Sorry, you need to enable JavaScript to visit this website.

You are here

  • Access Permission for laying of Underground water Pipeline of dia 1318 mm with protection pipe of dia 2030 mm of M/s. Narmada Water Resource,Water Supply & Kalpsar Dept across NH-351 at Km 131/300 in Village-Pithadiya,Taluka-Bagasara,District- Amreli in the State of Gujarat
  • Six laning of Samakhiyali-Gandhidham section of NH-8A from Km 306+000 to Km 362+160 in the state of Gujarat to be executed as BOT (Toll) on Design,Build,Finance,Operate and transfer (DBFOT) under NHDP Phase-V
  • Crossing of 2 water supply pipeline of 200 mm and 400 mm diameter at Km 10.800 (RHS to LHS) across NH -709 A in Bhiwani Mundal Jind section in Village Tigrana Tehsil and District- Bhiwani in the State of Haryana by HDD method
  • Regarding permission for OFC Laying Cable work by BSNL through HDD method from Km.0.00 to Km 0.310 crossing on old NH 64 (New NH -07) in section of Zirakpur-Patiala section Highway at Zirakpur in District - SAS Mohali in the State of Punjab by HDD method
  • Proposal for laying 400mm dia MS pipe across NH-51 at Chitoktak - Rongkhon at Chainage at Km 92+500 in Chitoktak village b--v Sub Divisional Officer, PHE Sub Division,Tura in the State of Meghalaya
  • Permission for laying of Water Pipeline along NH-565 in Rapur - Yerpedu section from Km 452+960 to Km 462+780, Km 463+800 to Km 469+300, Km 469+540 to Km 472+120, Km 472+270 to Km 473+510, Km 474+010 to Km 480+550 & Km 483+250 to Km 497+200 and crossings at Km 452+930 to Km452+960, Km 458+320 to 458+350, Km 464+600 to 464+630, Km 491+000 & Km 497+170 to Km.497+200
  • Approval of proposal for overhead crossing of 220KV D/C Transmission line from Mejia Thermal Power Station (MTPS) to Gola Substation on NH-18 at Ch 40+600
  • Crossing permission/NOC for laying 8” dia LPG Pipeline along with OFC for upcoming Kandla – Gorakhpur Pipeline Project across NH-19 (old NH-2) at Ch.459.920 near Village -Bhaunti, Tehsil-Kanpur Sadar, District-Kanpur Nagar in the State of Uttar Pradesh
  • Permission for laying under from existing Km.172.890 to 174.560 (RHS) (near Panth Chauraha to Iqbalpur Railway Crossing) on Aligarh – Kanpur Section of NH-91 in the State of Uttar Pradesh
  • Proposal for grant of permission for laying Optical Fiber Cable (OFC) along NH-161 Akola-Washim-Hingoli-Nanded Road from Naka Washim 80+600 to 81+500 Near Washim Bus Stand,Venketesh hotel Washim,Single side Total length 900 Mtr. In the State of Maharashtra
  • Laying of OFC through Aerial mode at valley side from Duni (Chahaaj) to Panar Ghat Bridge along NH-309A for total length of ROW is 22.000 in Champawat & Pithoragarh Districts in the State of Uttarakhand
  • Erection of 2 Nos of Towers on LHS & RHS & Over Head crossing of 11KV Line across Highway at Km108/450 on Thanjavur–Trichy section of NH-83 (Old 67) in Sanoorapatti village of BudalurTaluk in Thanjavur District by TANGEDCO,Pudukottai
  • Permission for laying of Storm Water Pipe Line along NH-8 (New NH-48) crossing at Km.17.300,NH-8 (Delhi-Jaipur Road) in the state of Delhi
  • Rehabilitation and Upgradation to Four laning of Baharagora to Singara Section (Km.199.200 to Km.310.806).of NH-6 (Length 111.606 Km.) in the State of Odisha under NHDP Phase-IV,on EPC Mode- Application for seeking permission for laying of 250mm dia HDPE Pipe for irrigation water supply across NH-49 at Km.222.840,Village-Kendumundi in Saraskana Tehsil under Mayurbhanj District
  • Permission for lay Optical Fiber Cable from Kms 0.00 to Kms 07.50 (Haram Chauk to Kendriy Vidyalay Chauk), Km.08.550 to Km.09.100 (Bypass Turning to Teknar Chauk Dantewada) on NH-163A, Geedam to Dantewada Section Road,total section length ROW applied for 08.05 Kms. in the State of Chhattisgarh
