Sorry, you need to enable JavaScript to visit this website.

You are here

  • NHAI, RO Chennai – PIU, Kancheepuram – Tambaram to Tindivanam Section of NH-45 – Request for permission for laying of 230 KV DC line with ACSR Zebra Conductor from Cuddalore to Veerapuram (near SP Koil) 230KV SS – Overhead line crossing between Km 49/600 and Km 49/800 at S.P.Koil by M/s. TANTRANSCO
  • Laying of 33 Kv OH line crossing for Kundall Balichandrapur PSS in DDUGJY (DEEN Dayal Upadhaya Gram Jyoti Yojana) & ODSSP from Chandikhole 1.9 Km. to 15.9 K. and across at 5.9 Km. towards Balichandrapurl paradeep in Jajpur District on NH- 5A
  • Proposal of Kandla Gorakhpur LPG Pipeline (Dumad-Bhopal section) - Request for granting permission for laying LPG pipeline along with OFC by Standard HDD method using bundle for carrier pipe and OFC across NH-148N (Delhi-Vadodara Expressway section) at Km. 351+138.80 in village Derol, Taluka Kalol, District Panchmahal in the state of Gujarat
  • Appointment of Safety Consultants for project (Rehabilitation and up gradation by Four laning of Singara to Binjabahal section from Km. 311.000 to Km. 414.000 (Design Chaingage from Km. 310.806 to Km. 414.982 of NH-6(New NH-49) in the State of Odisha
  • Application for seeking permission for laying GAlL's 18" dia Steel Natural Gas Pipeline along with 40 MM Duct for OFC across to NH-18 (Balasore- Jharpokharia) near Village - Raghunathpur, Tehsil - Baisinga in Dist. Mayurbhanj of Odisha
  • NHAI-PIU-NSK - 4/6-Laning of Pimpalgaon - Nashik - Gonde (Km 380 - Km 440) Section of NH-3 in the State of Maharashtra - Maharashtra Natural Gas Ltd. proposal for Laying Gas Pipeline along NH-3 from Km. 411.360 to Km. 411.399 on LHS & from Km. 411.360 to Km. 411.391 on RHS and Crossing at Km. 411.360 on NH-3
  • NHAI-PIU-NSK - 4/6-Laning of Pimpalgaon - Nashik - Gonde (Km 380 - Km 440) Section of NH-3 in the State of Maharashtra - Maharashtra Natural Gas Ltd. proposal for Laying Gas Pipeline along NH-3 from Km. 422.230 to Km. 422.300 on LHS & Km. 422.230 to Km. 422.320 on RHS and Crossing at Km. 422.230 on NH-3
  • Regarding permission for Laying of Gas pipeline of 6 inch Diameter Carbon steel pipeline of M/s Indraprastha Gas Limited from km 0.030 to km 8.925 (RHS) (total length 8.895 km ) along NH- 152 (Old NH -65) in Kaithal to Rajasthan /Haryana Border section of Highway in in the State of Haryana by open trench method as well as HDD method wherever not feasible as per open trench method or as per direction of PD Hisar
  • Proposal of Kandha Gorakhpur LPG Pipeline (Dumad Bhopal Section) - Request for granting Permission Laying LPG Pipeline along with OFC Standard HDD method using Bundle for carrier pipe OFC across NH-148N at KM 351+138.80 in the village of Darola Taluka kalol District Punchamahal in the state of Gujrat
  • IPC-D-686 dt. 06.05.2021_GFGNL_OFC Across NE-1 at Km. 3+800_PD-A'bad eoffice-77732 and IPC-D-687 dt. 06.05.2021_CGSML_6” MS steel Gas pipeline across Km. 79.941_PD-A'bad eoffice-76408
  • Permission of laying for Optical Fiber Cable Work along Shiwa chowk to Ambedker chowk km. 77..00 to km. 79.00 section NH-30 in the state of Chhattisgarh
  • Four laying of Gujarat/Maharastha Border - Surat- Hazira Port Section of NH-6(approx length 131.50px) in the state of gujrat section under NHDP Phase 3
  • Regarding permission for Laying of Gas pipeline of 8 inch inner Diameter steel natural gas pipeline or 125 mm MDPE Gas pipeline from km 292.677 to km 302.400 (RHS), km.292.166 to km. 295.680 (LHS), km 326.900 to km 327.730 (LHS), km 329.400 to km 352 (RHS), km 352 to km 357.300 (LHS), km 357.300 to km 361.710 (RHS) and km 361.710 to km 362.660 (LHS) (total length 47.347 km ) along old NH- 01 (New NH - 44) by open trench method or where not feasible as per site condition then by HDD method or as per direction of PD PIU Ambala (In around 4 km due to restricted ROW , gas pipeline will be laid below footpath by HDD method and repair will be done by M/s Think Gas as per direction of PD, PIU-Ambala) and Crossing at km 267.640 , 289.900, 295.680 , 336.065, 352, 357.300 and 361.710 by HDD methodacross old NH- 01 (New NH - 44) and in Panipat Jalandhar section of Highway from Doraha to Sahnewal, Ladowal, Phillaur to Lovely Institute in Ludhiana, Jalandhar and Kapurthala
