Sorry, you need to enable JavaScript to visit this website.

You are here

  • Laying of Water supply pipeline under PIU, Tuticorin - Permission for laying Water supply pipeline by Tamilnadu Dr.J.jayalalitha Fisheries University, Tuticorin along highway from Km 5/300 to Km 6/130 Tuticorin – Tirunelveli section of NH138 (old NH7A) in the State of Tamil Nadu
  • Four laning of Solapur to Yedshi Section of NH-211 from Km. 0/000 to 100/000 (Design Length - 98.717 Km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT Pattern under NHDP Phase - IVB - Submission of proposal for permission for laying optical fiber cable along NH-52 from Km.58/500 to Km.60/300 RHS & Km.60/300 to Km.62/300 LHS for a total length of 03.800 Kms. and road crossing at Km.60/300 in the State of Maharashtra.
  • Proposal for ROW permission for laying of Pro-66KV D/C Songadh-Uchhchhal Line LILO at 220 KV Virpur $/s on D/C Panther Tower with ACSR Panther Conductor Overhead crossing to NH-53 between Km 103+000 & Km 104+000 between Vyara & Songadh near Village-Chorwad, Dist-Tapi in the state of Gujarat
  • NHAI, RO Chennai - PIU - Salem - Proposal for Laying of Water Pipe Line Along the road from Km 59/300 to Km 84/600 (LHS) of NH-544 (Komarapalayam - Chengapalli Section) for the total length of 25.3 Km by the M/s State Industries Promotion Corporation of Tamilnadu Ltd, Erode.
  • Regarding permission for laying sewer pipeline of 800mm diameter from km 194+750 to km 198+750 along old NH-1 by HDD method in a section of Panipat Jalandhar in district Ambala in the State of Haryana
  • Proposal for granting of permission for laying OFC cable along NH-66 (formerly NH-17) from Surathkal to Kuloor i.e. from Km. 358.551 to Km.369.000 on LHS for a total length of 10.499 Kms. in the state of Karnataka
  • Permission for laying Natural Gas Pipeline 10" OD x 0.251" WT MS Pipeline along with 40mm OFC duct across NH at Ch",62+000 (Chandikhole Chhak), Ch. 90+750 (Panikoili bus stop) & Ch. 93+ 150 (near Prashant filling station, Panikoili) on NH-16 and along from Ch. 62+000 to CH. 93+150 on NH-16 (From Chandikhole Chhak to Prashant filling station, Panikoili)
  • Prposal for overhead crossing of National Highway no. 509( aligarh-Moradabad section) by LILO of 220KV S/C sambhal-Gajraula, Amroha line @400 KV S/S Sambhal between km. 172 & 173
  • Proposal for grant of permission for laying of Underground 11 KV Cable across Nagpur-Bhandara section at km 531 +190 on NH-6
  • Proposal for the laying of Jio optical fibre cable from Km. 299/000 to km. 305/000 & km. 287/500 to km. 293/500 in the section of NH-166
  • Permission for laying underground Optical Fibre Cabte from Ch. 231 to Ch. 258 & Ch. 348.5 to Ch. 372, section of NH-53 in the state of Chhattisgarh
  • Permission for [aying underground Opticat Fibre atong Tarpongi vittage Bypass to vittage Saddu i.e. from Km.31.150 to Km.32.500 and vittage Sankara to Aurethi vittage turning i.e. from Km. 37.500 to Km. 42.500 in Titda Btock, District-Raipur of NH-30
  • Permission Proposal for laying underground Optical fiber cable along from Km 274/000 to 287/500(LHS),Km 290/456 to 292/200(RHS)and across at Km 279/750,Km290/456 for a length of 15309m on Dindigul Bangalore road of NH-948 in the State of Tamil Nadu
  • Proposal for approval of overhead crossing of NH-58 (New) by Ajmer (PG)-Phagi 765 D/C Transmission Line from Mile stone 418/2 and 418/4 (Delhi-Mumbai) near village Arjunpura Khalsa & Mangliawas in the State of Rajasthan