  • Permission for crossing proposed sewerage pipeline of 165mm Diameter HDPE Sewerage pipeline at km.2.80 (RHS to LHS) in Jagadhari-Paonta Sahib section of NH-73A Highway in District-Yamunanagar in the State of Haryana
  • Four laning of Sinnar to Shirdi Section of NH 160 from Design Ch:0/000 to Ch:50/943 including Sinnar Bypass of 3.375 km in the State of Maharashtra on Hybrid Annuity Mode–Maharashtra Information Technology Corporation Ltd.(DIT Mantralaya) proposal for laying Telecom OFC in stretches from Km. 25.000 to Km. 44.800 (LHS & RHS) (Length 19.800 Km.) on NH-160
  • Issuing of NOC for Over Head crossing of Delhi-Meerut Expressway at chainage 53.637 (DME) PKG-IV) near Village Churiyala,Tehsil-Modinagar, District- Ghaziabad by the under construction 400 KV D/C Muradnagar- Simbhavali Transmission Line
  • Permission for laying 12- inch diameter carbon steel & 125 mm MDPE gas pipeline along with 50mm OFC duct in same trench from Km. 34+000 (in front of Bankey Bihari Dental Colloge) to Km. 49+800 (Hapur bypass ) along NH-24 ( New NH-09) in left side and crossing of NH at 3 locations in the state of Uttar Pradesh.
  • Permission for the install/crossing of underground water supply pipeline of M/s Narmada Water Resources,Water Supply & kalpsar Department across NH-168A at Km 51.77,for the Total Project Length as 30.00 m,in the State of Gujarat
  • Permission for the install/crossing of underground water supply pipeline of M/s Narmada Water Resources,Water Supply & kalpsar Department across NH-68 at Km 327.16,for the Total Project Length as 60.96 m,in the State of Gujarat
  • Permission for laying proposed 125 mm dia PE gas pipeline along/across NH-56 (Zakhavav-Mandavi-Vyara) for super line to Mandavi at Taluka Mandavi,District-Surat in the State of Gujarat
  • Seeking permission for crossing of NH-114A and laying pipeline both sides along NH-114A for Madhupur Urban Water Supply Scheme from Km 191.277 to m 195.700
  • Permission for the install/crossing of underground water supply pipeline of M/s Narmada Water Resources,Water Supply & Kalpsar Department across NH-168 at Km 7.3000, for the Total Project Length as 48.00 m,in the State of Gujarat
  • Permission for laying OFC along/across of Pardi-Chival-Jogvel-Kaprada-MH Border NH-848 in Taluka Kaprada District-Valsad in the State of Gujarat
  • Permission for laying OFC cable along NH-64 (Total length 2.310 Km) from Km 68/490 to Km 70/800 RHS (from Santaram Society J.S. Ayurved Mahavidyalay in Nadiad) in the State of Gujarat
  • Grant of necessary permission/NOC for laying OFC of M/s Telesonic Networks Ltd. from Km.1.935 LHS to km.5.045 LHS(length 3110m),Km.6.446 LHS to km.9.790 LHS (length 3344m) & Km. 1.935 RHS to Km.6.446 RHS(length 4511m) & Eight crossing at Km.2.500(length 59m),Km. 3.180(length 60m),km.3.835( length 60m), Km.3.845(length 60m),Km.4.530(length 60m), Km.4.990(length 60m),Km.5.045 (length 60),Km.6.446 (length 58m),(Total length 11442m) on NH-248A (Gurgaon to Sohna Road),in the State of Haryana
  • Permission to lay underground Optical Fiber Cable (OFC) along the road from km.91+500 to km.92+900 (RHS) and one number of Road crossing at km.92+880 on Hosur– Krishnagiri section of NH-44(Old NH-7)
  • Proposal for laying of NRL's proposed 26 dia (660 mm) Crude Oil Pipeline encased with 32" dia (813mm) Casing pipe along with 6" dia (153 mm) OFC duct cable across NH-2 at Km 555.570
  • Proposal of Kolkata Metropolitan Development Authority permission for laying of 700 mm dia (ID) M S Pipe (12 mm thick) water carrying pipeline with 1000mm dia(ID) 16mm thick M S casing pipe across NH-19 (NH-2) at Km 648.526
  • Proposal for laying of 11 KV underground line across NH-2 at Km 579.157 of West Bengal State Electricity Distribution Co Ltd.
