Sorry, you need to enable JavaScript to visit this website.

You are here

  • Request for NOC for laying of underground gas pipe line (4" Dia Carbon Steel Pipe) and 125 mm Dia MDPE Gas Pipeline (HDD Method/Trenching) of M/s Indraprashtha Gas Limited, from Ch.100.340 to Ch.102.050 (LHS) along the NH and crossing at Ch.102.050 on NH, total section length for along the ROW applied is 1.710 km. and crossing length is 60.0m on along Meerut to Haridwar Road, New NH-334 (Old NH-58) in the State of Uttar Pradesh
  • Proposal for grant of permission for construction of 765KV GIS SS Rampur Overhead Crossing of LOOP IN Circuit of LILO of 765 kV S/C Ghatampur Hapur at Km.202.837 of Moradabad-Bareilly Section of NH-530 (Old NH-24) in District- Rampur in the State of Uttar Pradesh
  • Proposal for grant of permission for construction of 765KV GIS SS Rampur Overhead Crossing of LOOP OUT Circuit of LILO of 765 KV S/C Ghatampur Hapur at Km.200.534 of Moradabad-Bareilly Section of NH-530 (Old NH-24) in District- Rampur in the State of Uttar Pradesh
  • Proposal from Nashik Municipal Corporation (NMC) for Laying Water Supply Pipeline of dia. 500 mm along NH-3 from Km. 417+600 to Km. 418 (LHS), Total length 400 m. in the State of Maharashtra
  • Permission for laying of underground water Pipeline (For Agriculture Purpose) along the extreme edge of the NH boundary from Km 100+490 (RHS) to Km 103+740 (RHS) and across Km 100+720 in Kolarpatti & Gomangalam Villages, Pollachi Taluk, Coimbatore District – (Madathukulam to Pollachi section) of NH-209 (New No.83) in the State of Tamilnadu
  • Laying of underground water Pipeline along the extreme edge of the NH-38 boundary from Km 300+900 (LHS) to Km 303+300 (LHS) and Km 300+670(RHS) to Km 301.100(RHS) and across Km 301+100 in the State of Tamilnadu
  • Proposal for crossing of 11KV Transmission through UG cable (01 No) at Khojna-Khirak between chainage km 13.940 to13.990 for providing the drinking water facilities to Golara, Bachali and Tilaitha group of Village under Jal Jivan Mission (Drinking water scheme)
  • Proposal for permission for laying of pipe along and crossing National Highway NH-39 under Dhawarra Sijwaha and Lachura Kashipura Group of Villages water supply scheme in District-Mahoba (Based on Surface water) and relevant work including commissioning and operations & maintenance for 10 years
  • Conversion of Delhi-Gurgaon Section of NH-8 Access Controlled Eight/Six lane Highway from Rao Tula Ram Marg junction (Km.14.300) to Km. 42.000 Gurgaon in Haryana on BOT basis. Implementation of Delhi-Gurugram- SNB Regional Rapid Transit System (RRTS) Corridor
  • Proposal seeking ROW Permission for Crossing NH-53 by underground cable line Pro. 66KV S/C from 220KV Ichhapore-ABG (PDC) line up 66KV Mora SS by 66KV 1C*360 Sqmm (3+1) underground power cable at Km 9+960 between Km 9+000 & Km 10+000 from Hazira on NH-53 in between Hazira-Palsana near Hazira Chokdi, Mora Village, District Surat in the State of Gujarat
  • Proposal seeking ROW Permission for laying Proposed MS, Water Pipeline across NH- 48 for providing basic utility service at crossing NH-48 (1) Km 146+820, 125MM dia PVC carrying (400 MS casing) at Village-Manglej, (2) Km 154+575 600MM Dia DI carrying (1200 MS casing) Village-Karjan, (3) Km 160+560 200 MM Dia PVC (400 MS casing) at Village-Lakodara, Taluka-Karjan, District-Vadodara in the State of Gujarat
  • Proposal seeking permission for laying raising main pipes across the Vijayapur - Sankeshwar National Highways No.548B at CH.87.300 Kms of NH and at CH.9.120 Kms of Rising main of Basaveshwar (Kempwad) Lift irrigation Scheme in Athani taluk of District, Belgavi for Lift irrigation Purpose by Karnataka Neeravari Nigam limited