  • Proposal for approval of overhead crossing of NH-79A (New) by Ajmer (PG)-Phagi 765 D/C Transmission Line from Mile stone 32/4 and 33/0 (Kishangarh-Nasirabad) near village Dantanada & Dilwara in the State of Rajasthan
  • Permission for laying 33 KV XLPE Cable (630 mm2 size) at underpass NH-8, Khasra at Km. 74.583 in the state of Haryana
  • Proposal for grant of ROW permission for laying 125 dia PE pipeline to connect Chandrapur village in Taluka Wanakner, Wanakner city and surrounding area Gas Distribution Network from Km 208+180 to Km 205+970 on LHS for 2210 Mtr along the Pipeline Route in the state of Gujarat
  • Permission for crossing of 18 inch sewerage pipeline across old NH-95(New NH-5) at km 75.040 by HDD Method village Jandiyala, Ludhiana-2 in district Ludhiana in state of Punjab
  • PIU–Salem – Laying of Irrigation Water Pipe Line along the road from Km 36/735 to Km 36/770 (RHS), Km 36/815 to Km 36/845 (RHS), Km 38/970 to Km 38/995 (RHS) & Km 38/970 to Km 38/995 (LHS) and across @ Km 36/735, Km 36/845 & Km 38/970 of NH 544 (Salem to Kumarapalayam section) for the total length of 115m by Sri Mangamalaiayar Lift Irrigation Farmers Association, Sangari Taluk, Salem District
  • PIU–Salem – Proposal for Laying of Water Pipe Line Along the road from Km 216/293 to Km 216/703 (RHS) & across @ Km 216/293 of NH-7 (Thumbipadi to Namakkal section) for the total length of 0.410 Km by the Executive Engineer, TWAD Board, RWS Division, Namakkal
  • Permission for laying proposed Gas pipeline of 6/12 inch Dia steel natural gas pipeline from km 427.01 to km 429.526 by open trench method along and 1 crossing at km 427.01 by HDD method across old NH 01 in Jalandhar Pathankot section Highway from Village Mari Buchain, Tehsil Batala, district- Gurdaspur in the State of Punjab
  • Permission for laying proposed Gas pipeline of 8 inch Dia steel natural gas pipeline crossing at km 39.465 across NH 503 A in Amritsar Una section Highway from Village Mehta Tehsil Baba Bakala, District Amritsar in the State of Punjab by HDD method
  • Permission for Laying of Gas pipeline of 6/12 inch Dia steel natural gas pipeline from km 55.845 to km 61.740 LHS, km 61.740 to km 64.231 RHS, km 64.231 to km 68.251 LHS, km 68.251 to km 72.081 RHS, km 72.081 to km 74.538 LHS, km 74.538 to km 76.787 RHS, km 76.787 to km 79.519 LHS by open trench method along and 8 Crossing at km 58.845, km 61.740, km 64.231, km 68.251, km 72.081, km 74.538, km 76.787, km 79.519 and km 60.400 by HDD method across NH 503 A in Amritsar Una section Highway from Village Mari Buchain, Tehsil Batala, district-Gurdaspur in the State of Punjab
  • Permission for laying proposed Gas pipeline of 6 inch Dia steel natural gas pipeline crossing at km 11.00 across NH 503 A in Amritsar Una section Highway near Shri Guru Ramdas Medical Institute and Hospital District Amritsar in the State of Punjab by HDD method
  • Permission for laying of proposed underground OFC cable of M/s Telesonic Network Limited of length 1150m along NH -05, from km 52.400 to km 53.550 (RHS) i.e. from Amravati Enclave Gate to Chunna Bhatti Road (Total Length -1150 m ) by HDD method in full length in Zirakpur-Parwano section of NH-05 in Tehsil Pinjore district-Panchkula in the State of Haryana