  • Permission for crossing proposed water pipeline of 400 mm Diameter at km 226.880 (RHS to LHS) on Jhajjar Loharu section of NH –334 B Highway in the State of Haryana by HDD method
  • Proposal of permission for laying of underground OFC along Dhanora - Gadchiroli -Mul-Chandrapur Road NH-930 from Ch. in Km,191/00 to 233/00 Total length 42.00 km, in the state of Maharashtra
  • Proposal of Permission for laying underground OFC along Bramhapuri - Wadsa - Kurkheda - Korchi - Amgaon Road section of NH-543 ( Section Bramhapuri - Wadsa) from Chainage in Km, 438/00 to 449/00 total section Length 11.00 Km,in the state of Maharashtra
  • Proposal of permission for laying of underground OFC along Dhanora - Gadchiroli - Mul Chandrapur Road section of NH-930 (Section Mul- Janala) from Ch. in Km, 230/850 to 239/250.Total length 8.40 Km in the State of Maharashtra
  • Proposal of permission for laying of underground OFC along Dhanora -Gadchiroli - Mul-Chandrapur Road section of NH-930 (Section Ajayppur - Chandrapur) from Ch. in Km, 251/820 to 271/420 Total length 19.60 Km in the State of Maharashtra
  • Proposal of permission for laying underground OFC along Armori -Gadchiroli-Ashti-Sironcha Road section of NH-353C (Section Armori - Gadchiroli) from Ch.in Km,85/00 to 113/650 total section Length 28.650 Km, in the State of Maharashtra
  • Permission for laying proposed water pipeline of 200 mm from km 120.850 to km 124.858 (LHS) and km 124.858 to km 124.950 (RHS) (total length 4.100 km) and crossing at km 124.858 along old NH-10 (New NH-09) in Rohtak to Hisar section of Highway in Village Mundhal Khurdh,District Bhiwani,State Haryana
  • Permission for laying of OFC cable from Km 75.400 to Km 79.00(LHS) of NH-150 for a total length of 3.60 and 01 Crossing at Km 79.00 through HDD method by M/s. Jio Digital Fibre Pvt Ltd
  • Proposal for laying Natural Gas Pipeline along with OFC between (i) Km Stone 3 & 4 at Km. 3.717 of NH-15, Village: Bar Plaha, Mouza: Bar Bangshar, Circle: Kamalpur, Dist: Kamrup (Rural), Assam (ii) Km stone 120 & 121 at Km 120.531 of NH-15,Village:Geruwa Gaon,Mouza: Bihaguri, Circle: Tezpur, Dist: Sonitpur, Assam (iii) Km stone 66 & 67 at Km 66.018 of NH-15, Village:Ganda Pukhuri Jungle,Mouza:Pub-Dalgaon,Circle:Dalgaon, District: Darrang, Assam
  • Permission to lay underground Optical Fiber Cable(OFC) along the road from Km. 41+920 to Km. 42+070 (LHS),Km.41+930 to km.42+070 (RHS) and Road crossing at km.42+070 on Hosur-Krishnagiri section of NH-44 (Old NH-7)
  • Proposal for Permission for laying OFC along NH-67 by M/s. Reliance Jio Infocomm Ltd from Km.694/670 to Km.738/530 (RHS) of NH-67 of Hubli-Krishnapatnam road for a total length of 43,860 mtrs in SPSR Nellore District in the state of Andhra Pradesh
  • Six laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length 102.300 Km.) and Improvement of Ahemedabad-Vadodara Expressway from Km. 000. to Km. 93.302 in the state of Gujarat (Length 93.302 Km.) under NHDP Phase-V on DBFOT Toll Basis
  • Permission for laying proposed 18"steel natural gas pipeline along 6" carbon steel OFC Conduit from Guwahati to Panisagar across NH Ch: 184+700 Km. of NH-37(New NH-27) (Lumsum Pathar to Sonapur) en-route National Highways under Guwahati-Panisagar Natural Gas Pipeline
  • Permission for laying 04 inch dia carbon steel gas pipeline near IFC circle,Ghazipur at Ch. 8.040 km (across NH Road) & at Ch. 8.160 Km on NH-09 for the connectivity of new CNG pumps IFC 4 & IFC 5
  • Proposal for NOC for access permission to the proposed fuel station on Old NH-69 (New NH-46) in Km 29 (Ch. 28.558,LHS,Khasra No.73/21 at Village-Bansapur,Tehsil-Budhni,District-Sehore in the state of Madhya Pradesh
  • Proposal for NOC for access permission for NFS involves laying and maintenance of 57015 Kms of OFC across the country for the strategic communication network of Ministry of Defense & Co-laying of BSNL OFC in NFS trench on Jhansi-Nowgon route