  • Rehabilitation and up-gradation of existing 2 lane to 4-lane standards of Rimuli (Km 163.000) to Koida (Km 206.200) Section of NH-215 (New NH-520), i.e. Package-I in the State of Odisha on EPC Mode under NHDP Phase-Ill on EPC Mode
  • Four laning of Puducherry (Km.29/000) to Poondiyankuppam (Km.67/000) NH-45A on HAM under NHDP Phase-IV in the State of Tamilnadu & UT of Puducherry- laying 8" dia CS & MDPE 125mm Gas Pipeline across existing NH-45A (Exs. Ch. 70+716) by HDD method across NH in the State of Tamilnadu
  • Proposal for grant of permission for laying of proposed 36" dia (Carbon steel Pipeline) along with OFC conduit (89 mm dia MS casing) across NH-25 (Kaparda -Bilada, District- Jodhpur for Mundra - Panipat crude Oil Pipeline of M/s IOCL) at Km. 239.296 of Bar-Bilara - Jodhpur section in the State of Rajasthan
  • Proposal for Erection of 230 KV Overhead Transmission line crossing at km 248+ 400, Proposal submitted by Superintending Engineer ,TANTRANSCO, GCC Madurai in the State of Tamilnadu
  • Proposal for NOC permission for laying of water supply pipeline parallel and road crossing on NH 26 of Jhansi- Lalitpur section at (Ch. 42.720 to 49.332 Km RHS) and (Ch. 49.332 to 56.210 Km. LHS) and (under Kasedakala – Mau Village Samuh Gramin Payjal Yojna) in the State of Uttar Pradesh
  • Permission for erection of 22 KV Double circuit Over Head line EB Pole & line along the road from Km 148/445 to Km 152/080 on RHS & across NH at Km 152/080 in Thirumayam - Manamadurai section of NH-226 in the State of Tamilnadu
  • Application/Proposal of M/s DFCCIL for crossing of 132KV D/C Tapri TSS (IR) -Talheri TSS (DFCCIL) line at Ch. 5+300 (near Village-Dagrauli-Gangoli, District-Saharanpur) on NH-73(New NH-344 BG) in the State of Uttar Pradesh
  • Proposal for Erection of 110 KV SC Overhead line crossing at Km 36+200 of NH- 7A - Proposal submitted by Superintending Engineer, TANTRANSCO, Tirunelveli in the State of Tamilnadu
  • Laying of underground 12" Steel Gas Pipeline along NH-65 from Km 386.630 to Km 388.462 and crossing at Km 386.630 and installation of underground sectionalizing Valve (Chamber size: 2.85m x 2.40m) at an interval of 3 Kms approximately in Bidar District in the State of Karnataka
  • Permission for laying of overhead transmission line crossing in between km 117.00 to km 118.00 of NH-60 (New NH-14) in respect of Construction of 132KV D/C line with ACSR conductor Midnapore to Kharagpur (WBIDC)
  • Proposal of NOC for permission for laying of Carbon Steel Underground Gas Pipeline along to NH-19 for providing connectivity to Maa Vaishni CNG station at RHS side near Usaini, Raja ka Taal, District-Firozabad (from chainage 229.439 Km. to chainage 231.055 Km.) in the State of Uttar Pradesh
  • Design and Build of all system components of composite water supply scheme for sustainability and quality in Chandrapur and Dimoria Development Block of Kamrup District including 5 years Operation and Maintenance on DBOT
  • Request for approval of installation of a new Fuel Station (Retail Outlet) on a plot of land abutting on Right hand side boundary of NH-37(old)/27(new) towards increasing chainage in Km. 226.945 at village-Kholapather, Mouza-Uttar Khula, dag No. 345, District-Marigaon, State- Assam
  • Four Laning of Ahmedabad to Godhra Section of NH-47 from Km. 4.200 to 122.420 in the State of Gujarat on DBFOT Basis under NHDP Phase-III. Proposal seeking ROW permission for laying and crossing DI Clear Water Pipeline through NH-47 across at Km 6+343 & Km 11+700 and along Km 11+700 to Km 11+900 in the State of Gujarat
