/s Ashai India Glass in Gangrar Tehsil District-Chittorgarh in the State of Rajasthan
  • Proposal for laying of 800 mm dia slurry pipeline of Bhushan Power & Steel Ltd. on NH-49 from km 313/233 to km 284/858 (LHS) [except from km 286/300 to 288/700 (2.40 km), km 298/600 to 299/200 (0.60 km) and km 305/800 to 307/500 (1.70 km)] on the section Kuchinda to Kolabira in the State of Odisha
  • Proposal of granting permission for crossing 500 mm dia DI potable drinking water pipeline along NH-47 for providing basic utility service crossing km 50/445 at village Fulgram, Ta. Wadhwan, District-Surendranagar in the State of Gujarat
  • Proposal for permission for laying of underground 132 KV EHV cable for Thaltej-Gota S/C of Torrent power Limited across/along NH-147 in the State of Gujarat
  • Permission for laying of water Pipeline along NH-30 from (i)Km.10.600 to Km.16.000-5.4 Kms on RHS,(ii) From km.38.152 to Km.43.786-5.634 Kms on LHS,(iii) From Km.47.080 to Km.60.720-13.640Kms on RHS of total 24.674 Km & across NH-30 at Km.38.450, Km.40.883, Km.43.158, Km.49.496, Km.51.469, Km.52.015, Km.52.298 of total 7 Nos. of 210m along the G.Konduru bypass, Ramachandrapuram, Krishnaraopalem, A.Konduru & Kakarla Villages, NTR District on Ibrahimpatnam Circle (Km.0.000) to AP/Telangana Border (Km.71.200) section of NH-30 in the State of Andhra Pradesh for a total length of 24884 m
  • Proposal for NOC permission for laying underground Sewer pipe line from Km.302+ 341 to Km.302+746 (405m) LHS & Km.302+341 to Km.302+746 (405m) RHS & Km.303+173 to Km.303+384 (211m) LHS Km. 303+384 to Km. 303+979 (595m) LHS and Km. 303+781 to Km.305+641 (1860m) RHS & Km.304+386 to Km.305+147 (761m) LHS & Km.305+641 to Km.305+820 (179m) RHS & km.304+013 to Km.304+386 (373) LHS & km.305+182 to Km.305+914 (732m) LHS & Km.303+173 to Km.303+686 (513) RHS crossing by HDD method at Km.302+341, Km.303+173, Km.304+386 & Km.305+641 on NH-76E/35 (Prayagraj-Mirzapur Section) at District-Mirzapur in the State of Uttar Pradesh
  • Proposal seeking permission for crossing underground Water Supply Pipeline of Radhanpur Nagarpalika across of NH-27 at Km 479+395 in Radhanpur, Taluka–Radhanpur, District–Patan in the State of Gujarat
  • Proposal seeking ROW permission for laying 125mm Dia PE Natural Gas Pipeline parallel to NH-27 (Morbi-Samakhiyali Road) from Km 243+803 to Km 249+208 (Total Length 5405m) on RHS along the pipeline route in Taluka/District Morbi for supply of Natural Gas to various enroute village/industries situated in Taluka Morbi & surrounding area in District-Morbi in the State of Gujarat
  • Proposal seeking ROW permission for laying Underground & Overhead 66KV S/C Tumbada-Kantela Line 630Sqmm (6+1) UGA Cable parallel from Km 409+820 to Km 412+250 & crossing at Km 405+360 of NH-8E in the section of Dwarka-Porbandar, near Village-Kuchadi, Taluka & District-Porbandar in the State of Gujarat
  • Proposal seeking ROW permission for approval of construction of 66KV Overhead Transmission line Keshod (GETCO) S/S to Maliya Hatina TSS Line with EARTH WIRE across to NH-151 (Jetpur-Somnath highway) b/n Km 81+300 and Km 81+400, Village-Panidhara, Taluka-Maliya Hatina, District-Junagadh in the State of Gujarat
  • Laying of underground OFC on NH-332A Road (Design Chainage) across the road @ Km. 60/400, Km. 60/850, Km. 61/725
  • Permission to lay underground OFC on NH-332A road (Existing Chainage) across at Km. 131/260 & NH-332A road (Design Chainage) across at Km. 62/100, Km. 62/200, 63/700, Km. 63/840, Km. 63/840, Km. 65/410, Km. 65/700, 70/850, Km. 72/650
  • Permission for laying of Water Supply pipeline (315/6kgf mm dia HDPE pipeline) along Kadapa–Kurnool section of NH-18 (New NH-40) from Km.291+400 to Km.296+650 RHS and from Km.296+650 to Km.296+750 LHS (Udumalpuram to Balapanur) and one crossing at Km.296+650 with a total length of 5.410 km by M/s SPY Agro Industries Ltd.