  • Construction of 400KV QMDC Line from YTPP, Damaracherla to 400KV SS Jangaon- Crossing of 400KV line between chainage,Km.106/600 to Km.106/800 of the National Highway, Hyderabad to Vijayawada section of NH-65 in the State of Telangana- Stringing of line across NH-65
  • Proposal seeking Permission for laying proposed 18" Guwahati to Panisagar underground Natural Gas Pipeline along with 6" CS conduit for OFC cable through HDD method across (i) NH-37 at 217.825Km (ii) NH-08 at 245.850Km (iii) NH-08 at 264.460Km (iv) NH-08 at 268.540 (v) NH-08 at 282.600Km under Karimganj NH Division,Karimganj by Indradhanush Gas Grid Limited
  • Operation and Maintenance of Madurai – Kanyakumari section from Km. 0/000 to Km. 243/170 of NH-7 in the State of Tamil Nadu – Proposal submitted to Permission for Erection of 11 KV Over Head Electrical line along the road from Km.89/750 to Km.92/015 (RHS) in Madurai–Kanyakumari section of NH-44 - Proposal submitted
  • Widening of existing 4 lane portion from Km.86 to Km.96,covering Panipat City on NH-1 in Haryana to 6 lanes elevated structure covering Gohana Road,Sanauli Road,Assandh Road Crossings , City Bus Stand and Skylark Tourist Complex and widening and construction of Peripheral Lanes on BOT basis-NOC regarding upgradation of existing Nigam Electric Lines alongside GT Road , Panipat from Ch.86+510 to Ch.87+360 of NH-1
  • Proposal for grant of permission for laying Optical Fiber Cable (OFC) along NH-361 on Nagpur - Wardha Road from the following sections Km 78/700 to Km 480/200 Left Hand Side of the Road (LHS) along the Road for a total length 1.500 Km in the state of Maharashtra
  • Proposal for grant of permission for laying Optical Fiber Cable (OFC) along NH-361 on Nagpur- Wardha Road from the following sections Km. 477/600 to Km. 479/200 Right Hand Side of the Road (RHS) along the Road for a total length 1.600 Km in the state of Maharashtra
  • NHAI,Madurai Region –Highway Administration –Tuticorin -Tirunelveli section from Km.0/000 to Km.47/250 of NH-138 (Old 7A) in the State of Tamil Nadu – Erection of 400 KV DC Overhead Electrical line crossing at Km.25+800 in Near Vagaikulam village by TANTRANSCO
  • Proposal for ROW Permission for laying proposed (1)12.75” Black Oil Pipeline (2) 8.625” R-LNG Pipeline (3) 6.625” Propylene Pipeline (4) 4.5” Normal Butanol Pipeline & (5) 2.375” ISO Butanol Pipeline (Bundled with OFC) across NE-1 between Km 87+184 and Km 87+190 near Village Ajod,Taluka & District Vadodara on Ahmedabad-Vadodara Section of NE-1
  • Permission for the laying of underground Gas Pipeline of M/s Indraprastha Gas limited of old ch. 38.000 to old ch. 39.380 (Prop. Ch.43.380) and from old ch. 39.380 (Prop. Ch.43.380) to old ch. 43.000 (Prop. Ch.47.000) and from Old Ch. 66.900 (Prop. Ch.71.985) to Old Ch. 69.400 (Prop. Ch.74.485) along Left Hand Side of the National Highway.The total section length for ROW applied for is 7.5km. on along Shamli- Muzaffarnagar Road National Highway New NH-709AD (Old SH-12) in the state of Uttar Pradesh
  • Permission for laying under ground drainage line on NH-756 from Km 42/875 to Km 48/575 (Between Bodeli-Halol section) by HDD/Push through method in the State of Gujarat
  • Permission for the laying of Optical Fibre Cable (OFC) M/s. Reliance Jio Infratel Private Limited through 2 ducts of 40 mm along and across NH-51 between Km 237.590 to Km 255.890 for the total project length as 18.30 Km, in the state of Gujarat
  • Proposal for Permission to laying of 11 Kv 2X3C core 185 sqm,underground XLP Electrical cable on Nagpur-Raipur road NH 53 (6) across in Km,486/240 in section Bhandara,Mouza -Paladi,Tehsil-Bhandara,District-Bhandara in the State of Maharashtra
  • Proposal - Permission for laying of Underground Water supply pipeline distribution network line of shivnla left Irrigation scheme across Km, 90/050 on Nagpur-Umred-Bhiwapur-Nagbhid-Bramhapuri-Armori road NH 353 D near Vill,Mohadi (Mokasha) Tq, Nagbhid. District Chandrapur in the State of Maharashtra