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposed erection of 2 No’s ‘S+6’ intermediate towers and dismantling of 1 no. H-Type tower and 2 no’s DP structures on 132 KV Shadnagar- Balanagar SC line between Loc no. 387 to loc no. 391 crossing at Km.62+100 on Hyderabad to Bangalore section of NH-44 for crossing clearance and improving ground clearance -Stringing of line across NH-44- - Reg
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of OFC along NH-65 on Hyderabad- Vijayawada Section from Km.78/300 to Km.59/800 (LHS) through Open trench method and junction road crossing using HDD method at Km.78/700 (LHS) in the State of Telangana
  • Request for ROW Permission for laying 560 mm dia iron ore slurry pipeline, 560 mm dia return water pipeline and 65mm dia OFC from Chandikhole (ch 62+000) to Panikoili (Ch 90+750). LHS,
  • NHAI - PIU Dindigul - Erection of 765 KV DC Overhead Tower across road @ Km10/760 in the section of NH-45(E) in Dindingul-Theni section in the State of TN- Invitation of Public Comments - Reg
  • Permission of laying for natural gas pipeline NH 147 at km 0. 00 to 0/164 (LHS) from km 20/155 to km 18/550 km in RHS
  • Permission for laying strom water line across NH 147 at km 28-940 near Gota
  • Permission for laying proposed 8” dia MS, 125mm MDPE Gas pipeline & its allied service underground and along & across NH-79 [Km. 162.50 to 170.53 (LHS) & 163.77 to 167.12 (RHS) and 4 nos. crossings
  • Permission for Overhead crossing by proposed 765 KV D/C Transmission line by M/s. Bikaner Khetri Transmission Ltd. (RVPN) near Village-Ramgadh at Km. 90-91 on Raj. Border-Fatehpur-Salasar section of NH-65
  • Permission for laying OFC from NH-123, MS-3.150 to 10.00 for total section length of 6.850 Km. (LHS) (Dholpur Bypass) WWOR applied in the State of Rajasthan by M/s. Telesonic Network Ltd (Airtel)
  • Mumbai for Laying 110mm dia 33KV EHV Cable from Km 449+050 to Km 501+650
  • Permission for laying Optical Fiber Cable (OFC) along NH-52 (old NH-211) from km. 174+000 to km. 177+600 for the total length 3.7 km. In the state of Maharashtra. - reg
  • Permission for laying Underground Telecom Cable in Kaushal Bhawan, Sector-2 Panchkula at km. 45.387 LHS to RHS (crossing) on NH-22 (New NH-05) in the State of Haryana.
  • Four Laning Pannikoili-Rimulli Section of NH-215 from km 0.00 km to 163.000 km(Design Chainage Km 0+000 to 163+178 )in the state of Odisha
  • Permission of laying NH 64 900 mm dia drainage pipe along across NH-64 in Navasari district in the state of Gujrat
  • Development and Upgradation to 4-Laning of NH-52 from end of Biswanath Charali Bypass (km 208) to Gohpur (Km 265) in Assam under SARDP-NE Phase A project on EPC basis– Permission for laying of 24’ Dia underground Natural Gas Pipeline alongwith OFC across the section at Km 219.040, Km 247.500 and Km 253.910.
  • Permission for laying of OFC by M/S Telangana Fiber Grid Coporation limited along with NH353C in the Srirochna Atmakur Section from Ch.156/400 for 6.210km in the State of Telangana
  • Permission for laying of OFC by M/S Telengana Fiber Grid Coporation limited along with NH353C in the Sironcha Atmakur Section from 29/800 to Ch. 76/890 for 32.29km in the State of Telangana
  • Permission for laying of OFC by M/S Telangana Fiber Grid Corporation limited along with NH353C in the Sironcha Atmakur Section from 89/188 to Ch. 109/000 for 8.394km in the State of Telangana
  • Laying of OFC cable and installation of Manhole (MH) along NH-544 from Km.262+300 to Km.264+500 (RHS), Km.270+000 to Km.270+050 (RHS), Km.270+050 to Km.272+450 (LHS), Km.274+050 to Km.274+850 (LHS) and crossings of NH-544 at Km.260+750, Km.260+800, Km.270.050, Km.274+050, Km.274+350, Km.274+400 and Km.274+850 by M/s Jio Digital Fibre Limited-Reg.