  • NHAI-PIU-NSK - Four laning of Sinnar to Shirdi Section of NH 160 from Design Km. 0/000 to Km. 50/943 including Sinnar Bypass of 3.375 km in the State of Maharashtra on Hybrid Annuity Mode – GAIL (India) Ltd.’s proposal for crossing Gas Pipeline & OFC across project stretch at Km. 44.000 on Sinnar-Shirdi Stretch
  • Permission for laying Natural Gas Pipeline 12” OD x 0.281" WT MS pipeline along with 40 mm OFC duct along NH-55 from Simlipara Chack (Near Raaz Hotel) Angul to Gobindpur, Dhenkanal from km.103.294 to km.93.294 and from Mandabereni, Angul to Gobindpur, Dhenkanal from km.93.294 to km.34.000
  • Permission for laying Natural Gas Pipeline 8” OD x 0.281" WT MS pipeline along with NH-53 from Kamakhyanagar (Near Kwality Lodge 7 Hotel} to Bhuban (Near Bhuban Bus stand) from chainage 332,837 to Km.367,332
  • Proposal for grant of permission for laying of Steel & MDPE (125 mm) Gas Pipeline along / across NH-166 with 40mm HDPE OFC conduit from Gandhi Chowk Miraj Km 193.216 to Basweshwar Chowk Miraj Km 194.000
  • NHAI-PIU-Kolhapur- Four Laning of Satara - Kolhapur to Maharashtra State Border Section of NH-4 from Km 592.240 to Km 725.000 in the State of Maharashtra - Submission of proposal for grant of permissien for laying of MJP water supply pipe lines along & across NH-48 (old NH-4)
  • Obtaining permission to lay underground 12” dia KMKRPL Natural Gas (Steel) pipelines rough HDD works at NHAI Ch.1.047 Km., NH-734 (Rampur Doraha-Zero point), near Suyansh Public School, Moradabad, U.P
  • Gas Distribution network for Sirohi & Jalore GA in Rajasthan State (Pindwara Spuerline-Alternate Route): Proposal for Laying 8" dia steel natural Gas pipeline parallel to NH-27 across to National Highway -27
  • NHAI-RO Kerala-Six laning of Start of Kollam bypass to Kadambattukonam Section of NH-47 (New NH-66) (from Design Ch.486+000 to Design Ch. 517+250) (Total length 31.25 km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna-Request for laying of OFC cable from Km 494+320 to Km 494+920 and from Km 496+300 to Km 499+500 by Reliance Jio Infocom Ltd
  • NHAI-RO Kerala-Four Laning of Walayar-Vadakkenchery (Km 182.250 to Km 240.000) of NH-544 on BOT(Toll) basis- Operation & Maintenance stage - Laying/crossing of underground Natural Gas pipeline in between Km.188.050 and 191.900 and of NH-544 for a length of 3.895Km by M/s IOAGPL
  • Request for granting the permission to lay 900 mm diameter casing water pipeline (MS pipe) for the project of Delhi Jal Board, Govt. of NCT of Delhi for crossing at Km. 22.175 on NH08 (new NH-48) in village Rajokri, Tehsil – Vasant Vihar & district New Delhi
  • Execution of 3 No's of Individual Rural Piped Water Supply Project in Hemgiri, Kutra & Rajgangpur Block of Sundargarh Dist. Including Five Years Operation & Maintenance" on EPC basis - Permission to lay pipe line Across NH-49 at the Chainage Km.208.355
  • Permission for laying underground Optical Fiber Cable from Km.60.778 to Km.97.600 (From Village Kenda to Ratanpur at Mahamaya Mandir Turning) section of NH-45 Ext., in Block- Kota, District-Bilaspur, State- Chhattisgarh
  • Rehabilitation and up-gradation of existing 2 lane with paved shoulder of Jhajjar-Loharu Section from Km 130.770 to Km 228.630 of NH-334B in the State of Haryana on EPC basis under NH(O)-Part-I as 2-lane with paved shoulder-NOC for laying of HDPE Rising main from 5 MLD STP Charkhi Dadri to Drain No. 8 of diameter 500 mm o along New Nh-334 B from Km 3.300 to Km 9.300 (RHS) in District Charkhi Dadri in the State of Haryana by open cut method