  • Permission for crossing of under construction LILO of one circuit of 66 KV D/C Line form 220KV S/stn. Roj-Ka-Meo to 66KV sohna at 66Kv S/S/tn. Nimoth with under construction Delhi Vadodara Expressway NH-148N, Near Baluda Village, in District Gurugram in the State of Haryana
  • Proposal for NOC permission of water supply pipeline for laying & crossing by HDD method in Km.39.800 to Km.44.734 (Barokharkhurd-Rehuna) of NH-35(76) at Tehsil & District- Banda in the State of Uttar Pradesh
  • Proposal of M/s Indian Oil-Adani Gas Pvt. Ltd. for permission of laying 8" NB Carbon Steel Gas Pipeline on RHS from Ch. 47+980 to Ch. 51+100 of NH-87 & laying 8" NB Carbon Steel Gas Pipeline on LHS from ch. 51+100 to Ch. 52+200 (Haldwani Tiraha) of NH-87(New NH-109) & NH road crossing at Ch.47+980, Ch.49+480 & Ch.51+100 of NH-87 in Udham Singh Nagar District of Uttarakhand State
  • Proposal seeking ROW permission for laying 200mm Dia-HDPE Pipe & 33KV 300sqmm XLPE Power cable at Km 668+050, Km 668+150, Km 670+130 and Km 670+150 of NH-14 (NH-27) in the State of Rajasthan
  • Four laning of Rohna-Hassangarh-Jhajjar section of NH-334B (Pkg-II) from Km.44.800 to km.80.250 (Total Length 35.450 Km.) on HAM basis in the State of Haryana-Proposal for laying of underground electric cable line of 33KV for crossing NH-334B at km. 61+028 for UHBVN Rohtak in District Jhajjar in the State of Haryana by HDD method
  • Proposal for grant of Permission for laying of Sewerage Pipe Line from Km. 450.204 to Km. 451.117 (RHS) and Km. 450.211 to Km. 450.321 (LHS) along old NH-01 (New NH-03), at Amritsar Bypass in the State of Punjab by HDD method
  • Proposal for grant of permission for laying 8”/4” NB MS Gas Pipeline along/across NH-79 (New NH-48) from Km. 170.250 to 182.650 (LHS) (Ajmer to Bhilwara road), total 12.580 Km. length to develop City Gas Distribution Network in Bhilwara City and its surrounding area under Bhilwara & Bundi GA by M/s. Adani Gas Ltd. (AGL)
  • Proposal for grant of permission for laying/road crossing 33 KV XLPE Cable/Duct for road crossing and laying 33 KV XLPE Cable at Km. 216+550, Km. 216+600 of NH-65 (Beawar-Pali-Pindwara) at Village-Paldi-M, Tehsil-Sheoganj, Distt-Sirohi in the State of Rajasthan by JdVVNL
  • Proposal for grant of permission for laying proposed 8” dia Steel Gas Pipeline encased in 14” dia casing underground crossing across NH-25 (Sangariya Bypass Jodhpur Ring Road) by HDD method for 60 mtr at Ch. 26.172 to develop City Gas Distribution Network in Jodhpur City and its surrounding areas en-route NH under Jodhpur Geographical area by M/s. AGP CGD India Pvt. Ltd.
  • Proposal for grant of permission for 220 KV overhead transmission line crossing NH-8 (New NH-48) of Delhi-Jaipur road, Haryana. The work of diversion/height raising work at Ch. 66.050, Ch. 74.750, Ch. 75.840 & Ch. 86.00 (total 04 nos. crossing) of 220 KV Transmission lines infringing Delhi-Gurugram-SNB Regional Rapid Transit System (RRTS) Corridor by M/s NCRTC in the State of Haryana
  • Application for the permission to lay off 12” dia Natural Gas Pipeline along with 40mm OFC Parallel to NH-44 at Km. 550+057 to 549+519 Village-Madai, Tehsil-Lakhnadon, District- Seoni in the State of Madhya Pradesh.Application for the permission to lay off 12” dia Natural Gas Pipeline along with 40mm OFC Parallel to NH-44 at Km. 569+885 to 568+150 Village-Dungariya, Tehsil-Chhapara, District- Seoni in the State of Madhya Pradesh.