  • Proposal for Laying Overhead Electrical Cable 11 KV HT Line on RSJ pole in utility corridor at Km. 15.100 to Km. 17.400 (Length 2.30Km) along NH-160
  • Proposal of two(2) crossing at (i) Village-Bahalpur, existing Chainage-936.422 KM (at proposed bypass) & (ii) village-Jaligura, proposed chainage-27.686 KM
  • Proposal seeking ROW permission for crossing of proposed Internal Overhead Transaction Line of our wind farm project on 66KV DC Tower structure from Wind Farm to Khakharda PSS on NH-151A Dwarka (Kuranga)-Khambhaliya-Devaliya between km 19+000 and Km 20+000, Village-Nandana, Taluka-Jamkalyanpur, District-Devbhumi Dwarka in the State of Gujarat
  • Proposal seeking ROW Permission for laying proposed 125mm @ PE Gas Pipeline from Sukhpur Chowkdi-Makhiyan to Village-Majevdi along from Km 23+940 to Km 24+340 (RHS) and Km 23+940 to Km 24+340 (LHS) & across at Km 23+940 U/C NH-151 Junagadh Bypass Road (Jetpur-Somnath section) near Village-Sukhpur to develop City Gas Distribution Network in Junagadh District in the State of Gujarat
  • Proposal seeking ROW permission for laying of 12” Dia Steel Gas Pipeline along NH-48 (Ahmedabad Himatnagar Road) from Km 492+900 to Km 495+640 on RHS and from Km 495+640 to Km 496+424 on LHS and Across at Km 496+640 (upto Sabar Dairy Junction) Gas Line from Gadhoda tap off station Himatnagar to Idar Pathik IOCL CNG Station connectivity in Sabarkantha District in the State of Gujarat
  • Proposal seeking ROW permission for laying of Gas pipeline along NH-48 from Km 6+641 to Km 7+341 (Total Length=700m) on LHS on Ahmedabad-Vadodara section of NH-48 in the State of Gujarat
  • Proposal for seeking Permission for laying DI K-9 pipes along NH-710(from Km 30.900 to 32.200 of Meli Manpur Namchi Road & from Km 27.900 to 32.000 Tarku Damthang Namchi Road)
  • Proposal seeking ROW permission for crossing of Water Supply Pipeline of 2742mm Dia on NH-27 at Km 583+057, Near Village–Chandisar, Taluka-Palanpur by M/s. Water Resources Investigation Division, Palanpur Division (Narmada Water Resources, Water Supply & Kalpsar Department) in the State of Gujarat
  • Proposal seeking NOC & Permission for laying of Water Pipe Line along the road from Km.108/750 to Km. 129/940 (RHS) of NH-81(Old NH-227) (Meensurutti to Chidambaram Section) by M/s. TWAD Board, Cuddalore
  • Proposal seeking permission for Erection of 33KV Over Head Electrical Transmission in 3lay Power Cables line & 503 C/C Intervals poles along the ROW from Km.78/112 to Km.81/612 on RHS on Tindivanam to Krishnagiri Section of NH-77 (Old NH-66)
  • Proposal of M/s AUDA, Ahmedabad for laying and crossing DI pipeline on NH-47 (construction of clear water pump house with electro-mechanical work at Telav head work & providing and laying clear water tunkmain from CPWH to various village under Jal-Jivan mission including O&M for five years) in the State of Gujarat
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 29+000 to 28+900 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 46+820 to 46+920 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 36+150 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 38+420 to 38+480 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 48+560 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 42+140 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 18+650 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 8+150 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for permission of underground water supply pipeline crossing by HDD method at Km. 27+030 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh
  • Proposal for the permission of laying underground water supply pipeline crossing by HDD method at Km 56+350 on NH-27 (Old NH-25) (Lucknow-Kanpur Section at District-Unnao in the State of Uttar Pradesh
  • Proposal for the permission of laying underground water supply pipeline crossing by HDD method at Km 68+60 on NH-27 (Old NH-25) (Lucknow-Kanpur Section at District-Unnao in the State of Uttar Pradesh
  • Proposal for the permission of laying underground water supply pipeline crossing by HDD method at Km. 36+600 on NH 27(Old NH-25) (Lucknow-Kanpur Section) at District-Unnao in the State of Uttar Pradesh