  • PIU–Coimbatore – Implementation of ‘Bharatmala Pariyojana’ Phase – I – Assigning 3 Project Stretches / NHs to Tamil Nadu State NH- wing – “Mettur – Bhawani – Erode – NH-544 – Updation of Detailed Project Report (DPR) prepared by Tamil Nadu Road Sector Project (TNRSP) for NHAI – Salem (NH) Circle – Gobichettipalayam (NH) Division – Proposal seeking permission for laying of underground agricultural 400mm dia pipeline from Km 61/640 to Km 63/080 (RHS) and across the road at Km 63/080 at NH544H of Thoppur – Mettur Dam – Bhavani – Erode Road at S.F.No.: 67/2D at Padavalkalvai Village, Bhavani Taluk, Erode District from this site to S.F.No.: 236/2B at Mathur Village, Anthiyur Taluk, Erode District, Tamil Nadu
  • NOC case for laying of Optical Fiber Cable (OFC) of M/s Telesonic Networks Ltd. from Km. 12.380 LHS to Km. 13.800 LHS (Length 1420m), Km. 14.380 LHS to Km. 21.320 LHS (length 6940m), & Km. 11.885 RHS to Km. 43.990 RHS (length 2105m), Km. 15.260 RHS to Km. 21.320 RHS (Length 6060m), & one crossing at Km. 21.320 (length 58m), (total length 16583m) on NH-248A (Gurgaon to Sohna road) in the state of Haryana
  • NHAI, Madurai Region – Highway Administration – laying of cables under PIU, Thanjavur - Permission for laying underground Optical Fiber Cable by M/s. Jio Digital Fibre Pvt Ltd, Chennai along highway (i) From 89/800 to Km.91/800 on Thanjavur – Trichy section of NH83 (Old NH 67) in the State of Tamil Nadu
  • Permission for laying of 6" dia, Spurline of JHBDPL (Jagdishpur - Haldia - Bokaro - Dhamra) Gas pipeline and 40 mm dia. HDPE for OFC (Optical Fiber Cable) along NH-49 at the location Chainage Km.250.500 to Km.264.700 and across NH-49 at the location Chainage Km.250.500and Km.264.700in Jnarsuguda District of Odisha State
  • Grant of NOC for crossings of 66KV Overhead Transmission line through NHAI roads INH-1338 & NH-80 (proposed bypass)l) for 2X800 MW USCTPP
  • Permission to lay pipe line along and across the NH-200 in Lakhanpur and Jharsuguda block in connection with the project under RWS&S Division, Jharsuguda
  • Permission to lay pipe line along and across NH-200 in Belpahar and Brajrajnagar Municipality in connection with the project “Improvement of water Supply to Belpahar and Brajrajnagar Municipality with Hirakud reservoir as Sources with O&M for 5 years”
  • Permission for laying of 200 dia DI K7 water supply pipeline by MP Jalnigam Maryadit PIU Tikamgarh under Niwari-Prathvipur multi Village Rural water supply scheme District Tikamgarh from km 39+100 (Near Thone/Urdora village) to km 10.000 (near Orchha Tigela) 1.9 km in length along National Highway 76/75
  • Permission for laying Optical Fiber Cable from NH-248A MS-248A MS-104.300 to MS-14.300 and MS123.000 to MS-127.350 for Total section of 14.350 Kms (Alwar-Delhi old Road) ROW applied in the state of Rajasthan
  • Proposal for ROW Permission for laying pipeline parallel to National Highway-151 (Old NH-8D) from Km 114+000 to Km 117+000 (RHS) raising main pipeline for pumping stations for underground drainage project Phase-ll for Veraval-Patan Nagar Palika, in the state of Gujarat
  • Proposal of ROW permission for laying 125mm dia PE Pipeline from Km 222+020 to Km 221+720 (LHS) of NH-27 (Wankaner-Morbi-Samakhiyali) for a length of 300 Mtr, for supply of Natural Gas for Looping purpose from Himmat CPRS Zone to Jet CPRS Zone, -Near Dhuva-Village, Taluka-Wankaner, District-Morbi, in the state of Gujarat