  • Grant of permission for laying of 18” dia Natural Gas Pipeline by M/s. GAIL (India) Limited along with 6” dia OFC by standard HDD method using bundle for carrier pipe and OFC across NH-16 at Km.585.700 for a length of 60mt
  • Grant of permission for laying of 18” dia Natural Gas Pipeline by M/s. GAIL (India) Limited along with 6” dia OFC by standard HDD method using bundle for carrier pipe and OFC across NH-16 at Km.585.700 for a length of 60mt
  • Proposal for laying of OFC Underground cable from Nandura Kh. to Bahapura from km. 316.000 to km. 340.000 (LHS) along the NH-6 in the State of Maharashtra by M/ s Jio Digital Fiber Pvt. Ltd. Total length 24.00 km
  • NHAI,RO Chennai–PIU, Viluppuram– Balance Work of Two laning with paved shoulder of Tindivanam – Krishnagiri section of NH66 from Km.37.600 to Km.219/782 under NHDP Phase III in the state of Tamil Nadu – Issue of No Objection Certificate for access permission for the proposed New Private Property – Marriage hall building abutting on LHS of Tindivanam to Krishnagiri Section of NH-66 from Km 61/115 to Km 61/145 in R.S.No.28/2A1 – B of Nangilikondan Village,Gingee Taluk,Viluppuram District–Proposal submitted for issuance of 2nd Extension of Time
  • Four Lanning of Solapur – Mah /Kar Border Section of NH-9 from Km 249+000 to 348+800 in the state of Maharashtra on Design, Build, Finance, Operate and Transfer (DBFOT) Basis under NHDP Phase III- Proposal for crossing of 220 KV Narangwadi - Solapur line on NH - 65 Hyderabad Solapur, near Dastapur village,Tal- Lohara, Dist.Osmanabad
  • NOC Proposal for ROW access permission for laying of 600mm dia Slurry Pipeline & 65 mm dia OFC duct in the RHS of Utility corridor of NH-49 from Km. 449.000 to Km. 424.600 & crossing at km. 424.600 from RHS to LHS in Binjabahal-Tileibani Section from proposed 34 MTPA Iron Ore Beneficiation Plant located at Village-Bhanjapalli & Teherei to Dhenkanal Steel Plant of M/s Rungta Mines Limited
  • Four laning of Panikoili-Rimuli section of NH-215 from Km.O.OOOto Km.163.000 (Design Chainage KmO+OOOto Km166+173) in the State of Odisha. NOC proposal for ROW access permission for laying of 1 no. Gas pipeline of Steel of dia 272mm for CNG & City gas transportation along with 40mm dia OFC to JJKR CGD Network from Ch.Km.O+OOOat Panikoif to Ch.Km.6+ 749 (LHS), Ch.Km.13+082 to Ch.Km. 74+740 (LHS) & Ch.Km.79+070 to Ch.Km.113+400 (LHS) at Jarnunalia with total as 102.737Km within the Utility Corridor along the road & 1 no. of Crossing from LHS toRHS at Km.113+400 across the road of NH·215 in Jajpur & Keonjhar District of Odish a State as sought by the Authorised Signatory, M/s. Bharat Gas Resources Limited, Sahid Nagar, Bhubaneswar, Odisha
  • Permission for the laying of Underground Gas Pipeline of M/s(8" Dia Steel Pipe & 125 mm Dia MDPE Pipe) of M/s Indian Oil- Adani Gas Private Limited from Design Ch.10.900 to Design Ch.14.500 along left hand side of the National Highway and across the National Highway at Design Ch.11.000 (ROW-60m),Design Ch.14.500(ROW-45m).The total section length for ROW applied is 3.825 km on along Panipat-Shamli Road, National Highway,New NH-709AD(Old SH-12) in village Jhamba,Tehsil-Bapoli and district-Panipat in the State of Haryana
  • NHAI-RO Kerala-Existing 2 lane stretch of Palakkad-Kozhikode (Km.15+656 to Km.140+960) of NH-966-Laying/crossing of underground Natural Gas pipeline in between Km.38+300 and Km.49+745 (LHS) for a length of 11.445 Km and crossing of Underground Natural Gas pipeline at Km.43+170, Km.49+030, Km.49+460 and Km.49+745 for a length of 154.12m by M/s IOAGPL
  • Test