  • Permission seeking ROW permission for laying U/G Sewer Pipeline of Bhachau Nagarpalika Across at Km 325+206 and along between Km 324+300 and Km 325+206 on RHS & Km 325+206 and Km 325+700 on RHS of NH-41 at Taluka - Bhachau, District- Kutch in the State of Gujarat
  • Proposal seeking permission to laying of water pipeline for drinking water scheme along NH 275 from Kabaka Km 10.200 to 10.850 on LHS (650 m), from Km 10.850 to Km 11.100 on LHS (250 m), from Km 11.100 to Km 11.400 on LHS (300 m), from 11.400 to Km. 12.000 (600 m) on LHS, Km 12.000 to Km 12.400 (400 m) on LHS, from Km 12.400 to Km 13.600 (1200 m) on LHS, Km 13.600 to Km 14.150 on LHS (550 m), from Km 14.150 to Km 16.200 on LHS (2050 m), and from Km 16.200 to 16.450 on RHS (250 m), from Km 16.450 to Km 16.850 on RHS (400 m), from Km 16.850 to Km 18.100 on RHS (1250 m) for a total length of 7.90 m through open trench method and three road crossing at Km 11.400, Km 14.100 & Km 16.850 through HDD method in the State of Karnataka by Municipal Commissioner, Puttur City Municipal Council
  • Proposal of NOC for laying of Electrical cable (132 KV U/G XLPE cables 630 Sq.mm (4 Nos.) of M/s Amba Shakti Steels Limited from Km.109.857 (RHS) to Km.111.401 (RHS) (Total length- 1544m) on NH-58 (New NH-334) (Delhi to Haridwar Road) at District-Muzaffarnagar in the State of Uttar Pradesh
  • Construction of proposed Fuel Station (Retail Outlet), on a plot of land abutting on the right hand side boundary of NH-37 towards increasing chainage in Km. 1022.420 at village; Banglipara, Mouza – Bhabanipur, District-Barpeta, Assam
  • Approval of installation of a new Fuel Station (Retail Outlet) on a plot of land abutting on Left hand side boundary of NH-37(old)/27(new) towards increasing chainage in Km. 226.905 at village-Kholapather, Mouza-Uttar Khula, dag No. 348, District-Marigaon, State-Assam
  • Proposal for permission for crossing of 2 nos Transmission Electrical line 132KV overhead of National Highways, Narmada Valley Development Authority Division No.08, Sanawad at proposed 4 laning of Raghavgarh to Nanasa section of NH-47, design Ch. 36+602, Ch. 35+545 at Village-Bhamori, Tehsil- Bagli, District-Dewas in the State of Madhya Pradesh
  • Proposal of permission for water pipeline along both sides and across NH-33 for Ramgarh, Chittarpur & Dulmi Water supply Scheme (Part-B)
  • Four Laning of Kazhakuttam to Mukkola section (Km.0+000 to Km.26+500) of NH-66 in the State of Kerala under NHDP Phase-III on EPC mode- Crossing of new M/s AG&P City Gas Pvt.Ltd. gas pipeline at Km.02+272, Km.10+300 and Km.12+105 in Thiruvananthapuram Bypass
  • Permission for upgradation of existing 132 KV D/c Tower line into 220 KV M/c overhead tower line to be constructed by the M/s Torrent Power parallel to NH-147 between km 35/900 to km 40/900
  • Six laning of Existing Kozhikode Bypass (i.e. Vengalam Jn. to Ramanattukara Jn.) from km 230.400 to km 258.800 (Design Chainage) of NH-66 in the State of Kerala under NHDP Phase-III on Hybrid Annuity Mode -Crossing of new M/s IOAGPL gas pipeline at Km.245+605 in Kozhikode Bypass
  • Proposal for grant of permission for laying underground PHED Pipeline dia 350mm DI K-7 along NH from Mahabar Fanta to towards PWD NH Barmer (Chouhatan Choraha) on NH-68 (Barmer-Gandhav Bridge) from Km. 155+500 to 155+873 (0.373 km length) & crossing at Km. 155+873 (All Open Trench) under service road in the State of Rajasthan by PHED
  • Proposal for Crossing of underground 12" dia. Gas Steel Pipeline across NH-218 Bijapura-Hubli section (Kulgeri-Gaddanakeri) at ch. 77.700, 79.850, 81.390, 101.500, 107.600 & to 111.530
  • Permission for laying of 90, 110 & 140mm dia HDPE water pipeline from Jat Mohalla to Janpad Karyalay (Km 59.550 to Km 60.372) and crossing by HDD method at Jat Muhalla Km 59.550 and Jal Sthambh chouraha 59.850 Km along NH-347BG (Indore-Deshgaon Highway) at Barwah for Water Supply Scheme under UIDSSMT
  • Permission for laying underground 8” dia Carbon Steel Gas Pipeline of M/s. Indraprastha Gas Ltd. (IGL) from Km. 0.00 (near Naya Ganv) to 5.600 (RHS) and Km. 5.600 to 6.100 (LHS) (near Silora Industrial Area) along NH-48 and crossing of NH at Km 5.600 of Kishangarh-Gulabpura) section of NH-79 (New NH-48) in the State of Rajasthan