  • Strengthening and Widening the existing 2 lane carriageway to 2 lane with paved shoulders from Km 0+000 to Km 85+000 of NH-544H (NH(O) Project (Thoppur-Mettur-Bhavani-Erode section) for a length of 85 Km-Tamil Nadu Water Supply and Drainage Board, Salem-Request for laying of Water Pipe line in NH-544H Road (Thoppur Bhavani Section) along the road from Km.40/350 to Km.49/775 (LHS) for a length of 9.425 Km by Open trench
  • Request for permission to lay underground Optical Fibre Cable [OFC] on NH-544H [Thoppur-Mettur Dam-Bhavani-Erode Road] between Km. 21/053 to Km. 22/560[LHS] and across @ Km. 21/053 of NH-544H in the limits of NHAI, Coimbatore
  • Resubmission of Proposal for getting the Right of Way permission to Laying of Under Ground Water Pipe Line Along The Row Using Dia 152.4mm Di Water Pipe Km 139/235 tο Km 140/935 on LHS from Km 140/935 to Km 141/920 on RHS and across the road at Km. 140/935 using Dia 152.4mm Di Water pipe using in Dia 304.8mm MS casing pipe on NH-544[Salem-Cochin Section]
  • Proposal for Overhead Crossing of 132 KV S/C Shamli (400)–Budhana-2 Transmission line on DC Tower crossing NH-709AD (Shamli-Muzaffarnagar) between Ch. 49+700 & 49+800
  • Permission for crossing/laying of 11KV XLPE cable through (160mm dia, Pipe) HDD method for crossing of NH-34 at Km. 114.720 in Kanpur Road, Mahoba by DVVNL, Mahoba in the State of Uttar Pradesh
  • Proposal for laying of 11 KV underground electrical cable crossing at NH-161 at 5 nos. locations of Under RDSS Scheme
  • Rehabilitation and up-gradation of 4-laning of Angul-Sambalpur Section of NH-42 from Km.112.000 to Km.265.000 in the State of Odisha on EPC mode-Execution of 2 nos. of Individual pipe water supply projects pertaining to 23 GPs at Kishore Nagar Block & 03 GPs at Athamallik Block of Angul District & 21 GPs of Athamallik Block of Angul District-Permission of CWRM pipe laying along & across NH-55 at Kishorenagar block
  • Submission of Proposal as per the circular of the Ministry of Road Transport and Highway Authority of India of crossing Ch. 150.250 of National Highway by 33 KV line 3 core 300sqmm cable near 132KV Pandharkwada sub Station beside Toll Naka, Tq.-Kelapur, District-Yawatmal
  • Permission for laying utility services (Water Supply pipeline) on National Highways 162E (Ch.87+400 to Ch.90+300 RHS) and 2 crossings at Ch.87+400 and Ch.89+950 between Nandsamand Dam to Nathdwara Canal Link road
  • Issue of NOC for road crossing of 2528mm Dia MS pipe with concrete Encasing at Km.381+990 by open excavation method in BRT Tiger reserve Boundary to Bangalore Section of NH-209 in the State of Karnataka under HAM
  • Proposal for permission for laying of water supply pipeline along (Ch. 518+740 to 519+068)(RHS),(Ch. 519+700 to 520+524)(RHS), (Ch. 518+740 to 520+524),(LHS+RHS), (Ch.534+880 to 536+130)(LHS+RHS),(Ch. 541+440 to 541+600)(RHS) and Crossing at Ch. 518+940, 535+380 and 541+600 on NH-19(Old NH-02) Kanpur-Fatehpur Section in Tehsil-Bindki & District-Fatehpur in the State of Uttar Pradesh
  • Proposal for permission for laying of water supply pipeline along (Ch. 596+780 to 597+060)(RHS),(Ch.596+650 to 597+060)(LHS) and Crossing at (Ch. 597+060) on NH-19 (Old NH-02) Kanpur-Fatehpur Section in Tehsil-Khaga, District–Fatehpur in the State of Uttar Pradesh
  • Proposal for permission for laying of water supply pipeline along (Ch. 592+940 to 593+000((RHS),(Ch.593+000 to 593+732)(LHS) and Crossing at Ch. 593+000, on NH-19 (Old NH-02) Fatehpur-Prayagraj Section in Tehsil-Khaga, District–Fatehpur in the State of Uttar Pradesh
  • Proposal for permission for laying of water supply pipeline along (Ch. 511+820 to Ch.513+470)(LHS+RHS), (Ch.516+678 to Ch. 517+778)(RHS), (Ch.516+647 to Ch.517+778)(LHS) (Ch.517+820 to 518+121)(LHS) and Crossing at (Ch. 511+979), (Ch. 516+730) and (Ch.517+820) on NH-19 Old (NH-02) Kanpur-Fatehpur Section in Tehsil-Bindki & District-Fatehpur in the State of Uttar Pradesh
  • Proposal for permission to install 30m vertical mast ch.23+040 (RHS), Ch. 18+580 (RHS), Ch. 18+210 (RHS), Ch. 20+050 (LHS), Ch. 20+950 (LHS), Ch. 22+491 (LHS), Ch. 25+0 50 (Median) on National Highway No. 8 (New NH-48) of Delhi-Jaipur Road