  • Proposal of ROW permission for laying 4" dia Steel pipeline encased with 10” dia casing pipe to set up a Gas Distribution Network in Gondal Taluka & Surrounding Area in Rajkot District: Pipeline laying across to National Highway27 (Rajkot-Porbandar) at (i) Km 151/820, (ii) Km 153/980, (iii) Km 155/170 & (iv) Km 158/200 in District Rajkot in the state of Gujarat
  • Proposal of ROW permission for crossing of Water Supply Pipeline across of NH-27 at Km 228.000 to Km 229.000 for Paneli-Makansar Regional Water Supply Scheme, TalukaMorbi, District-Morbi, in the state of Gujarat
  • Proposal of ROW permission for laying 125 mm dia PE pipeline to set up a Gas Distribution Network in Gondal Taluka & Surrounding Area in Rajkot District: Pipeline laying parallel to NH-27 (Rajkot-Porbandar) from Km 155+170 to km 154+930 (Length 240m) along the pipeline route in District Rajkot, in the state of Gujarat
  • PIU–Salem – Proposal for providing Water Supply to advanced institute for integrated Research on Livestock and animal sciences, Thalaivasal V.Koot road in Salem District of NH-79 (Salem – Ulundurpet Section) by crossing of 500mm dia DI pipe at Km75/770 for a length of 58m by the Executive Engineer, TWAD Board, Salem
  • PIU–Salem – Request of Permission for laying of Sewage water pipeline along the road from Km 14/120 to Km 14/128 (RHS) by Trench Method (8 meter) and crossing and across at Km 14/128 by Trench Less method (HDD) of NH-68 (Salem – Ulundurpet section) in the limit of National Highways by M/s. Jaaidev Hospital (P) Ltd. Salem
  • Permission for laying of 200 dia DI K7 water supply pipeline by MP Jalnigam Maryadit PIU Tikamgarh under Niwari-Prathvipur multi Village Rural water supply scheme District Tikamgarh
  • Proposal seeking permission for laying of SLPE HT UG cable across NH 150 (Kalaburagi-Yadgir Section) at km 5.95 & km 5.97 by M/s KIABD, Bangalore through HDD method
  • Proposal seeking permission for laying of OFC cable along NH 150A from Lingasagur Km 118.00 to Maski Km 149.00 and from Hasmakal Km 152.00 to Sindhanoor Km 171.00 on LHS for a total length of 50.00 kms, through HDD method from km 118.00 to 123.00, KM 145.00 to Km 149.00, Km 152.00 to Km 155.00 & Km 170.00 to 171.00 and through open trench method from Km 123.00 to 145.00 & Km 155.00 to 170.00 by M/s. Telesonic Networks Ltd
  • Proposal seeking permission for laying of OFC cable along NH 150A from Thinthini Bridge Km 89.00 to Gurgunta Km 100.00 for a total length of 11.00 Kms on LHS through HDD method by M/s. Telesonic Networks Ltd
  • NHAI –RO Hyderabad –Permission for OFC repair work in Chintapally, Ayyangaripally viillages and Mahabubabad bypass road as part of Maripeda TE to Mahabubabad TE- (i) Laying of PLB duct and OFC cable from Km.90/0 to Km.90/2+22, from Km.90/4+153 to Km.90/6+0, from Km.91/0+79 to Km.91/4+93, from Km.93/2+113 to Km.93/2+161, from Km.95/4+53 to Km.96/6+23, and from Km.106/4+40 to Km.106/4+139 for a length of 2 Km on Tanamcharla – Jamandlapally section of NH-365 in the State of Telangana (ii) Laying of OFC cables for a length of 20 Km through existing PLB ducts i.e., from Km,77/0 to Km.90/0, from Km.90/2+22 to Km.90/4+153, from Km.90/6+0 to Km.91/0+79, from Km.91/4+93 to Km.93/2+113, from Km.93/2+161 to Km.95/4+53, and from Km 96/6+23 to Km.98/8+101 on Tanamcharla – Jamandlapally section of NH-365 in the State of Telangana