  • Proposal for grant of permission for laying Optical Fiber Cable along New NH 160 from Daund to Nimgaonkhalu from Km, 72/400 to Km, 69/200 total section length for ROW applied 3/200 Km, in the state of Maharashtra
  • Proposal for granting of NOC for proposed construction of access to the private property of Shri. Saidiah Thondapu, Chennai from Km 6/707 to Km 6/800 on RHS in Survey No. 41/1 2B & 3C of Thiruneermalai village (Town Panchayat Limit), Alandur Taluk, Kancheepuram District of Chennai Bypass – 2nd Extension of Time – Proposal for Issue of 4th Extension of Time for In-principle Approval / Provisional NOC
  • Proposal for permission for laying of 8" Carbon Steel Gas Pipeline (LHS) from NH Ch. 85.680 (Maheshpur Chauraha) to Ch. 120.680 (Bheempur Chowk) along NH-509 crossing of NH at 3 locations in the State of Uttar Pradesh
  • Issuing of NOC for Over Head crossing of Delhi-Meerut Expressway at Chainage 2.2 Km (DME Pkg-V) near village Talheta,Tehsil Modinagar,District-Ghaziabad by the under construction 400 KV D/C Muradnagar-Simbhavali Transmission Line
  • Permission for laying of 4" Steel Gas Pipeline along NH-334B ( Sonipat- Meerut Road) Ch. 0.000 to ch. 5.300 and across at Ch. 1.635 develop CGD Network in Meerut District in the State of Uttar Pradesh
  • Proposal for Permission for laying of MS crossing Pipeline across NH-44 on Hyderabad-Nagpur Section at Km.337+000 Mentrajpally and Km.350+640 at Indalwai in Nazamabad District in the State of Telangana-Laying of MS pipeline under Gadkole Segment as part of Kaleshwaram Project in the State of Telangana (through HDD)
  • Row Permission for laying Optical Fiber Cable at location Gadra-Jaisindhar Section of NH-25E from Ch 82.477 to 113.000 in the State of Rajasthan
  • Permission for the laying/install of Optical Fibre Cable (OFC) M/s. Gujarat Fiber Grid Network Ltd of 12.5 dia through duct of 40 mm along NH-51 between Km 11/000 to Km 24/000 (Total project length is 13 Km) and 2 Nos. of crossing at Km 23/800 & Km 23/820, in the State of Gujarat
  • Permission for the install/crossing of Overhead 765KV D/C Transmission line of M/s. Lakadia Vadodara Transmission Project Limited across NH-47 at Km 123+170 for the Total Project Length as 60.00m, in the State of Gujarat
  • Operation and Maintenance of Madurai Kanyakumari section from Km. 0/000 to Km. 243/170 of NH-7 in the State of Tamil Nadu -Proposal submitted to Erection of 765 KV Overhead Electrical line crossing at Km.60/830 in Maruluthu village-Proposal submitted
  • Operation and Maintenance of Madurai Kanyakumari section from Km .0/000 to Km.243/170 of NH-7 in the State of Tamil Nadu - Permission for laying of Sewage Pipeline along the road from Km.16/680 to Km.18/340 (LHS) and across at Km.16/680 of Madurai - Kanyakumari section of NH-44 (Old No. NH-7) - Proposal submitted
  • Proposal for NOC permission for granting of Right of way permission to laying underground Optical Fiber Cable (OFC) along the route. (Total length 28.450 KM.) in the state of Uttar Pradesh
  • Proposal for laying of Sewer line along the road NH-27 along the road Ch. 1074.820 to 1074.030 and crossing NH-27 (Kota Bypass at Ch. 1074.030) by RCC-NP-4 1800 mm through Trenchless technology, under 'RUSDP/Program/Kota/02' by RUIDP Ph-Ill, Kota in the State of Rajasthan
  • Permission for laying 33 KV XLPE Elec. Line at Km 277-278 on NH 08 at Village Bhankrota in the Tehsil Sanganer of the District-Jaipur in the State of Rajasthan by JVVNL,Jaipur DISCOM,Jaipur
  • Operation and Maintenance of Madurai – Aruppukottai section from Km.138.800 to Km.266.865 of NH-45B in the State of Tamil Nadu – Erection of 400 KV Overhead Electrical line crossing at Km.243+790 in Near Kurukkusalai village by TANTRANSCO
  • Proposal seeking Permission for lying of OFC cable along NH-275 from Madikeri chain gate at Km 101.00 to Kushalnagar Koppa Cross Km 132.900 on LHS for a total length of 31.900 Kms through HDD method by M/s.Telesonic Networks Ltd.