  • Proposal for grant of permission for design and execution of Dholpur Lift Irrigation cum Drinking Water project with intake point in Chambal River Dholpur District- Rajasthan on EPC basis (Single Responsibility Turn-Key Project) and its O&M of 8 years - Permission required for HDPE Pipeline 7 nos. crossing between Km. 0.650 to 12.120 under Uncha-Nagla-Dholpur section of NH-123 by EE Water Resources Division-II, Dholpur using HDD method
  • Proposal for grant of permission for laying 8”/4” NB MS Gas Pipeline along/across NH-27 from Km. 895.800 to 897.00 (RHS) (Udaipur-Kota road), total 1.200 Km. length to develop City Gas Distribution Network in Chittorgarh City and its surrounding area under Udaipur & Chittorgarh GA by M/s. Adani Gas Ltd. (AGL)
  • Four laning of Panikoili-Rimuli section of NH-215 (New NH-20) from km. 0.000 to Km.163.000 (Design Chainage km. 0.000 to Km.166.173) in the State of Odisha, 4-L of 145.123 Km currently under Operation & Maintenance Stage and 21.05 Km under implementation stage through balance work project
  • Four laning of Hisar to Dabwali Section of NH-10 from Km. 170.000 to 227.000 with paved shoulder in the State of Haryana on EPC Mode (Package-I) - NOC permisison for laying for underground crossing for 11KV at Km. 175.200 on NH-9 (old NH-10) at District Hisar in the State of Haryana by HDD Method
  • Proposal for permission of underground crossing of 2 nos.,11 KV, 3x70 Sq.mm XLPE insulated cable by HDD method at Km. 30+310 on NH-27 Lucknow-Kanpur section of at Sohramau & District Unnao in the State of Uttar Pradesh
  • Permission for laying 500 mm dia DI pipeline from km 8.267 to km 8.507, 350 mm dia from 8.507 to km 12.240 along NH-112 (old NH-35), two trenchless from km 9.250 to km 9.770 with 350 mm dia DI pipleine(HDD) & 900 mm dia MS pipe pushing along NH-112 (old NH-35) at km 12.240 (Joypul More criossing by HDD method (Length - 3.984 km) in connection with Habra-Gaighata surface water supply scheme under Barasat Division, PHE Dte. in the State of West Bengal
  • Permission for laying 750 mm dia from km 26.35 to km 27.00, 600 mm dia from 27.00 to km 32.800, 500 mm dia from 32.800 to km 34.31 along NH-112 (old NH-35) with trenchless pushing of 750 mm dia at km 26.888 under surface based water supply scheme for Arsenic affected areas of Habra, Gaighata and adjoin mouza under, PHE Dte., Barasat Division, West Bengal
  • ROW permission for laying of secondary rising main across NH-35 from km 17.246 tio km 21.148 (Baluigachi More to Building More) with NH crossing at Building More in connection with Habra-Gaighata surface water supply scheme under Barasat Division, PHE Dte. in the State of West Bengal
  • Four Laning of Melur (Design Km.0+000/ Existing Km.99+920 of NH-38) to Karaikudi (Design Km.45+855/ Existing Km.12+900 of NH-383 Ext) on EPC mode under Bharatmala Pariyojna in the State of Tamilnadu – Permission for laying of Water Pipeline along from Km.15+500 to Km.16+070(RHS), across from Km.16+050 to Km.16+070(LHS) and crossing at Km.16+050 of Melur to Karaikudi Section of NH-338,383 & 38 in the State of Tamilnadu
  • Proposal seeking ROW permssion for laying proposed 500mm and 600mm Dia DI K9 rising main pipe line across NH-151(Jetpur-Somnath) at Km 28+040 and Km 38+000 for Junagarh Trunk Sewer Collecting System and Sewerage treatment plant project Tal-District-Junagarh in the State of Gujarat
  • Proposal seeking ROW permission for laying of 33KV Underground Cable Line with 3CX300 sqmm XLPE Power Cable from Ambujanagar Plant to Muldwarka facility on NH-51 crossing at Km 229+600 to be with UG Cable at LOC Navagam Fatak (Corridor Road Crossing), Near Navodaya Vidhyalaya, Kodinar in the State of Gujarat
  • Proposal seeking ROW permission for laying of Portable Water Pipeline on NH-8E (Kodinar-Veraval) Along Km 238+700 to Km 240+700 on RHS and Km 243+900 to Km 254+400 on LHS and Across at Km 241+200 and Km 243+900 in the State of Gujarat