  • 4 laning of Khalghat-Maharashtra section of NH-3- Permission for laying water pipeline crossing at Km 114.503, Km 124.715, Km 130.038 & Km 136.019 of NH-52 by pushing method (Trenchless method) under Nagalwadi micro lift
  • Proposal seeking ROW permission for overhead crossing of 400 KV D/C Mundra-Hadala LILI Overhead Line between Km 251 and Km 252 near Haripur Village, Taluka & District-Morbi in the state of Gujarat
  • Proposal of ROW permission for laying Optical Fibre Cable (4G Project) along the route from Km 97+890 to Km 121+720 on Gadu-Veraval Section (Length–23830 Mtr) on RHS and 5 Road Crossing at Km 98+130, Km 98+490, Km 101+920, Km 102+500 and Km 108+710
  • Nachna-Bagundi RAW Water Pipeline: Proposal for granting permission for laying proposed 52" dia RAW Water pipeline along with OFC across to NH-11 (Phalosi-Jaisalmer section) at Ch. 203/100, in Village-Pokharan
  • NHAI-PIU-NSK - 4/6-Laning of Pimpalgaon - Nashik - Gonde (Km 380 - Km 440) Section of NH-3 in the State of Maharashtra - Power Grid Corporation of India Ltd. proposal for laying OFC in stretches from Km. 417.000 to KM. 431.000 on NH-3 & one crossing at Km. 431.000 on NH-3, Total length- 3.8 Km
  • Request for Approval of ROW of 1.468m for laying of Iron ore Slirry pipeline & return water pipeline in NH-520Utility corridor from Chainage 185+000 to km.215+000 Tata DAV to Koira Iron ore transportation to Intergrated Steel Plant near Kharagpur Area
  • Permission proposal for laying underground Public Utility-“City Gas Distribution (CGD)” pipeline and Optic Fiber Cable along the National Highways from Km 0/000 to 11/000 for a Length of 11000m by open trench method, across at Km 0/00,Km 6/820 & 7/890 by trenchless method(HDD method) and installation of Block valves 4Nos at Km 1/700,Km 4/450,Km 7/100 and Km 10/050 of HN-81 in the state of Tamil Nadu
  • Grant of NOC for Barhi-Rajauli NHAI road project with recommendation for laying of subject water pipeline (Rising Main) and Crossing the Highway
  • Permission proposal for laying underground Public Utility-“City Gas Distribution (CGD)” pipelines along the National Highways from Km 145/800 to 167/880(RHS) and across at Km 141/870,Km 145/800 and 147/975 of HN-47(Salem – Kochi Road) in the state of Tamil Nadu
  • Permission Proposal for laying underground water pipe line along the National Highways from Km 268/380 to 270/080(RHS) and across at Km 270/080 of NH 948(Old NH-209) Bangalore to Coimbatore Road) in the State of Tamil Nadu
  • Proposal for grant of permission for laying optical fiber cable on NH-45 (Ext) at Ratanpur-Bodla Road from Ratanpur Km.0+00 to Darsagar 22+400 total section RoW applied for length of 22+400 Kms, in the State- Chhattisgarh
  • Proposal for ROW permission for parallel laying of Drinking Water 90mm Dia PVC Pipeline from Km 44+150 to Km 45+120, on RHS of NH-53, Village-Tichakpura, Taluka-Vyara, District-Tapi in the state of Gujarat
  • Proposal for grant of ROW permission for crossing OFC through 6" Dia MS-Casing Pipe from GSPL's Lothpur CNG Station in Village-Lothpur, Taluka-Jafrabad, District-Amreli to Chhara LNG Terminal near Village-Chhara, Taluka-Kodinar, District-Gir-Somnath for transportations of Natural Gas OFC across to U/C NH-51 (Old NH-8E) (Una-Mahuva) at Km 146/800 of NH-51 near Nageshree in the state of Gujarat