  • Proposal for grant of Permission for laying Optical Fiber Cable along NH-4 Lim Phata (Ch. 32/600) to Manusaki Hotel (Ch.35/300) for a total length of 2.7 Km, in the State of Maharashtra
  • Proposal for grant of permission for laying Optical Fiber Cable along NH-4 (Mumbai - Pune Old Highway) at Kon Phata from 1. Ch.Km, 108/000 to Ch. Km, 107/600 in LHS. 2. Ch. Km, 108/000 to Ch Km, 107/750 for the total length of 780 Mt. in the State of Maharashtra
  • Six laning of Vadodara- Bharuch Section from Km 108.700 to Km 192.000 of NH-8 in the state of Gujarat on BOT basis (BOT Package-I). Proposal for ROW Permission for laying 12.75" OD x 0.25" WT MS Pipeline along with OFC across NH-48 (Old NH-8) at Ch.137.720 Km for Dahej,Dumad section of Kandla Gorakhpur LPG Pipeline project in the State of Gujarat
  • Six-laning of Ahmedabad to Vadodara section of NH-8 from Km 6+400 to Km 108+700 (Length 102+300 Kms) and Improvement of Ahmedabad-Vadodara Expressway from Km 0+000 to Km 93+302 in the State of Gujarat (Length 93+302 Kms) under NHDP Phase-Von DBFOT Toll Basis.Proposal for ROW Permission for laying of 66 KV XLPE cable along NH-48 from Km 8+600 to Km 6+400 at District Ahmedabad on Ahmedabad-Vadodara Section of NH-48 in the State of Guiarat
  • Six Laning of Ahmedabad to Yadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length 102.300 Km.) and Improvement of Ahmedabad-Yadodara Expressway from Km 0+000 to Km 93+302 in the state of Gujarat (Length 93+302 Kms) under NHDP Phase-V on DBFOT Toll Basis.Proposal for ROW permission for Overhead Crossing of 220 KV Line across NE-1 between Km 23+000 and Km 24+000, Nr. Yillage-Mankwa, Taluka-Nadiad,District Kheda on Ahmedabad-Vadodara section of NE-1
  • Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length 102.300 Km.) and Improvement of Ahmedabad-Vadodara Expressway from Km 0+000 to Km 93+302 in the state of Gujarat (Length 93+302 Kms) under NHDP Phase-V on DBFOT Toll Basis.Proposal for ROW permission for Overhead Crossing of 66 KV Line across NH-48 between Km 61+000 and Km 62+000 (at Km 61+758, Near Village-Uttarsanda, District Kheda on Ahmedabad-Vadodara section of NH-48
  • Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH-163 in Warangal-Bhupalpatnam Section from Ch.170.360 to Ch. 258.200 for 55.68 km in the State of Telangana
  • Operation and Maintenance of 4 lane divided carriageway facility of Tada – Nellore (Km. 52.8 to Km. 163.6) section of NH-5 constructed on BOT basis in Andhra Pradesh - Permission for laying of telecom ducts / Optical Fibre Cable (OFC) from Km. 54/383 to Km. 81/500
  • Operation and Maintenance of 4 lane divided carriageway facility of Tada – Nellore (Km. 52.8 to Km. 163.6) section of NH-5 constructed on BOT basis in Andhra Pradesh - Permission for laying of underground Optical Fibre Cable (OFC) from Km. 54/383 to Km. 107/200 (LHS) also a crossing at Km. 81/050 (LHS-RHS) for a total length of 52.844 Kms
  • Proposal for grant of permission for NH underground crossing of 33KV DC Solar line at Ch. 96+750 (NH-68) Tower No. 108, 109 by M/s. Palimarwar Solar House Pvt. Ltd.
  • Proposal for grant of permission for 33KV transmission line Overhead Crossing on Jaisalmer-Barmer section of NH-68 between MS Km 64 and 65 at Nr. GPS Point E720422, N2929747 by M/s. WINSOL Engineers Pvt. Ltd.
  • Proposal of M/s. Atria Convergence Technologies Limited for Laying of Optical Fiber Cable (OFC) using HDD & open trench methods along NH-16 f rom Km.699.900 to Km.700.500 on RHS (600m) and from Km.700.800 to Km.701.700 on LHS (900m) and across at Km.700.800 (60m) & Km.700.500 (60m) for a total length of 1620m in Visakhapatnam District in the State of Andhra Pradesh
  • Permission for Laying of Optical Fiber Cable (OFC) using HDD & open trench methods along NH-16 from Km.699.900 to Km.700.500 on RHS (600m) and from Km.700.800 to Km.701.700 on LHS (900m) and across at Km.700.800(60m) & Km.700.500(60m) for a total length of 1620 in Visakhapatnam District in the State of Andhra Pradesh
  • Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH-65 from Ch. 35.800 to Ch. 40.000 for 4.260 Km in the State of Telangana
  • Permission for laying of 18" dia Petroleum Product Pipeline along with OFC encased by 24" pipe across NH at km.53+ 158 in Hosur - Krishnagiri section of NH-44 (Old NH-7) by Horizontal Directional Drilling i.e. HDD method
  • Six laning from Km 102.035 to Km 144.680 on the Chengapalli to start of Coimbatore bypass and 4-laning from Km 170.880 to Km 183.010 on end of Coimbatore bypass to TN /Kerala Border section of NH-47 (New No.544) - Proposal seeking permission by TWAD for laying underground water pipeline along the road between Km 105/622 and 115/475 (LHS & RHS) 10572m & 6 Nos. crossing (348m)
  • Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH-61 from Ch. 707.055 to Ch. 748.025 for 29.65km in the State of Telangana
  • Permission proposal for laying underground optical fibre cable (OFC) on Kollam -Thurumangalam Road NH-208 from Km 166/200-167/850 (LHS),Km 168/350-168/920 (LHS),Km 166/470-Km 169/000 (RHS) and across at Km 166/815 in the State Tamil Nadu
  • Permission for the laying /install of Underground Natural Gas Pipeline of M/s. IRM Energy Pvt. Ltd. of 4" dia steel & 125 mm dia MDPE along NH-251 between Km 0/000 to Km 11/086 (Total project length is 11/086 Km) and 1 No of crossing through 8" dia & 250 mm MS casing Pipe at Km 5/288 in the State of Gujarat
  • Proposal for grant of permission for laying HPCL’s 18” dia finished Petroleum Pipeline along with OFC across proposed Green Filed Expressway NH-754K (AJ/ DRGB-Pkg-5) at Km. 118.990 in District-Jalore in the State of Rajasthan
  • Permission for the laying/install of Optical Fibre Cabel (OFC) of M/s. Gujarat Fiber Grid Network Ltd. of 12.5 mm dia through duct of 40 mm along NH-51 between Km 74.000 to Km 103.1,Km 128 to Km 138, Km 141.7 to Km 144, Km 149.5 to Km 150 (Total project length is 41.9 Km) and 10 Nos of crossing at Km 74, Km 78, Km 80.5,Km 84.1,Km 89.2,Km 94.5,Km 102.5,Km 103.1,Km 138 & Km 149.5 in the State of Gujarat
  • Permission to lay Underground Optical Fibre Cable (OFC) on NH-4 (Sriperumpudur to Karaipettai Section) along the road from Km 42/247 to Km 43/290 (LHS), Km 43/290 to Km 43/860 (RHS) for a total length of 1613m and crossing @ Km 43/290 in the limits of National Highways by M/s. Telesonic Networks Limited,Chennai – Approval Requested
  • Proposal for grant of permission for laying HPCL’s 18” dia finished Petroleum Pipeline along with OFC across proposed Green Filed Expressway NH-754K (AJ/ DRGB-Pkg-5) at Km.118.990 in District-Jalore in the State of Rajasthan
  • Permission for laying sewer pipeline of 800 mm diameter (casing pipe of 1100 mm) from Km 86.125 (RHS to LHS) across old NH-1(new NH-44) by HDD method in Panipat Jalandhar section of NH in District- Panipat in the State of Haryana