  • Proposal for grant of ROW permission for crossing 36” Dia Carrier Pipe encased with 42" Dia Casing Pipe from GSPL's Lothpur CNG Station in Village-Lothpur-Jafrabad, DistAmreli to Chhara LNG Terminal near Village-Chhara, Taluka-Kodinar, District-Gir Somnath for Transportation of Natural Gas-Pipiline laying across to U/C NH-51 (Old NHBE) (Una-Mahuva) at Km 146/800 near Nageshree in state of Gujarat
  • Proposal for the construction of an approach road & Slab Culvert for proposed retail outlet of Indian Oil Corporation Ltd. on New NH-47 (Old NH-59) at Ch, 294.550 (294.528-294.573), LHS, Khasra No. 1157/3/1, Patwari Halka No. 42/84, Village-Hatod, Tehsil-Sardarpur & Distt.-Dhar in the State of Madhya Pradesh
  • PIU–Kancheepuram– Proposal for providing Water Supply improvementscheme to Tiruttani Municipality in Thiruvallur District of NH-4 (Karapettai –Walajah section) by crossing of 400mm dia DI pipe at Km 98/423 by the M/s.Tamilnadu Water Supply and Drainage Board, Ranipet
  • Proposal for grant of permission fbr laying of steel GAS pipeline (18") along/ cross NH-752E ( Aurangabad to Paithan Road ) from KMS Ch. 1 +800 to KMS Ch. 0+000 of District Aurangabad
  • Proposal for grant of permission for laying of steel GAS pipeline (18") along/ cross NH-52 on Golwadi Bypass Road, from KMS Ch. 311 +355 to KMS Ch. 310+ 100 of District Aurangabad
  • Regarding permission for Laying of Gas pipeline of 8 inch Dia steel natural gas pipeline from km 23.875 to km 24.299 (RHS), km 34.834 to km 35.127 (LHS), km 35.127 to km 34.798 (RHS) along old NH 15 in Pathankot Amritsar section Highway from Village Mari Buchian Tehsil Batala, District-Gurdaspur in the State of Punjab by open cut method and where open trenching is not feasible as notified by concessionaire there by HDD method and 1 Crossing at km 35.127 by HDD method
  • Four Laning of Solapur-Maharashtra/Karnataka Border Section of NH 9 from Km. 249/000 to Km. 348/800 to be executed on BOT (Toll) Basis in the State of Maharashtra under NHDP Phase-III
  • Application for the permission for construction & use of approaches/access road for proposed Retail Outlet at old NH-69 (New NH-46) Obedullaganj to Budni, Hand Written Ch. 5.411, RHS, Part of Survey No.-7/2, Ph. No. 10/18, Village-Bhiyapur, Tehsil-Goharga
  • Regarding permission for crossing of 11 KV Electricity cable at Km.79.045 (LHS to RHS) along new NH-5 in section of Kharar-Ludhiana section at Village Bholapur, Tehsil Sahnewal, District-Ludhiana in the State of Punjab by HDD method
  • Regarding permission for Laying of Gas pipeline of 8 inch Dia Steel Natural Gas Pipeline of IVI/s GSPL from km 0.275 to km 0.851 along a I\tH 07 in Bathinda- Malout section Highway from village Buladewala district- Bathinda in the State of Punjab by open trench method
  • Proposal for NOC for access permission to the proposed fuel station on NH-46 (Old NH-12) Ch 397 (Ch 396.755, RHS Part of survey no. 64, 65, 66, 67 & 69/5 in village-Jharkheda, Tehsil-Shyampur, Distt-Sehore (MP)
  • Proposal for permission for laying overhead electric line by M/s. BVIMS, Kota between Km. 1061+500 to 1062+700 (LHS) (Total 1.2 Km length) on Kota Bypass section of NH-27 in the State of Rajasthan
  • Access Permission for laying of underground Natural Gas steel pipeline of 125/90mm dia of M/s. Gujarat Gas Ltd along NH-927D from Km 9.260 to Km 14.630 on Left Hand Side in Village-Raydi, Taluka-Jamkandorna, District-Rajkot in the State of Gujarat