  • Proposal for permission for laying of 8" dia Natural Gas Carbon Steel Pipeline along NH-119 Etawah-Chajeri (Left Side) from Ch.361+320 to Ch.380+340 (Near Ajeetmal Bypass to near Auraiya Navin Mandi Bypass) = 19.02km in the State of Uttar Pradesh
  • Permission for laying proposed Gas Pipeline of 8 inch Diameter Steel Natural Gas Pipeline laying from Km 456.091 to km 456.321 (BHS) along old NH-01 in Amritsar Attari section Highway from Verka Chowk,District Amritsar in the State of Punjab
  • Permission for the install/crossing of 1000 mm dia GRP underground irrigation water supply pipeline of M/s Sardar Sarovar Narmada Nigam Limited (M/s SSNNL) across NH-41 at km 141+547 for the Total Project Length as 30.00 m, in the State of Gujarat
  • Permission for the install/crossing of 900 mm dia GRP underground irrigation water supply pipeline of M/s. Sardar Sarovar Narmada Nigam Limited (M/s SSNNL) across NH-41 at km 158+858 for the Total Project Length as 30.00 m. in the State of Gujarat
  • Permission for the install/crossing of 900 mm dia GRP underground irrigation water supply pipeline of M/s Sardar Sarovar Narmada Nigam Limited (M/s SSNNL) across NH-41 at Km 163+87 for the Total Project Length as 30.00 m, in the State of Gujarat
  • Permission for the install/crossing of 450 mm dia GRP underground irrigation water supply pipeline of M/s Sardar Sarovar Narmada Nigam Limited (M/s SSNNL) across NH-41 at Km 157+438 for the Total Project Length as 30.00 m, in the State of Gujarat
  • Four laning of Pune Solapur section of NH-65 (Old NH-09) from Km. 150.050 to Km. 251.325 in tha State of Maharashtra under NHDP Phase III Pkg. II on DBFOT basis- Permission to carry out Horizontal Direct Drilling (HDD) for laying of 11 KV electrical cable at Km. 205+377 and Km. 205+378 under Project Pokharapur Lift Irrigation Scheme on Pune Solapur section of NH-65 in the State of Maharashtra
  • Permission for the install/crossing of 280 mm dia UPVC underground irrigation water supply pipeline of M/s Sardar Sarovar Narmada Nigam Limited (M/s SSNNL) across NH-4l at Km 161+385 for the Total Project Length as 30.00 m, in the State of Gujarat
  • Widening of existing 2 lane carriage way to 4/6 lane carriageway configuration for Dhule–Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra–M/s. Telesonic Network Ltd.’s (Airtel) Proposal for laying OFC using HDD Method from Km.310.500 to Km.303.900(Total Length 6.6 Km) on NH-3
  • Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape–Gonde (Km 539.5–Km 440) section of NH-3 in the State of Maharashtra – M/s. Telesonic Network Ltd.’s (Airtel) Proposal for laying OFC using HDD Method from Km.451.850 to Km.453.050 (Total Length 1.2 Km) on NH-3
  • Proposal seeking permission for construction of Kajibilagi West Canal crossing at Km 31.90, Km 30.35, Km 28.45 & Km 27.10 of NH-548B Vijayapur- Athani section by Karnataka Neeravari Nigam Ltd
  • Proposal for grant of permission for crossing MS Water Supply Pipeline across the Ring Road, Jaipur (New NH-148C) in the stretch at Km. 33/233 of under the work of Water Supply Project for Bisalpur Prithviraj Nagar Water Supply Project, Jaipur City (PRN) by PHED
  • Permission for laying sewer pipeline of 800 mm diameter (casing pipe of 1100 mm) from Km 86.125 (RHS to LHS) across old NH-1(new NH-44) by HDD method in Panipat Jalandhar section of NH in District-Panipat in the State of Haryana
  • Permission for construction of Yettinahole Gravity Canal across NH-150A at design chainage 479.270 in J.C Pura village Chikkanayakanahalli taluk by VJNL Yettinahole Project Division Tumakuru