  • Permission for laying underground OFC as per enclosed drawings along Amber Kunda to GP Hospital, Delhi road route from Ch, 100 to 5220.00 m RHS (Length 5.186 Km.) & 01 Road crossing. Total section of ROW applied is 5.186 Km. in the state of Rajasthan
  • Permission for laying underground Optical Fiber Cable as per enclosed drawings(Site ID-I-RJ-ABER- ESC-0015 & I-RJ-ABER-ISC-0018) from JW Marriot Jaipur Resort to Delhi-Jaipur Highway NH-248 to Shiv Vilas Place Jaipur, Rajasthan. Total section of ROW applied is 2.300 Km, in the state of Rajasthan
  • Water Grid Project – Providing Drinking water supply scheme to Uddanam Area of Srikakulam District - Laying of Drinking Water Pipelines along and across NH-16 from Km 477+330 to Km.532+100 – Request to host in the Webportal
  • Regarding permission for Laying of Gas pipeline of 8 inch Dia steel natural gas pipeline from km 185.304 to km 186.202 by HDD method along a NH 354 in Gurdaspur Dera Baba Nanak section Highway from Village Desh Bharat Nagar and Nabipur, district-Gurdaspur in the State of Punjab by open cut method
  • Four laning of Solapur to Vijaypura section of NH-13 (NEW NH-52) from Ch. 0/000 to Km. 110/542 in the state of Maharashtra & Karnataka on BOT Mode- Proposal for the carry out the HDD for laying of 1168mm Dia MS pipeline at Ch.02/480
  • Permission of laying & crossing of pipeline along & across Talcher- Kamakhyanagar NH-53 (Old NH-200) for Mega Rural Piped Water Supply Project under RWS&S Division, Angul at Talcher- along the chainage Km.8+500 to 9+450 (LHS) across the chainage Km.9+440 & 9+442
  • Four laning of Mangalwedha Solapur section of NH-166 from Ch. 321/600 to Km. 378/100 (PKG-IV) in the state of Maharashtraon Hybrid Annuity Mode- Proposal for the carry out the HDD for laying of 1168mm Dia MS pipeline at Ch.373/485
  • NHAI-RO Kerala--Four laning of Kazhakuttam to Mukkola section from Km 0+500 to Km.26+500 of NH-47 (New NH-66) in the State of Kerala under NHDP Phase-III on EPC mode-Laying of 11 KV UG cable from Km.19+925 to Km.20+025 near Diamond Palace Hotel
  • Proposal for final access permission to private property of “M/s Jeet Dhaba and Restaurant” at Km. 210.140 (RHS) of NH-1 (New NH-44) Village Patti Jatan, Tehsil and Distt. Ambala in the state of Haryana
  • Permission Proposal for laying underground Optical fiber cable along from Km 153/390 to 153/510,Km 164/400 to 164/800, Km 166/080 to 166/170(LHS) and across at Km 166/080,Km 166/170 on Salem- Cochin road of NH-54 in the State of Tamil Nadu
  • NHAI-PIU-Kolhapur- Four laning of Sangli-Solapur (Package-l, Sangli-Borgaon) section of NH-166 from existing km 182.195 (Design chainage Km 182.556) to existing Km 219.956 (Design Chainage Km 224.000) of length 41.444 Km in the state of Maharashtra on Hybrid Annuity Mode - Permission for laying OFC cable along NH-166 from Km 191.100 Ankali Phata Chowk Miraj to Km 191.900 Katchi Complex Chowk Miraj on Kolhapur - MirajSangola-Solapur for a total length of 0.800 Kms
  • NHAI-RO Kerala- Six Laning of Kadambattukonam (Design Ch. 517.250) - Start of Kazhakuttam Flyover (Design Ch. 547.080) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana-Laying of OFC cable from Km.545+200-Km.545+800(LHS & RHS) and crossing at Km.545+200 & Km.545+800 by M/s TATA Communications Ltd.